Nishat Dying and Finishing Unit#42: Presentation On Water Flow Process and Power House of NDF Unit#42
Nishat Dying and Finishing Unit#42: Presentation On Water Flow Process and Power House of NDF Unit#42
Prepared by:
ORICHEM
SAND FILTERS
Filling Media
Sand Filte r
Graded Sand
Iron Filter
Silica Sand
RO PLANT
Total RO Capacity
NO of ROs
4
RO#1
24m3
RO#2
15m3
RO#5
24m3
RO#6
60m3
Total RO Pool Capacity
123m3
Rejection:
Rejection:
Rejection:
Rejection:
900m3
8m3
5m3
8m3
20m3
DM PLANT
POWER HOUSE
WARTSILLA ENGINE:
Fuel: HFO (Furnace Oil), LFO (Diesel) and
Methane.
Total capacity: 9MW
Working Capacity: 8.6MW
HT: In 85C & Out 91C
LT: In 39C & Out 40C
Lube Oil Temperature: 58C
Exhaust Temperature: 430-440C
Engine Type: Low Speed Engine (750rpm)
Chemical Using: DG-4109
Residual Limit:
Wartsilla Boiler:
Total Capacity: 8Ton
Type: Fire tube Boiler/WHRB
Fuel: Waste gases of Wartsilla
Engine/ Methane Gas, HFO & LFO
Fuel Ratio: 4 Ton on Warsilla WHR
& 4 Ton on Gas Burner.
Purpose: Chillers,Dying, Finishing,
Printing
Chemicals Use: Adv-6445 and CS
Residual limit for Adv-6445:
Wartsilla Cooling
Tower:
System Volume:
Number of Circulating pump:
Flow rate of pumps:
Chemicals Use: 189C, DS747, BS-250 & Bs-3204
Residual limit for 189C:
Recommended COC :
Circulation Rate: 250m3/hr
Caterpillar Engines:
Regeneration of MBP:
There are 10 steps to regenerate the MBP.
1-Back wash: Bottom to Top to mixed resin for 2-3 min.
2-Settling-1: Settling time required 5min.
3-Chemical Injection: Hcl mixed with DM water enter trough bottom and
caustic
with Dm water inject through top and both are drain through the
center of the
vessel for 30-35min.
4-Slow Rinsing: Same as Chemical Dosing with DM water for 40-45min.
5-Rapid Rinsing: Same as slow rinsing but RO water is use.
6-Drain Down: For 10 min drain water through center.
7-Air Scoring: Airflow from bottom to top for 15min to mix.
8-Settling-2: For settling 5 min required.
9-Fast Rinsing: Inject RO water through top and drain from bottom for 2530min.
10-Final Rinsing: same as fast rinsing but in this step we check PH and
Conductivity. When conductivity become less than 0.3 than system