Services Manual Telescope Control Box
Services Manual Telescope Control Box
Rheinmetall Elektronik
DS350 MODULAR
BOOM CONTROL EXTENSION
FOR
GROVE CRANE TMS/TTS 870
TROUBLESHOOTING MANUAL
190061_B.doc
NOTICE
190061_B.doc
TABLE OF CONTENTS
GENERAL INFORMATION
REFERENCE MATERIAL
SERVICE AND MAINTENANCE
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
1
2
3
4
5
6
16
26
31
33
39
40
41
42
43
44
45
46
47
48
49
50
51
53
54
190061_B.doc
GENERAL INFORMATION
This troubleshooting manual is designed to assist a service or maintenance person in
identifying LMI (Load Moment Indicator) problem areas or malfunctions. A digital
voltmeter with the capability to also measure current will be required. Regular
maintenance and service tools will also be required.
NOTE: Knowledge of how to use a voltmeter to measure both voltage and current is
assumed.
For system operation refer to the Operators Manual for the console. This may differ from
crane manufacturer and model.
Section 2 provides the drawings and reference material that will be used in the
troubleshooting flowcharts of this manual. Use the reference drawings in conjunction
with the flowcharts to help understand the operation of the system.
The PAT LMI DS 350 Modular with Boom Control Extension has been designed to provide
the crane with the essential information required to operate the machine within the
designed parameters.
Using different sensing devices, the DS 350 LMI monitors various crane functions and
provides the operator with a continuous display of the cranes capacity. The display
continually changes as the crane moves through the motions needed to make a lift.
The DS 350 Modular LMI provides the operator with information regarding the boom
length and boom angle of the main boom, working radius rated load and the total
calculated weight being lifted by the crane.
If non-permitted conditions are approached, the DS 350 LMI will warn the operator
by sounding an audible alarm and lighting a warning light. In addition the LMI
system has the capability to provide a signal to the solenoids and thereby locking
out those functions that may aggravate the cranes condition.
190061_B.doc
WARNINGS
The DS 350 load moment indicator (LMI) with boom control extension is an operational
aid that warns the crane operator when approaching an overload condition, a two block
condition and an out of boom sequence condition.
Prior to operating the crane, the operator must carefully and thoroughly read and
understand the information provided by the crane and load moment indicator
manufacturer.
The responsibility for safe crane operation shall remain with the crane operator who shall
ensure that all warnings and instructions supplied are fully understood and observed.
It still remains the operators responsibility to verify the operation and to select the correct
mode during crane operations.
The DS 350 Modular with boom control extension is not, and shall not, be a substitute for
good operator judgment, experience and use of accepted safe crane operating procedure
Proper functioning depends upon proper daily inspection and observance of the operating
instructions provided with the crane and load moment indicator.
The manual mode is a rigging mode. Lifting loads in manual mode is prohibited.
Should an out of sequence condition occur, the crane operator is responsible to select
manual mode to return the sections into sequence before continuing the lift.
REFERENCE MATERIAL
Document
Parts & Installation Manual
Operators Manual
190061_B.doc
190061_B.doc
P1
P2
A1
Analog input
L1
LMI Console
Analog
input
Analog
output
Digital
output
AI
1
AI
2
AO1
K5
K4
K3
K2
K5
NO
K5
NC
K4
DI 7
DI 6
DI 5
DI 4
Prop.
Prop. retract
Prop.extend
OM/Fly retracted
Automode on
Boom retract
Crane
interface
connector
RxD
TxD
Boom
Control Bus
Extension
Digital
Input
DI 3
DI 2
DI 3
Boom extend
Crane interface
connector
DS 350 Modular
Central Unit
Digital Inputs
DI 1
DI 2
Angle sensor
Prox.switch on IM section
Prox.switch on base section
Prox.switch on CM section
Cable reel
190061_B.doc
2. GETTING STARTED
This section explains how to handle a problem that may arise with the PAT DS 350
Modular LMI boom control extension. The procedures are given in flowchart format for the
following sections. Start with the general flowchart below that will guide you to one of
the detailed flowcharts shown in Sections 1.1 to 1.7. The drawings that are referenced in
these sections can be found in Section 2.1 to 2.13.
Start
Boom length %
problem
E83
Outer mid/ fly section is
not fully retracted or
center mid section is
not fully extended.
E61
Error in the boom
control extension
190061_B.doc
Wrong?
