The document outlines various American Society of Mechanical Engineers (ASME) codes for pressure vessels, boilers, and related equipment. It specifies that ASME B16.5 and B16.47 standards apply to pipe flanges and nozzles of different sizes. It also lists several sections of the ASME Boiler and Pressure Vessel Code that provide requirements for materials, design, fabrication, inspection, and other issues for various types of pressure equipment.

Uploaded by

NAVEEN
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
59 views

", " Above Nps 24 To 60 Asme B 16.47

The document outlines various American Society of Mechanical Engineers (ASME) codes for pressure vessels, boilers, and related equipment. It specifies that ASME B16.5 and B16.47 standards apply to pipe flanges and nozzles of different sizes. It also lists several sections of the ASME Boiler and Pressure Vessel Code that provide requirements for materials, design, fabrication, inspection, and other issues for various types of pressure equipment.

Uploaded by

NAVEEN
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 6

NOZZLE, FLANGES FROM NPS 1.5 TO 24= ASME B16.

ABOVE NPS 24 TO 60= ASME B 16.47

BOILERS= ASME SECTION I


MATERIALS (BOILERS)= ASME SECTION II
BOILERS & PRESSSURE VESSEL (LOW PRESSURE)= ASME SECTION VIII DIV.1

Subsection A - General Requirements

Part UG - General Requirements for All Methods of Construction and All Materials

Materials: UG-4 through to UG-15

Design: UG-16 through to UG-35

Openings and Reinforcements: UG-36 through to UG-46

Braced and Stayed Surfaces: UG-47 through to UG-50

Fabrication: UG-75 through to UG-85

Inspection and Tests: UG-90 through to UG-103

Marking and Reports: UG-115 through to UG-120

Overpressure Protection: UG125 through to UG-140

Subsection B - Requirements Pertaining to Methods of Fabrication of Pressure


Vessels

Part UW - Requirements for Pressure Vessels Fabricated by Welding

General: UW-1 through to UW-3

Materials: UW-5

Design: UW-8 through to UW-21

Fabrication: UW-26 through to UW-42

Inspection and Tests: UW-46 through to UW-54

Marking and Reports: UW-60

Pressure Relief Devices: UW-65

Part UF - Requirements for Pressure Vessels Fabricated by Forging

General: UF-1

Materials: UF-5 through to UF-7

Design: UF-12 through to UF-25

Fabrication: UF-26 through to UF-43

Inspection and Tests: UF-45 through to UF-55

Marking and Reports: UF-115

Pressure Relief Devices: UF-125

Part UB - Requirements for Pressure Vessels Fabricated by Brazing

General: UB-1 through to UB-3

Materials: UB-5 through to UB-7

Design: UB-9 through to UB-22

Fabrication: UB-30 through to UB-37

Inspection and Tests: UB-40 through to UB-50

Marking and Reports: UB-55

Pressure Relief Devices: UB-60

Subsection C - Requirements Pertaining to Classes of Materials

Part UCS - Requirements for Pressure Vessels Constructed of Carbon and Low Alloy
Steels

General: UCS-1

Materials: UCS-5 through to UCS-12

Design: UCS-16 through to UCS-57

Low Temperature Operation: UCS-65 through to UCS-68

Fabrication: UCS-75 through to UCS-85

Inspection and Tests: UCS-90

Marking and Reports: UCS-115

Pressure Relief Devices: UCS-125

Nonmandatory Appendix CS: UCS-150 through to UCS-160

Part UNF - Requirements for Pressure Vessels Constructed of Nonferrous Materials

General: UNF-1 through to UNF-4

Materials: UNF-5 through to UNF-15

Design: UNF-16 through to UNF-65

Fabrication: UNF-75 through to UNF-79

Inspection and Tests: UNF-90 through to UNF-95

Marking and Reports: UNF-115

Pressure Relief Devices: UNF-125

Appendix NF: Characteristics of the Nonferrous Materials (Informative and


Nonmandatory)

