0% found this document useful (0 votes)
2K views

Work Flow - HVAC+MEP

The document outlines a generic workflow for a mechanical engineering group with the following key stages: 1) Preparation of a work execution plan including deliverables, schedules, and resource requirements; 2) Conceptual, schematic, and design development stages involving surveys, calculations, and coordination with other groups; 3) A tender stage involving updated drawings, specifications, and bills of quantities for approval.

Uploaded by

ravue
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
2K views

Work Flow - HVAC+MEP

The document outlines a generic workflow for a mechanical engineering group with the following key stages: 1) Preparation of a work execution plan including deliverables, schedules, and resource requirements; 2) Conceptual, schematic, and design development stages involving surveys, calculations, and coordination with other groups; 3) A tender stage involving updated drawings, specifications, and bills of quantities for approval.

Uploaded by

ravue
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

GenericWorkflowfortheMechanicalEngineeringGroup

Study
Contractual
Scope

DesignRequirements

SubmittalRequirements

DeliverySchedules

AnySpecialTechnology

Preparethe
work
executionplan

WorkMatrixperService

ListofDeliverables(Per
Stage)

WorkSchedule

ResourceRequirements

Conceptual
Design

SiteSurvey

StudyArchitecturalPlans

PreliminaryUtility
Calculation(MEP)

Basisofdesign

CDApproval

Schematic
Design

StudyClientComments
onCD

StudyDetailedArch.
Plans

UpdateCDPackage
includingUtility
Calculations

PrepareRiser,
Schematics,Demolition
Plans,FloorPlansto
defineshafts&MEP
roomsizes

CoordinatewithArch.,
Structure&Electrical

SDApproval

StudyArchPlans

HVAC,Plumbing,
Irrigation,MG,FF,
SpecialtySystems
CapacityCalculations

FloorPlans,Standard
Details,Schedule,BMS

CoordinatewithArch.,
Structure&Electrical

FinalizethePackage
afterdetailed
coordination

DDApproval

UpdatedPackage
includingCalculations,
Drawings,Schedules

BOQCalculationFiles

PrepareConsolidated
BOQs

PrepareProject
Specifications

TDApproval

Design
Development

TenderStage

GetalltheArch.
informationtostartDD

UpdateDDComments

DesignCoordination
(Internal&External)