Pigging Procedure
Pigging Procedure
DOC NO:
PRODUCTION FACILITY
BANGKO CRESTAL 0-0-82A
Page 1 of 11
Rev : 1
PIGGING PROCEDURE
PRODUCTION FACILITY BANGKO CRESTAL 0-0-82A
SR NO. 1259772 01 04770 000
SLO N
MARCH 2015
DESCRIPTION
BP3
DATE
RW / CPI
PREPARED BY
CHECKED BY
APPROVED BY
WORK PROCEDURE
PRODUCTION FACILITY
BANGKO CRESTAL 0-0-82A
DOC NO:
Page 2 of 11
Rev : 0
WORK PROCEDURE
PRODUCTION FACILITY
BANGKO CRESTAL 0-0-82A
DOC NO:
Page 3 of 11
Rev : 1
1. SCOPE
This procedure cover minimum requirement for Pig cleaning test of new
pipe line. Pipe line pigging is done for the following reason:
-
2. P & ID REFERENCY
P & ID, Drawing or skecth shall be attached for Boundary cleaning
3. PURPOSE
This procedure shall be applied to pipe line as per approval drawing.
Pigging is performed to clean the pipeline for any foreign material left
during construction. The pig cleaning shall be done firstly prior to
hydrotest.
4. APPLICABLE CODE & SPECIFICATION
-
CPI SPECIFICATION
5. DEFENITIONS
PIG
function.
PIG TRAIN
specific task.
PIG TRAP
UTILITY PIG :
(batching,
cleaning).
INTELLIGENT PIG : A generic name given to a pig that utilizes power to
perform a specific task or log specific information.
6. TYPE OF PIGS
WORK PROCEDURE
PRODUCTION FACILITY
BANGKO CRESTAL 0-0-82A
DOC NO:
Foam Pig
Page 4 of 11
Rev : 0
Cleaning Pig
Gauging Pig
Batching Pig
Magnetic Pig
WORK PROCEDURE
PRODUCTION FACILITY
BANGKO CRESTAL 0-0-82A
DOC NO:
Page 5 of 11
Rev : 1
Cleaning
Like the process for displacement, the positive interface between the
pig and the pipe wall imparts a cleaning action on the pipe wall. This
can be further enhanced by the addition of brushes, scrapers, or even
more aggressive tools to the pig. For line where ferrous debris is
expected, magnet attached to the pigs can add a pick-up action for
removal of magnetic debris.
Gauging
In order to identify any major restriction in flow area through a line a
simple metal plate is attached to the pig to provide an internal line
gauge. Generally sized to 95% of the pipeline internal diameter ( 95%
nominal or 95% minimum, depend on specification being used), the
gauge plate tends to be made of a soft metal such as aluminum and is
chamfered on the leading edge. It is common to petal the gauge
plate with short, radial cuts to minimize the risk of the pig becoming
stuck. These radial cuts through the gauge plate allow the plate to
bend more easily if an obstruction is encountered.
WORK PROCEDURE
PRODUCTION FACILITY
BANGKO CRESTAL 0-0-82A
Page 6 of 11
DOC NO:
Rev : 0
Pre commissioning
When new pipeline are built, they generally need to be cleaned of
construction debris and prepared for hydrostatic testing. This is
generally done by utilizing a pig train consisting of cleaning, gauging
and batching pig to flood the line.
Depending on the medium to be transported in the line, further pigging
may be required for dewatering and drying operations.
Commissioning
As the product is introduced into the line, a batching pig or pigs can be
used to separate the product from the medium currently in the line.
Operational pigging
During the life of a line, operational pigging is a cheap effective way of
maintaining flow and minimizing back pressure. Pigs can be used to
mechanically clean waxes and other hydrocarbon builds ups, or
chemicals can be batched between pigs to provide chemically
enhanced cleaning. Inline inspection is generally carried out as part of
a routine maintenance plan.
Decommissioning
Whether pipelines reach the end of their useful life or have their used
change (e.g. changing a production line to produced water disposal
line), they generally require some form of cleaning. Again, mechanical
and
chemical
means
can
be
used
to
allow
subsea
11.PIGGING MEDIUMS
WORK PROCEDURE
PRODUCTION FACILITY
BANGKO CRESTAL 0-0-82A
DOC NO:
Page 7 of 11
Rev : 1
Liquid
The preferred medium for propelling pigs is an incompressible liquid.
