ISI Reballing September 2012
ISI Reballing September 2012
September 2012
www.isipkg.com
Handling
Production
Controls for temperature
Humidity
ESD protection
Ball size/position tolerance specifications
Automation
Cleanliness
Inspection
Repackaging
The component
temperature exposure is
minimized during the ball
removal process.
ISI Reball
Certification
All parts are reballed using
a custom temperature
profile in a nitrogen
environment.
Reballing
Ball Placement
10
11
12
ITAR registered
North American
facilities
13
Thank you!
For more information, please visit www.isipkg.com