82% found this document useful (17 votes)
13K views1 page

Fidic Timeline (Final)

This document outlines the timeline and processes for a construction project based on FIDIC General Conditions. It shows the key deliverables and durations for activities in the pre-construction, execution, and operation & maintenance phases. These include signing the contract agreement, submitting payment requests, potential delays or disputes, contract termination processes, project closeout, and the defect liability period. The timeline spans from receiving the letter of acceptance to the maximum two-year defect liability period after completion.

Uploaded by

Asif Hameed
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
82% found this document useful (17 votes)
13K views1 page

Fidic Timeline (Final)

This document outlines the timeline and processes for a construction project based on FIDIC General Conditions. It shows the key deliverables and durations for activities in the pre-construction, execution, and operation & maintenance phases. These include signing the contract agreement, submitting payment requests, potential delays or disputes, contract termination processes, project closeout, and the defect liability period. The timeline spans from receiving the letter of acceptance to the maximum two-year defect liability period after completion.

Uploaded by

Asif Hameed
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Submission of Proposed

Breakdown of Lump sum


Amount (28 Days)
(14.1)

Sign of Contract
Agreement (28 Days)
(8.1)

First Estimate of Payment


Submission (42 Days)
(14.4)
No Receiving of IPC
Reply
(42 Days)
(16.1)

Commencement of
Works (28 Days)
(8.1)
Submission of
Performance
Security (28 Days)
(8.1)

Agreement on
Insurances
(8.1)

Issuance of IPC by
Engineer
(28 Days)
(14.6)

IPC Request
(14.6)
(28 Days)
(1.1.3.1)
Base
Date of
Date
Submission
of Tender

Receiving of
Letter of
Acceptance
(LOA) by
Contractor
(4.2)

Delay in IPC by
Employer
(21 Days)
(16.1)
Request to show
Employer Financials
(28 Days)
(2.4)

Notification to
Employer for Claim
(28 Days)
(20.1)

Submission of Full
Detail Claim by
Contractor
(42 Days)
(20.1)
Notice of
Commencement
(7 Days)
(8.1)

Termination by the
Employer
(28 Days)
(15.5)
After Late Dates:
Contractor
Receives Notice
Employer Return
Performance
Security

Programme
Submission
(28 Days)
(8.3)

PRE-CONSTRUCTION
PHASE

Engineer
Replacement
(42 Days)
(3.4)

Engineers Reply
(21 Days)
(4.2)

Contractor
Termination of
Contract
(21 Days)
(16.1)
Suspension of
Work
(21 Days)
(16.1)
Testing
(24 hrs to engr.)
(7.4)

Force Majeure
Awareness
Notification
(14 Days)
(19.2)
Termination
Notice (Force
Majeure)
(84/140 Days)
(19.6)
Submission of
Statement at
Completion
(84 Days)
(11.3)
Suspension of
Work
(84 Days)
(8.11)

Taking Over
Certificate
(10.1)

Decision by DAB
after Receiving
Reference
(84 Days)
(20.4)

Floating Deliverables

Contractor
request to
Proceed.
Engineers
Reply Termination by
(28 Days) Contractor
(8.11)
(8.11)

Final Statement
(56 Days)
(14.11)

Issuance of T.O or
Rejection
(28 Days)
(10.1)

Issuance of Final
Payment Certificate
(28 Days)
(14.13)

Defect Remedial
(Further Tests)
(28 Days)
(11.6)

Notice to other
Party if Dissatisfied
(28 Days)
(20.4)
Arbitration
Initiation
(56 Days)
(20.5)

EXECUTION PHASE

Decided Deliverables

Payment of
Remaining Half of
Retention Money
(14 Days)
Release of (14.9)
Performance
Certificate
(10.1)

Notice by the
Contractor
(14 Days)
(10.1)
Claim after
notification
(28 Days)
(17.5)

FIDIC General Conditions


Timeline

Payment of First
Half of Retention
Money
(14 Days)
(14.9)

Maximum Defect
Liability Period
(02 Years)
(11.3)

OPERATION &
MAINTENANCE PHASE