Cable Installation, Glanding, Terminating & Testing"
Cable Installation, Glanding, Terminating & Testing"
com/basics/breaking-down-basics-cable-pulling
http://egt.net.au/apprentices/workplace-health-safety/safety-alerts/
https://www.google.com/#q=Cable+Stand+safety
The Site Supervisor must inspect all cable pull set ups and routes prior
to commencement of the cable pull
Ensure cable stands and rollers are suitable for the task (Retained
cable drum shaft, solid drum stands and rollers rated for the weight of
the cable drums, roller assemblies are welded set up by competent
personnel
Ensure any cable pulling rope and tackle is correctly rated and suitable
for the job
The team leader is the only person that can commence the cable pull
however anybody can call a stop to the operation
carefully
planned
prior
of
to
the
risk
Once the cable pull has commenced, continue the pull at a steady
pace, and
Do not stand in the line of the pull and keep a safe distance from the
cable drums
Damaged cables, sockets and plugs must be removed from service immediately.
Electrical equipment must not be pulled or lifted by the cable, the connections may
equipment.
All electrical cables shall be neatly tied off where necessary so as not to present a
trip hazard. Where such wiring must run across floors it must be protected by
saddles, conduit or armouring. Extension cables, when used, must be routed so as
devices.
All electrical fittings must be rated for the environment in which they are to be used.
Consideration must be given to exposure of the equipment to wet conditions,
extremes
of
temperature,
potentially
flammable
atmospheres,
etc.
Portable
All portable tools, cables etc. must be regularly inspected. Check equipment before