Incompressible liquid provide maximum control over pig speed as well
as lubrication for the pig seals, minimizing wear and maximizing seal
effectiveness and life. Liquids such as water, crude oils or process
products and chemicals can be used as propelling mediums. Care
should be taken to ensure sealing element materials are compatible
with fluid medium and prevailing pressure and flow conditions.
Gas
As gasses are compressible, the amount of stored energy behind a pig
propelled with gas is far greater than of similar pig propelled with
liquid. Appropriate consideration should be given to safety implications
resulting from this stored energy. Pig movement can also be affected
by improper use of a compressible gas as a propulsion fluid. Failure to
deliver adequate quantities of gas required to maintain sufficient
pressure behind the pig can result in start-stop motion of the pig.
Multiphase Fluid.
When the pig propelling medium is multiphase, the same safety
consideration should be given to the pigging operation as if the
propelling medium were gas. Extra care should be given to the
consider the effect of slugging and the associated forces at the
receiving end.
WORK PROCEDURE
PRODUCTION FACILITY
BANGKO CRESTAL 0-0-82A
DOC NO:
Page 8 of 11
Rev : 0
To conduct cleaning pig on this project BP3 CS-WUR-C NG, the preparation
tools, equipment and type of pig can be shown below :
-
b.
-2 hoses
c.
Air Compressor
d.
Pressure Gauge
The pressure gauge will be installed on the line to indicated the line
Pressure after the valve is closed whenever possible located the
pressure gauge at a low point in the pipe line where pressures are
naturally higher.
e.
14.APPLICATION
To further clean the pipe line from foreign material and check the general
integrity of pipe line, the pigging test will be conducted step by describe
as follow:
-
Ensure all supporting document to start the work has been approved
by client, such as SOP, JSI/JSA, GPTW, ITP and Work Procedure.
Ensure all personnel incharge for the work has attended and passed
safety training class such as HES Induction, FSWP, etc
Run the air compressor and gradually increase the pressure to round
30 psig for keep the poly pig moving. Monitor the receiver at site and
watch for the coming pig.
When the Pig arrived, inspector shall immediately contact base to stop
the air compressor.
WORK PROCEDURE
PRODUCTION FACILITY
BANGKO CRESTAL 0-0-82A
DOC NO:
Rev : 1
Page 9 of 11
Acceptance criteria of the pig cleaning is the pipe line free from pieces
of metal, wooden, welding electrode and other construction debris and
the physical condition of pig coming out shall be 80% compare to the
original pig.
15.SAFETY PRECAUTIONS
As is any system where pressure is employed adequate safety precaution
should be excised the following safety precautions should be considered.
-
Pressurizing
equipment
should
be
operated
be
qualified
and
The test operation should be well planned and carried out with all due
precaution. It is always best for one man to be take their direction from
him.
WORK PROCEDURE
PRODUCTION FACILITY
BANGKO CRESTAL 0-0-82A
DOC NO:
Page 10 of 11
Rev : 0
The stuck pig can happen if the pig has encountered obstruction that it
cannot negotiate. This will include excessive debris build-up in front of the
pig, partially closed valves and various obstructions such as lunch boxes,
tools, etc. For removing this type, the following options may prove helpful:
-
Remove pressure and volume (allowing the pig to recover). As with the
lost seal type, this procedure is useful for the same reason, allowing
the pig to recover its shape after encountering an obstruction.
If the pig was not coming out thru the line the following check list may
of some help in locating the problem.
17.INSPECTION
-
Whether pig is to be used again or not, the pig should be inspected for
satisfactory pig performance.
18.ACCEPTANCE CRITERIA
The criteria of acceptance for inspection are the pig is coming out
minimum 80% compare to original at receiver point. If there is any foreign
WORK PROCEDURE
DOC NO:
PRODUCTION FACILITY
BANGKO CRESTAL 0-0-82A
Page 11 of 11
Rev : 1
materials in side of pipeline, it will not passed out the line and the
inspector must monitor along the line and to find out where the position is
and if required the line shall be cut of to get the pig and or brush out. A retest shall be done after repair the line.