Part UHA Requirements for Pressure Vessels Constructed of High Alloy Steel

General: UHA-1 through to UHA-8

Materials: UHA-11 through to UHA-13

Design: UHA-20 through to UHA-34

Fabrication: UHA-40 through to UHA-44

Inspection and Tests: UHA-50 through to UHA-52

Marking and Reports: UHA-60

Pressure Relief Devices: UHA-65

Appendix HA: Suggestions on the Selection and Treatment of Austenitic Chromium


Nickel and Ferritic and Martensitic High Chromium Steels (Informative and
Nonmandatory)

Part UCI - Requirements for Pressure Vessels Constructed of Cast Iron

General: UCI-1 through to UCI-3

Materials: UCI-5 through to UCI-12

Design: UCI-16 through to UCI-37

Fabrication: UCI-75 through to UCI-78

Inspection and Tests: UCI-90 through to UCI-101

Marking and Reports: UCI-115

Pressure Relief Devices: UCI-125

Part UCL - Requirements for Welded Pressure Vessels Constructed of Material With
Corrosion Resistant Integral Cladding, Weld Metal Overlay Cladding, or With Applied Linings

General: UCL-1 through to UCL-3

Materials: UCL-10 through to UCL-12

Design: UCL-20 through to UCL-27

Fabrication: UCL-30 through to UCL-46

Inspection and Tests: UCL-50 through to UCL-52

Marking and Reports: UCL-55

Pressure Relief Devices: UCL-60

Part UCD - Requirements for Pressure Vessels Constructed of Cast Ductile Iron

General: UCD-1 through to UCD-3

Materials: UCD-5 through to UCD-12

Design: UCD-16 through to UCD-37

Fabrication: UCD-75 through to UCD-78

Inspection and Tests: UCD-90 through to UCD-101

Marking and Reports: UCD-115

Pressure Relief Devices: UCD-125

Part UHT Requirements for Pressure Vessels Constructed of Ferritic Steels With Tensile
Properties Enhanced by Heat Treatment.

General: UHT-1

Materials: UHT-5 through to UHT-6

Design: UHT-16 through to UHT-57

Fabrication: UHT-75 through to UHT-86

Inspection and Tests: UHT-90

Marking and Reports: UHT-115

Pressure Relief Devices: UHT-125

Part ULW Requirements for Pressure Vessels Fabricated by Layered Construction

Introduction: ULW-1 through to ULW-2

Materials: ULW-5

Design: ULW-16 through to ULW-26

Welding: ULW-31 through to ULW-33

Nondestructive Examination of Welded Joints: ULW-50 through to ULW-57

Fabrication: ULW-75 through to ULW-78

Inspection and Tests: ULW-90

Marking and Reports: ULW-115

Pressure Relief Devices: ULW-125

Part ULT Alternative Rules for Pressure Vessels Constructed of Materials Having Higher
Allowable Stresses at Low Temperature

General: ULT-1 through to ULT-5

Design: ULT-16 through to ULT-57

Fabrication: ULT-76 through to ULT-86

Inspection and Tests: ULT-90 through to ULT-100

Marking and Reports: ULT-115

Pressure Relief Devices: ULT-125

Part UHX - Rules for Shell-and-Tube Heat Exchangers


Part UIG - Requirements for Pressure Vessels Constructed of Impregnated Graphite

General: UIG-1 through to UIG-3

Materials: UIG-5 through to UIG-8

Design: UIG-22 through to UIG-60

Fabrication: UIG-75 through to UIG-84

Inspection and Tests: UIG-90 through to UIG-112

Marking and Reports: UIG-115 through to UIG-121

Pressure Relief Devices: UIG-125

MANDATORY APPENDICES: 1 through to 44

NONMANDATORY APPENDICES: A through to NN

BOILERS & PRESSSURE VESSEL (HIGH PRESSURE)= ASME SECTION VIII DIV.2
STORAGE TANKS= API
MIN. SPOOL LENGTH= 75mm
NPS VALUE ABOVE 12 IS EQUAL TO ITS OUTER DIA
ALL OPEN TOP TANKS REQUIRE TOP WIND GRIDER REGARDLESS OF ITS
HEIGHT & THICKNESS