No
Yes
IM and/ or CM retract signal not recognized. Check
proximity switch target adjustment. Refer to
section 2, drawing 2.1. If damage is visible install
new switch.
Correct?
No
Yes
Measure the voltage supply to IM switch at terminal
1(+24V) and 3 (GND) in the length transducer
LG 321 . Refer to section 2, drawing 2.3 and 2.8 to
2.12
Continue on next
page
190061_B.doc
Continuation
No
Correct?
Measure the voltage at terminal
25(+24V) and terminal 27 (GND) in the
bus extension unit.
Yes
No
Correct?
Yes
Continue on next
page
190061_B.doc
Continuation
No
Correct?
Yes
Measure the voltage at terminal 1 (+24V) and 5
(GND) in the inner mid junction box.
Refer to section 2, drawing 2.2 and 2.12.
No
Correct?
Yes
Continue on next
page
190061_B.doc
Continuation
No
Correct?
Yes
No
Correct?
Yes
Continue on next
page
190061_B.doc
10
Continuation
Correct?
No
Yes
Measure the IM retract switch signal at wire 4 (+24V)
(fast-on connector) and 3 (GND) in the length
transducer LG321. Refer to section 2,
drawing 2.3 and 2.12.
Correct?
No
Yes
No
Correct?
Yes
Measure the CM retract switch Yes
signal at terminal 8
(+24V) and 3 (GND) in the length transducer LG321.
Refer to section 2, drawing 2.2, 2.3 and 2.12 .
Continue on next
page
190061_B.doc
11
Continuation
No
Correct?
Yes
Measure the IM retract switch signal at terminal 39
(+24V) and 27 (GND) in the bus extension. Refer to
section 2, drawing 2.7 and 2.9.
No
Correct?
Yes
Continue on next
page
190061_B.doc
12
Continuation
No
Correct?
Yes
Measure the CM retract switch signal at terminal 37
(+24V) and 27 (GND) in the bus extension. Refer to
section 2, drawing 2.7 and 2.9.
No
Correct?
Yes
Continue on next
page
190061_B.doc
13
Continuation
No
Correct?
Yes
No
Correct?
Yes
Continue on next
page
190061_B.doc
14
Continuation
No
Correct?
Yes
Measure signal at terminal X1/8 (+24V) and X1/7
(GND) in the LG 321(CM). Refer to section 2, drawing
2.2 and 2.12.
No
Correct?
Yes
Continue on next
page
190061_B.doc
15
Continuation
No
Correct?
Yes
End
190061_B.doc
16
Problem:
In Auto Mode the boom becomes out of
sequence, the warning light is on.
Correct?
No
Yes
No
Correct?
Yes
Remove the lid from the length (angle) transducer
LG 321 and LWG 309. Carefully reset the length
transducer potentiometer. Refer to section 2,
drawing 2.5 for instruction. Repeat testing the boom
sequence in automode.
Continue on next
page
190061_B.doc
17
Continuation
Failed?
No
Yes
In manual mode retract the boom. Disengage the boom stop block to
retract all section completely. Re-check the length potentiometer
adjustment. Refer to section 2, drawing 2.5.
End
No
Correct?
Yes
Continue on next
page
190061_B.doc
18
Continuation
No
Correct?
Yes
No
Correct?
Yes
Continue on next
page
190061_B.doc
19
Continuation
No
Correct?
Yes
No
Correct?
Yes
Continue on next
page
190061_B.doc
20
Continuation
Correct?
No
Yes
No
Correct?
Yes
Yes
Continue on next
page
190061_B.doc
21
Continuation
No
Correct?
Yes
No
Correct?
Yes
Continue on next
page
190061_B.doc
22
Continuation
Correct?
No
Yes
No
Correct?
Yes
Yes
Continue on next
page
190061_B.doc
23
Continuation
No
Correct?
Yes
No
Correct?
Yes
Continue on next
page
190061_B.doc
24
Continuation
No
Correct?
Yes
Switch power off.
Re- connect wire 2 to
terminal X1/2.
Defective length sensor
unit. Replace length sensor
unit. Refer to section 2,
drawing 2.4.
Reset all length transducer
potentiometers. Refer to section 2,
drawing 2.3, 2.4 and 2.5. Select the
boom control data display. Refer to
section 2, drawing 2.13. Compare the
indicated IM length with the actual IM
length.
No
Correct?
Yes
Switch power off. Re-connect wire 2
to terminal X1/2. Refer to section 2,
drawing 2.4.
190061_B.doc
25
Continuation
Yes
Correct?
