43-O&C Strip Sealing Machine
43-O&C Strip Sealing Machine
Indchemie
Thana, Baddi
Issue No.
Revision No.
Effective Date
Review Before
Page No.
01
03
05.06.2011
05.06.2013
1 of 6
1.0
OBJECTIVE
To lay down a procedure for operation and cleaning of Strip Packing Machine.
2.0
SCOPE
This procedure shall be applicable to operation & cleaning of strip sealing machine,
installed packing area of beta lactam block.
3.0
RESPONSIBILITY
Production Operators / Chemist / Officer
IPQA Chemist / Officer
4.0
ACCOUNTABILITY
Head - Production
5.0
5.1
5.1.1
5.1.1.1
PROCEDURE
Pre start up
For same batch of the same product.
The Production Chemist / Officer shall visually inspect the machine and room for
5.1.1.2
5.1.1.3
5.1.1.4
cleanliness.
Ensure that previous run was of the same batch number of the same product.
Ensure that the material lying in the room is of the same batch which is to be continued.
Check the temperature and relative humidity of the area and record it in the
environmental control record. If it is within the specification as per the BPR, continue the
operation. If not, do not start the operation and inform the Production Executive / Officer
5.1.2
5.1.2.1
5.1.2.2
5.1.2.3
5.1.2.4
room.
Affix the "CLEANED" on equipment & put the "STATUS LABEL".
Check the released material (which is to be taken on the machine) for batch identity and
bring them in the strip packing room from the tablet store.
Particulars
Sign.
Date
Name
Prepared By
Checked By
Approved By
Authorized By
Indchemie
Thana, Baddi
Issue No.
Revision No.
Effective Date
Review Before
Page No.
01
03
05.06.2011
05.06.2013
2 of 6
5.1.2.5
Check the temperature and relative humidity of the area and record it in the
environmental control record. If it is within the specification as per the BPR, continue the
operation. If not, do not start the operation and inform the Production Executive / Officer
or Maintenance Executive / Officer.
5.1.3
5.1.3.1
5.1.3.2
5.1.3.3
5.1.3.4
5.1.3.5
bring them in the strip packing room from the tablet store.
Check the temperature and relative humidity of the area and record it in the
environmental control record. If it is within the specification as per the BPR, continue the
operation. If not, do not start the operation and inform the Production Executive / Officer
or Maintenance Executive / Officer.
5.2
5.2.1
Start up
Check that the machine is set with the specified change parts for the strip packing
5.2.2
5.2.3
5.2.4
its alignment.
Check that the printing unit is ready along with stereos of that particular batch details.
Take out the print of the stereos on the foil and check it against the batch details as per
BPR. Get it signed from Production Chemist / Officer and IPQA Chemist / Officer and
attach it in the BPR.
Particulars
Sign.
Date
Name
Prepared By
Checked By
Approved By
Authorized By
Indchemie
Thana, Baddi
Issue No.
Revision No.
Effective Date
Review Before
Page No.
01
03
05.06.2011
05.06.2013
3 of 6
5.2.5
Check the temperature and relative humidity of the area and record it in the
environmental control record. If it is within the specification as per the BPR, continue the
operation. If not, do not start the operation and inform the Production Executive / Officer
5.2.6
5.2.7
5.3
5.3.1
5.3.2
5.3.3
5.3.4
5.3.5
5.3.6
5.3.7
Operation
Fix the channel on the strip packing machine.
Load the tablets into hopper of strip packing machine.
Check that the rollers have attained the desired temperature on digital display.
Switch 'ON' the machine and start feeding the tablets through channel.
Check the packing and printing of strips from the machine.
Check the Leak Test at regular intervals.
Continue strip packing operation till the end of the shift / completion of the batch.
5.4
5.4.1
5.4.2
5.4.3
Shutdown
Switch 'OFF' the machine.
Switch 'OFF' the main electric supply.
Take out the tablets left in the hopper, bowl and channel and keep them in HDPE
containers.
5.5
5.5.1
Cleaning Procedure
Cleaning at the end of the shift / batch changeover of same product / strength,
5.5.1.1
5.5.1.2
5.5.1.3
5.5.1.4
5.5.1.5
5.5.1.6
5.5.1.7
5.5.1.8
Particulars
Sign.
Date
Name
Prepared By
Checked By
Approved By
Authorized By
Indchemie
Thana, Baddi
Issue No.
Revision No.
Effective Date
Review Before
Page No.
01
03
05.06.2011
05.06.2013
4 of 6
5.5.1.9
5.5.1.10
5.5.1.11
Clean the rest of the equipment body using duster / vacuum cleaner.
Clean and mop the floor.
Put "STATUS LABEL" on the equipment and record the cleaning details in Equipment
Log Book.
5.5.2
5.5.2.1
5.5.2.2
5.5.2.3
5.5.2.4
5.5.2.5
5.5.2.6
5.5.2.7
5.5.2.8
5.5.2.9
5.5.2.10
5.5.2.11
5.5.2.12
5.5.2.13
5.6
5.6.1
5.6.2
5.6.3
Precaution
Ensure that no tablets remain in between sealing rollers during the regular breaks.
Remove the channel assembly during the breaks.
Do not start the operation till the specified temperature and relative humidity specified in
5.6.4
6.0
REFERENCE (S)
In house
Particulars
Sign.
Date
Name
Prepared By
Checked By
Approved By
Authorized By
Indchemie
Thana, Baddi
Issue No.
Revision No.
Effective Date
Review Before
Page No.
01
03
05.06.2011
05.06.2013
5 of 6
ANNEXURE (S)
7.0
Nil
ABBREVIATION (S)
8.0
SOP :
No.
Number
BPR :
IPQA :
Date
Revision
No.
Issue
No.
01
25.05.2007
00
01
02
26.05.2009
01
01
Particulars
Sign.
Date
Name
Prepared By
Details of revision
- Footer of SOP is revised
As per SOP No. IB/QA/05/001.
- Scheduled Revision
Checked By
Approved By
Authorized By
Indchemie
Thana, Baddi
Issue No.
Revision No.
Effective Date
Review Before
Page No.
01
03
05.06.2011
05.06.2013
6 of 6
03
25.05.2011
Particulars
Sign.
Date
Name
02
Prepared By
01
- Scheduled Revision
Checked By
Approved By
- Need Based
Authorized By