Testing & Commissioning Document For Elevators
Testing & Commissioning Document For Elevators
Building Name
Address
Machine Details
Elevator Type
Manufacturer
Traction Machine
7 - Sense
Gregory Road, Colombo 07.
L-5
Grearless Traction Machine
Mitsubishi Electric
Model No
Serial No
Control
Operation
Rated Load
Rated Speed
Door Type
Door Opening Size
Motor (kW)
Installation Drawing No.
Power Supply
Floors Served
Buffer Type
Car
Counter Weight
PM011SS
L1911141577
VVVF
825Kg
105 m/min
Center Opening
900mm (W) x 2100mm (H)
8.9 kW
400V / 3ph / 50Hz
B2, B1, G, 1, 2, 3, 4, 5, R
Spring, Hydraulic
Spring, Hydraulic
2. STATIC EXAMINATION
Yes
Yes
Yes
3. LOAD TEST
Up
Load
%
Weight
(kg)
IS (A)
IR (A)
0
50
100
840
15.9
16.1
Speed
(m/min)
Down
Voltage
(V)
IS (A)
IR (A)
416
0.5
0.1
Speed
(m/min)
Voltage
(V)
418
Page 1 of 5
IS - Starting Current
IR - Running Current
4. DOOR TESTS
1.83 (s)
2.77 (s)
5. TIME DELAYS
4.68 (s)
Full Load
24 V d.c
7. EARTHING
Yes
Yes
Electrical
Up 2.18 m/s
Mechanical
2.27 m/s
9. LIMIT SWITCHES
Yes
Page 2 of 5
1200mm
1000mm
190mm
90mm
Speed up
20 m/min
Speed down
20 m/min
Yes
13. GENERAL
Yes
In Order
Ventilation Fan
In Order
Arrival Gong
In Order
In Order
In Order
Operation of Emergency
Rescue Device.
In Order
Operation of Interphone
No
In Order
15. DECLARATION
We certify that on 10/09/2015 the equipment was thoroughly examined and found to be generally
complying with requirements except the snagging list (Annexure 01).
For Consultant:
Signature : ..............................................................
Name : .....................................................................
Date : .......................................................................
Signature : ..............................................................
Name : .....................................................................
Date : .......................................................................
Page 4 of 5
Annexure - 01
SNAGGING LIST
1.Emergency/Maintenance lamps shall be fitted at each level of the lift shaft and lamps at
every other floor shall be battery backed.
2. A smoke detector shall be fitted on the soffit of the lift shaft and a remote indicator shall be
fitted at the entrance of the roof floor.
3.Link between the Fire alarm panel shall be established
4.All fixtures where protective coating damaged, shall be recoated with protective coating.
5.Interphone connection shall be established.
Page 5 of 5