USER GUIDE - PM Module Page Wise Breakup 2.1
USER GUIDE - PM Module Page Wise Breakup 2.1
PM USER GUIDE
INDEX
V2.0
05/02/2015
Page No.
PM-1
PM-2
ERP
portal
ERP
Portal
2
3
PM-3.4 Case 4: Breakdown Maintenance by Vendor (Need Based Service and APO/ARC is available)
11
13
PM-8
PM-4
ERP
Portal
PM-5
ERP
Portal
PM-6
17
PM-7
21
PM-9
22
15
23
28
29
30
31
32
33-49
PM-18 Raising of PIS issues , request to create , change master data through MANTIS
ERP
Portal
FLOW CHART for End to End ERP Process "For Cable(UG/OFC) fault Maintenance, Computer Maintenance, General Maintenance etc."
For B2-
Maintenance Processs
( Breakdown fault /
general type mtce. )
T-code: IH01
CASE 1 - PM-3.1
* Provide - type of
Notification ( B2 for
break down and B3
for General Mtce. ),
Fault description ,
Priority , Partners
and other parameters
*Change of user status by Person Responsible ACKNOWLEDGE- ACKD and Put in Process - NOPR
----------------------------------------------------------------For B3- Put in process ( NOPR )
( T-code - IW22/IW28 )
Is
material/Service
is required ?
YES
Call Vendor by
Vendor docket
details in
notification
SET status
" VEND"
( If Applicable )
YES
NO
NO
IF
material
is
required
?
CASE 3 - PM-3.3
Is AMC /
WARRANTY IS
AVAILABLE ?
For B2:
*Change of user status by Person Responsible Completion- COMP and catalog data ( fault history )
filling, Malfunction End time.
* Initiator will confirm - CNFR and technically
complete the notification - NOCO
( T-code - IW22/IW28 )
For B3: Fill catalog data ( fault history ) , complete the
notification - NOCO
NO
YES
Confirmation
of
Maintenance
order -IW41 (
As applicable
)
Complete the
Notification after
Confirmation
CNFR/NOCO
Set various parameters
satisfactory/Not
satisfactory,
Malfunction End
time,Cataloge data etc.
Is ARC
( APO/Contract )
IS AVAILABLE ?
CASE 4 - PM-3.4
YES
already available
Contract by Service
Master record , MSS etc
by AC03/ML10/ME31K
NO
Is Material &
external Service
both required
( NEEDBASE
SERVICEE
REQUIREMENT )
NO
?
YES
Create
Maintenance
Order with PM03
control key and
reference
Available APO ,
Maintain
"Agreement " in
M.O. and many
more related
parameters.
PO will be created
w.r.t. PR , data will
populated from APO
,and issued to vendor(This PO is to be
After release of
Maintenance order
- PR is gererated
and is available in
SAP inbox of
person releasing
the M.O. This PR is
to be INITIATED &
APPROVED as per
MM Workflow.
INITIATED &
APPROVED as per
MM Workflow )
CASE5 - PM-3.5
NO
Is Only
material is
required
from Store ?
YES
CASE 2-PM-3.2
NO
Is Material &
external Service
both required (
Thru Temparary
Advance) ?
YES
CASE 6 - PM-3.6
YES
NO
Is Material
is available
in ANY
store
NO
YES
B
Please follow the Material
Procurement process ( MM )
( Create PR -- PO -- Goods
Receipt against PO into the
STORE ).
Cost Settlement of
Maintenance order by
T-Code : KO88 or KO8G
( This settlement can be
done before TECO status
of M.O.)
Post Down Payment,
and Call Vendor through
Vendor docket Details
make payment to Vendor as per
PO , and Bill raised Penalty
deduction will be issued to
vendor / Invoice verification
process MIRO/FB03
( as applicable )
Quotations/Tendering process
will follow.
Is Material
is available
in Your
OWN store
ME21N/ME22N/
ME29N
After release of
Maintenance order - PR is
gererated and is available in
SAP inbox of person
responsible . This PR is to be
INITIATED & APPROVED as
per MM Workflow.
Post Down
Payment, and
Call Vendor
through Vendor
docket Details
Business Completion
( CLOSURE of the
M.O.)
EXERCISE : PM-3.1
Create Notification
1
When we need the maintenance on Equipment or F/L we create notification , for capturing the
fault history / catalog data of the Equipment.
Creating the Breakdown Notification ( For detail refer 'Breakdown Manual" From page-8 )
Enter IH01 in Transaction window
Write down your Functional location(FL) eg 1021-2110..
Under Explosion, mark the check box upto BOM explosion & execute
Select the required Equipment or FL & select 'Goto' in Menu.
