Desired Process
Desired Process
FOCUS
FOCUS
FOCUS
AGC BIMForum
BIM as the Evolving Standard of Care
Driving process transformation for designers, contractors, and owners
E. Davis Chauviere, AIA, LEED AP
Principal and CIO
HKS, Inc.
October 8, 2009
Go
BIMtogether
and Integrated
like a horse
Project
andDelivery
carriage?
But all the kids are doing it!
What I need are facts, Watson!
Are you talking to me?
Be careful what you wish for
Effort/Effect
PD
CURT WP-1202
SD
DD
CD
PR
CA
OP
PD: Pre-design
SD: Schematic Design
DD: Design Development
CD: Construction Documentation
PR: Procurement
CA: Construction Administration
OP: Operation
Effort/Effect
PD
CURT WP-1202
SD
DD
CD
PR
CA
OP
PD: Pre-design
SD: Schematic Design
DD: Design Development
CD: Construction Documentation
PR: Procurement
CA: Construction Administration
OP: Operation
Effort/Effect
PD
CURT WP-1202
SD
DD
CD
PR
CA
OP
PD: Pre-design
SD: Schematic Design
DD: Design Development
CD: Construction Documentation
PR: Procurement
CA: Construction Administration
OP: Operation
Effort/Effect
PD
CURT WP-1202
SD
DD
CD
PR
CA
OP
PD: Pre-design
SD: Schematic Design
DD: Design Development
CD: Construction Documentation
PR: Procurement
CA: Construction Administration
OP: Operation
Effort/Effect
PD
CURT WP-1202
SD
SD
DD
DD
CD
CD
PR
CA
OP
PD: Pre-design
SD: Schematic Design
DD: Design Development
CD: Construction Documentation
PR: Procurement
CA: Construction Administration
OP: Operation
Effort/Effect
PD
CURT WP-1202
SD
DD
CD
PR
CA
OP
PD: Pre-design
SD: Schematic Design
DD: Design Development
CD: Construction Documentation
PR: Procurement
CA: Construction Administration
OP: Operation
Design is hard
Good design is really hard
Good designers make it look easy
it is not
Good design takes time
Inevitably good design involves
more design effort
Joel on Software
Joel Spolksy
Joel on Software
Joel Spolksy
Serious Play
Michael Schrage
Number of Iterations
1
Time
1
Iterate if necessary
(Probably)
Few Concepts
Select
Detail
ValueTest
Engineer
Build
Set-based
launch
Conventional
launch
Resources
Engineers not
available for
innovation
Time
1
Conventional design
Decisions
Crunch
Concept
RFIs
Compromise
Integration
Lawsuit
Design
Program
Schematic
Design
Design
Development
Construction
Documents
Building
Construction
Design
Program
Schematic
Design
Design
Development
Construction
Documents
Building
Construction
Old
New?
Old
New
Decisions
Crunch
Concept
Compromise
Concept
Integration
Decisions
Iterations
Construction
Documents
Design
Program
Design
Development
Schematic
Design
Building
Construction
Iterate if necessary
(Probably)
Few Concepts
Select
Detail
ValueTest
Engineer
Build
Many
Concepts each
Subsystem
Select and
and build
test
Select
Set-based
launch
Conventional
launch
Resources
Engineers not
available for
innovation
Time
1
2
Conventional design
Set-based design
Number of Iterations
Time
1
2
3
Concept
Integration
Decisions
Parallel
Iterations
Iterations
In a time of drastic
change it is the learners
who inherit the future.
Eric Hoffer