Defect Sheeet
Defect Sheeet
GF/LVR/SNG/1
Level
Location
Living Room
Element/
Ceiling
Component
BARIS
Condition
Priority
Matrix
16
Color
Diagnosis
Prognosis
their frame.
Replace the ceiling with new one and paint the
new ceiling.
Level
Location
Living Room
Element/
Ceiling
Component
BARIS
Condition
Priority
Matrix
Color
Diagnosis
Prognosis
visible gap.
It will show an adverse effect on the ceiling.
Level
Location
Living Room
Element/
Wall
Component
BARIS
Condition
Priority
Matrix
Color
Diagnosis
Prognosis
Level
Location
Living Room
Element/
Door Leaf
Component
BARIS
Condition
Priority
Matrix
Color
Diagnosis
weather.
Hot and rainy weather caused it to crack.
Prognosis
plucked.
Easy to break if have a violation.
Level
Location
Living Room
Element/
Door Grill
Component
BARIS
Condition
Priority
Matrix
Color
Diagnosis
Prognosis
Brush with sandpaper and apply paint anticorrosion to protect steel from future corrosion
problem againt.
Level
Location
Kitchen
Element/
Wall
Component
BARIS
Condition
Priority
Matrix
Color
Diagnosis
Prognosis
exhaust fan.
Remove old paint that effected, sanding and
scraping the surface until smooth.
Start repainting with undercoat, the premier and
the finishing paint.
Level
Location
Kitchen
Element/
Door Frame
Component
BARIS
Condition
Priority
Matrix
Color
Diagnosis
wall
Possible cause by the improper installation and
swinging force of the door leaf.
Prognosis
The crack will more deep and have gaps, so wall
anymore.
Remedies Work/ Action
cracking line.
After the mortar and plastering work dry, paint
the area.
Level
Location
Kitchen
Element/
Floor tiles
Component
BARIS
Condition
Priority
Matrix
Color
Diagnosis
Prognosis
Level
Location
Bathroom 1
Element/
Floor tiles
Component
BARIS
Condition
Priority
Matrix
15
Color
Diagnosis
load carried.
Allow water penetration true floor slab.
Prognosis
occupant.
Allow water to enter the floor slab easily.
Other floor tiles may also affected when this
damage is not fixed.
Remedies Work/ Action
Level
Location
Bathroom 1
Element/
Wall
Component
BARIS
Condition
Priority
Matrix
Color
Diagnosis
off.
The dampness is caused by water splash and
shower tub that fix to the wall.
Prognosis
smooth surface.
Repainting the wall start with premier coating
and the finished painting, then let it fully dry.
Level
Location
Bath Room 1
Element/
Door
Component
BARIS
Condition
Priority
Matrix
Color
Diagnosis
gaps.
A possible cause is by water splash that enter
the jointing.
Cause door frame rust
Prognosis
become large
Allow water to easily penetrate true walls.
Cause corrosion to door frame.
Level
Location
Bath Room 2
Element/
Tiles Wall
Component
BARIS
Condition
Priority
Matrix
Color
Diagnosis
in the wall.
Rising pipe in the wall is vibrate and force the
Prognosis
Level
Location
Bathroom 2
Element/
Component
BARIS
Condition
Priority
Matrix
Color
Diagnosis
of
the
metal
appliance
in
the
bathroom.
The ability of tile may decrease and broke the
tiles.
Prognosis
anti-rust laxative.
Do this for all tiles to make as a preventive
action to avoid any corrosion happens again.
Level
Location
Bath Room 2
Element/
Ceiling
Component
BARIS
Condition
Priority
Matrix
Color
Diagnosis
Prognosis
Level
Location
Bath Room 2
Element/
Door Frame
Component
BARIS
Condition
Priority
Matrix
Color
Diagnosis
gaps
It is caused by the door frame is bent.
This happened because of the mortar between
wall and door frame already dated.
Prognosis
Level
Location
Bath Room 2
Element/
Door frame
Component
BARIS
Condition
Priority
Matrix
Color
Diagnosis
frame.
That my cause door frame to rust and damage.
Prognosis
Level
Location
Store Room
Element/
Wall
Component
BARIS
Condition
Priority
Matrix
12
Color
Diagnosis
Prognosis
liquid.
For blistering, scrape the paint and use
sandpaper to produce smooth surface. Then
repaint the wall start with an undercoat to last
finish.
Level
Location
Store Room
Element/
Ceiling
Component
BARIS
Condition
Priority
Matrix
Color
Diagnosis
and wall.
The defect is caused by
Prognosis
Level
Location
Store Room
Element/
Wall
Component
BARIS
Condition
Priority
Matrix
Color
Diagnosis
Prognosis
wall.
The colors on the walls will become faded and
unsightly.
Level
Location
Room 1
Element/
Wall
Component
BARIS
Condition
Priority
Matrix
Color
Diagnosis
Prognosis
compound.
