Inspection and Test Plan: Offshore Pipeline Recertification
Inspection and Test Plan: Offshore Pipeline Recertification
TITLE
PROJECT
CLIENT
THIRD PARTY
:
:
:
:
R : Review Document
V: Verification
P: Provide/Perform
H: Hold Point
A: Approve
W: Witness
* Legend of Responsibility :
C : Client
NO.
ACTIVITY
VERIFYING
DOCUMENT
ACCEPTANCE
CRITERIA
C
A.
B.
SURVEILLANC
RESPONSIBILIT
TP
QMS Documentation
Standard Procedure
Standard Procedure
Standard Procedure
Standard Procedure
Standard Procedure
Standard Procedure
8. Modification/Repair Procedure
Standard Procedure
Design Document
Design Document
Design Document
Design Document
Design Document
Page 1 of 12
P: Provide/Perform
H: Hold Point
A: Approve
W: Witness
* Legend of Responsibility :
C : Client
NO.
ACTIVITY
VERIFYING
DOCUMENT
R : Review Document
V: Verification
ACCEPTANCE
CRITERIA
C
2.
SURVEILLANC
RESPONSIBILIT
TP
Design Calculation/Analysis
a. Wall Thickness Calculation
Design Report
Design Report
Design Report
Design Report
Design Report
Design Report
Design Report
b. Anode
Anode Certificate
c. Coating
Coating Specification
5. Pipeline Drawings
Page 2 of 12
P: Provide/Perform
H: Hold Point
A: Approve
W: Witness
* Legend of Responsibility :
C : Client
NO.
ACTIVITY
VERIFYING
DOCUMENT
R : Review Document
V: Verification
ACCEPTANCE
CRITERIA
C
SURVEILLANC
RESPONSIBILIT
TP
MTO/Data Sheet
Material Certificates
SKPP
Government Regulation
Periodic Report
Periodic Report
Periodic Report
7. Material Certificates
Page 3 of 12