No
End
End
190061_B.doc
26
E83
Outer mid and fly section are
not fully retracted.
E83 ?
No
Yes
No
E83 ?
Yes
Continue on next
page
190061_B.doc
27
Continuation
Correct ?
No
Yes
Correct?
No
Yes
No
Yes
Correct?
Continue on next
page
190061_B.doc
28
Continuation
Correct ?
No
Yes
Correct?
No
Yes
Continue on next
page
190061_B.doc
29
Continuation
No
Correct?
Yes
Measure signal at terminal X1/8 (+24V) and X1/7
(GND) in the LG 321(CM). Refer to section 2, drawing
2.2 and 2.12.
No
Correct?
Yes
Continue on next
page
190061_B.doc
30
Continuation
Correct?
No
Yes
Digital input defective on bus
extension. Check LED's on bus
extension. Contact authorized service
for the replacement procedure.
End
190061_B.doc
31
E61
Error in the bus extension
No
Correct ?
Yes
Correct?
No
Yes
Continue on next
page
190061_B.doc
32
Continuation
Correct ?
No
Yes
No
Correct?
Yes
End
190061_B.doc
33
Error:
No tele-function at all in
automode
No
Correct ?
Yes
No
Correct ?
Yes
Continue on next
page
190061_B.doc
34
Continuation
No
Correct ?
Yes
Start the engine.Operate the retract control. Measure the
retract signal at bus extension terminal X1/31 (+24V)
and X1/28 (GND). Refer to section 2, drawing 2.7 and
2.8.- 2.12.
No
Correct ?
Yes
continue on next
page
190061_B.doc
35
Continuation
Correct?
No
Yes
continue on next
page
190061_B.doc
36
Continuation
Correct ?
No
Yes
Select manual mode. Retract all sections. Switch power off. Remove
wire 2 from the analog output bord terminal A104 X1/2 (IM). Switch
power on. Operate retract or extend control. Measure the electrical
current (mA) between the wire 2 (removed from terminal) and the
terminal X1/2. The signal should increase from 0 mA to approximately
800 mA .
Note: In the ramping area the value may be < 800 mA.
Correct?
No
Yes
No
Correct?
Yes
Operate retract or extend
control.
Measure Voltage at terminal
A104 X1/2 (>0V) and X1/4.
continue on next
page
continue on next
page
190061_B.doc
37
Continuation
Continuation
No
Correct ?
Yes
No
Correct?
Yes
continue on next
page
190061_B.doc
38
Continuation
No
Correct ?
Yes
Correct?
No
Yes
END
190061_B.doc
39
190061_B.doc
40
190061_B.doc
41
190061_B.doc
42
Slipring-assembly
Length-potentiometer
Gearwheel
Terminal X1
To center mid
junction box
Drawing 2.3.2: LG 321- Center mid section
190061_B.doc
43
Angle sensor
Slipring assembly
Length potentiometer
Terminal X1
T o 7 p in c o n n e c to r - c o n n e c tin g
b o o m w ith s u p e rs tru c tu re
T o boom nose
ju n c tio n b o x
190061_B.doc
44
13.
190061_B.doc
45
Boom control
bus extension
Console
Central unit
Crane electric
interface connection
Crane electric
interface connection
190061_B.doc
46
Terminal X2
Analog output module
CPU - Module
Bus - extension
Terminal X1
190061_B.doc
47
To 8 pin crane
electric connector
To area def.
switch interface
To console
To piston side
pressure transducer
To 7 pin boom
base connector
190061_B.doc
48
To 23 pin crane
interface connector
To 14 pin boom
base connector
To 19 pin boom
base connector
To central unit
190061_B.doc
49
To bus extension
To central
unit
To central
unit
190061_B.doc
50
To length angle
transducer LWG 309
To central unit
To central unit
Connector for
optional lightbar
To central unit
Console
190061_B.doc
51
190061_B.doc
52
To bus extension
To central unit
To pairs of
two-way-valve
190061_B.doc
53
/ /
190061_B.doc
54
Relay
No.
Designation
2
6
7
Table A
out of sequence
IM ext/ret
CM ext/ret
OM ext/ret
Tele- Section
K2
0
0
1
1
IM two-way-valves
CM two-way-valves
OM two-way-valves
K6
0
1
0
1
K7
0
1
1
0
0 = no power output
1 = +24V output
Note: The two-way-valve must be powered to stop the section from moving and is
power-free when section is allowed to move.
190061_B.doc