Mix up the compound and smooth it on the wall
When the compound dry, repaint the area to
give a new look.
Level
Location
Room 1
Element/
Wall
Component
BARIS
Condition
Priority
Matrix
Color
Diagnosis
The
paint
is
peeling,
faded
caused
by
dampness.
The dampness happens because this wall is
near a bathroom.
Prognosis
enlargement.
Dampness from bathroom can cause the wall
fail and lastly collapse.
Remedies Work/ Action
first.
Clean up the dampness and faded area of the
wall.
Re-coat and repainting the wall with undercoat
and topcoat.
Level
Location
Room 1
Element/
Door
Component
BARIS
Condition
Priority
Matrix
Color
Diagnosis
Prognosis
Level
Location
Room 1
Element/
Ceiling
Component
BARIS
Condition
Priority
Matrix
12
Color
Diagnosis
Prognosis
Level
Location
Room 1
Element/
Wall
Component
BARIS
Condition
Priority
Matrix
Color
Diagnosis
Prognosis
and worst.
Give a terrible look for the room.
Level
Location
Internal area
Element/
Wall
Component
BARIS
Condition
Priority
Matrix
Color
Diagnosis
the paint.
Fungi problem because of the dampness by
water penetration through the wall.
Prognosis
Level
Location
Internal area
Element/
Wall
Component
BARIS
Condition
Priority
Matrix
Color
Diagnosis
Prognosis
Level
Location
Internal wall
Element/
Ceiling
Component
BARIS
Condition
Priority
Matrix
12
Color
Diagnosis
Prognosis
anytime.
Dangerous and can caused injured to the
occupant.
Level
Location
Element/
Porch slab
Component
BARIS
Condition
Priority
Matrix
Color
Diagnosis
Made by common cement rendering as finishes, so
there are small hairline crack on the porch slab.
Possible cause:
Vehicle loading
Slab settling
Incorrect rendering mix.
Prognosis
Level
Location
Element/
Component
BARIS
Condition
Priority
Matrix
20
Color
Diagnosis
Prognosis
penetration
The column may fail.
deep
Level
Location
Front
Element/
Ceiling Board
Component
BARIS
Condition
Priority
Matrix
Color
Diagnosis
Prognosis
on the occupant.
The dampness will become worse and affect
timber frame
Replace and install new ceiling board in the
damaged area.
Level
Location
Front
Element/
U- Shape Drainage
Component
BARIS
Condition
Priority
Matrix
Color
6
Diagnosis
Prognosis
Remedies Work
area
Use mortar to cover up the crack and make
sure it totally dry.
Level
Location
Front
Element/
Component
BARIS
Condition
Priority
Matrix
Color
12
Diagnosis
Prognosis
The door grill may not function.
Give terrible look as it located in front of house
Some part of rust metal is sharp and can
injured occupant.
Level
Location
Right
Element/
External wall
Component
BARIS
Condition
Priority
Matrix
Color
Diagnosis
Crack at the corner and bottom of external wall
The crack is caused by jointing between this
Prognosis
of the wall
Water can enter true this crack lips and effect
internal wall
Dangerous to the occupant
Level
Location
Right
Element/
External Wall
Component
BARIS
Condition
Priority
Matrix
16
Color
Diagnosis
Prognosis
The crack will become more worst and deep
The wall may fail and collapsed on the
occupant.
let it dry.
Repaint the crack area with external types of
paint that whether resistance.
Level
Location
Right
Element/
External Wall
Component
BARIS
Condition
Priority
Matrix
1
Diagnosis
Color
flower
pot
also
Prognosis
other area.
The dampness is very slippery and can cause
jetting.
Treat infected areas with fungicidal wash.
Re-smooth the apron with more algae resistant
compound.
Level
Location
Right
Element/
Apron
Component
BARIS
Condition
Priority
Matrix
4
Diagnosis
Color
wall.
Can caused the near wall and drain fail.
Dangerous and can caused injured to the
occupant.
Remedies Work/ Action
area
Make sure all crack is totally seal by the
compound
Render back the cracking and coating area to
smooth up the apron.
Level
Location
Right
Element/
Windows
Component
BARIS
Condition
Priority
Matrix
4
Diagnosis
Color
Prognosis
to other area.
Some part of rust metal is sharp and can
injured occupant.
Level
Location
Rear
Element/
Apron
Component
BARIS
Condition
Priority
Matrix
1
Diagnosis
Color
Prognosis
The dampness can become worst and plant
jetting.
Treat infected areas with fungicidal wash.
Level
Location
Kitchen
Element/
Door Grill
Component
BARIS
Condition
Priority
Matrix
9
Diagnosis
Color
(inclement weather).
Water splash from rain caused by short eaves
roof also one of the cause of this corrosion.
Prognosis
other area.
Rust metal is sharp and can injured occupant.
Level
Location
Living Room
Element/
Door Grill
Component
BARIS
Condition
Priority
Matrix
6
Diagnosis
Color
(inclement weather).
Water splash from rain caused by short eaves
roof also one of the cause of this corrosion.
Prognosis
other area.
Rust metal is sharp and can injured occupant.
GF/LVR/CNG/1
Defects
Dampness
Condition
Priority
Matrix
Assessmen
Assessment
Analysis
t (a)
(b)
(c)=(a x b)
16
Defect
Indication
Code
GF/LVR/CNG/2
GF/LVR/WL/3
GF/LVR/DR/4
GF/LVR/DRG/5
GF/LVR/DRG/6
GF/KT/WL/7
GF/KT/DR/8
GF/KT/FLR/9
GF/KT/DRG/10
GF/BT1/FLR/11
GF/BT1/WL/12
GF/BT1/DR/13
GF/BT2/WL/14
GF/BT2/WL/15
GF/BT2/CNG/16
GF/BT2/DR/17
GF/BT2/DR/18
GF/SR/WL/19
GF/SR/CNG/20
GF/SR/WL/21
GF/BD1/WL/22
GF/BD1/WL/23
GF/BD1/DR/24
GF/BD1/CNG/25
GF/BD1/WL/26
GF/IA/WL/27
GF/IA/WL/28
GF/IA/CNG/29
GF/EX/FLR/30
GF/EX/CL/31
GF/EX/CNG/32
GF/EX/DNG/33
GF/EX/DRG/34
GF/EX/WL/35
GF/EX/WL/36
GF/EX/APN/37
GF/EX/APN/38
GF/EX/WND/39
GF/EX/APN/40
Crack
Hairline Crack
Door Crack
Corrosion
Grill Corrosion
Blistering
Door Frame Crack
Rusting Floor Tile
Grill Corrosion
Broken Tiles
Dampness
Door Frame Crack
Broken Tiles
Rusting Appearance
Dampness
Door Frame Crack
Damage & Rust
Blistering & Damp
Crack
Stains
Hairline Crack
Peeling
Door Frame Peeling
Damaged Ceiling
Peeling
Dampness
Bittiness
Damaged Ceiling
Hairline Crack
Crack
Dampness
Penetration Crack
Corrosion
Crack
Crack
Dampness
Apron Crack
Grill Corrosion
Dampness
3
1
1
2
3
2
3
1
3
5
2
3
3
2
2
3
2
4
1
1
1
3
1
3
2
2
1
3
2
5
2
3
4
3
4
1
2
2
1
2
1
2
3
2
3
2
1
3
3
2
3
3
1
3
3
3
8
1
1
1
3
1
4
1
1
1
4
3
4
1
2
3
3
4
1
2
2
1
6
1
2
6
6
6
6
1
9
15
4
9
9
2
6
9
6
12
1
1
1
9
1
12
2
2
1
12
6
20
2
6
12
9
16
1
4
4
1
254
40
6
Fair
BARIS ASSESSMENT
PRIORITY ASSESSMENT
E4
U3
20
15
16
12
12
9
8
6
4
3
SCALE
Condition
Assessment
5
4
3
2
1
NO
MATRIX
SCORE
Plan maintenance
1 to 4
Condition monitoring
5 to 12
Serious attention
13 to 20
Building Rating
Score
Good
1 to 4
Fair
5 to 12
Dilapidated
13 to 20 good
CONDITION ASSESSMENT
Condition
Scale Value
Description (Value)
New/as new
Fair
Minor repair
Poor
Major
Repair/replacement
Very poor
Dilapidated
Minor servicing
Malfunction
Damage/missing
PRIORITY ASSESSMENT
Priority
Scale Value
Description
R2
10
8
6
4
2
N1
5
4
3
2
1
Normal
Routine
Urgent
Emergency
SYMBOL OF LEVEL:
LEVEL
DROUNG FLOOR
SYMBOL
GF
SYMBOL OF DEFECT:
SYMBOL
DEFECTS
Crack
CR
Dampness
DMP
Corrosion
COR
Blistering
BLS
Rusting
RUS
Broken/damaged
BR
Stains
ST
Peeling
PE
Bittines
BT
SYMBOL OF COMPONENT:
COMPONENT
SYMBOL
COMPONENT
SYMBOL
Manhole
MH
Ceiling
CNG
Column
CL
Wall
WL
Staircase
STR
Drainage
DNG
Apron
APN
Window
WND
Door
DR
Floor
FLR
Door grill
DRG
Roof
RF
SYMBOL OF LOCATION
LOCATION
SYMBOL
Living Room
LVR
Dining Room
DNR
Master Bedroom
MB
Bedroom 1
BD1
Bedroom 2
BD2
Bedroom 3
BD3
Bathroom1
BT1
Bathroom 2
BT 2
Car Porch
CP
Kitchen
KT
Store Room
SR
Internal Area
IA
External
EX