Select 'create Notification' and then general, thereafter press enter.
Select B2 in Notification Type and press enter
Enter fault description in Notification field
Enter Priority : select Major/ Critical / Minor
Enter details of fault in Description field
Enter Planner Group: e.g. -FID , if prompted by system.
Enter Funct:- ZI Initiator; Partner :- select by search ( or as per data maintained in equipment
master )
Enter Funct:- ZP Person resp; Partner :- select by search
Object Infm window pops up; click to continue
Select No for the message "Specify new dates?"
Press Save and notedown the Notification No.
Assigning the notification
Enter /niw22 in Transaction window ( or IW28 search )
Click on the pencil icon at the USER Status field( Just in front of System status field );
window pops up
Select ASGD radio button; click to continue
Acknowledement and Release
Enter /niw22 in Transaction window ( or IW28 search )
Press
Enter
Press
Enter
Save
Press
Enter
Save
Press
Enter
Press
Enter
Press
Enter
Press
Enter
Save
Page 3 of 49
continue
Press
Enter
Press
Enter
Press
Enter
Press
Enter
Save
If the material is not available in storage location of same person who has created/released
Maintenance Order
Release Order
Enter /niw32 in Transaction window
Click Green Flag icon for Release. Click Component tab; Click Gen data
Click Gen Data tab and Notedown Reservation No.
Goods Issue
Enter /nMIGO in Transaction window; select Goods Issue; & Reservation
Save
Check the qty in Quantity tab ; Enter Goods Recipient in Where tab
Check the Item OK checkbox; Click Check; Click Post tabs
Notedown Material Document Number.
save it.
ORDER CONFIRMATION : Entry of Actual Hours
Enter /niw41 in Transaction window
SAVE
Page 4 of 49
10
11
Press
Enter
Page 5 of 49
EXERCISE : PM-3.3
1
2
continue
Click Operations tab; Goto Control Key field; select PM01 ,enter (No of units reqd ) NU:- 2; duration :- Press
Enter
1; Work gets calculated
Material Issue against Reservation (if the material is available in storage location of same person
who has created/released Maintenance Order )
Click Components tab;Enter Component:e.g. 12000175; Reqd qty:- 2; UM:- EA; IC:- L(Stock item);
Sloc:-1000
Click on the material availability icon to ensure availability.
Press
Enter
If the material is not available in storage location of same person who has created/released
Maintenance Order
Please refer MM Script of Material Stock transfer :
A. Request (Reservation with Mvt type-913 along with its work flow) is to be created for
transfer of material from Main Store/any other store to the storage location the person who
has created Maintenance Order.
( MB21 (Mvt-913)->Workflow-> Approval.)
B. Transfer of required material/store from Main Store/any other store to the storage
location of the person who has created Maintenance Order with necessary work flow for
approval process to store transfer. (MIGO ( "transfer posting" Mvt 915)-and >MIGO(Stock "
placing in storage" at receiving SLOC,w.r.t Material document of Mvt- 915)
or 2. Material Procurement process.
5
Release Order
Enter /niw32 in Transaction window
By default Order No. appears; if not enter it
Click Green Flag icon for Release. Click Component tab; Click Gen data
Click Gen Data tab and Notedown Reservation No.
Goods Issue
Enter /nMIGO in Transaction window; select Goods Issue; & Reservation
Enter the Reservation Number you have noted above
Check the qty in Quantity tab ; Enter Goods Recipient in Where tab
Check the Item OK checkbox; Click Check; Click Post tabs
Save
Save
Page 6 of 49
7
8
-Enter Further Details in Vendor Docket Screen in Notification regarding completion of work by
Vendor etc. - (Select User Status ) - if Penalty is not proposed ( PNP )
Maintain Vendor Docket Details regarding completion of work and performance by Vendor etc
Standby provided by the Vendor ? - YES or NO,
Quality of Service - Satisfactory or NOT Satisfactory
10
11
12
Execute
Save
Service Entry Sheet ( SES ) of Vendor ( Ref. Page no 115 - 121 of Breakdown manual)
Create Service entry sheet with reference to Purchase order ( AMC PO ) - ML81N
( AMC PO is available in Equipment Master data - as characteristics )
Refer relevant PM Vendor Docket Report ZPM01 and its summary for performance of the vendor
and calculate the penalty amount if any and fill in the SES at relevant place .
Release should be affected based on PM Vendor Docket Report ZPM01 and its summary for
performance of the vendor and considering the penalty amount if any
SAP INBOX WORKFLOW - Release Service entry sheet
Initiate SES release for next level.
Enter comments for next reviewer.
Select next approver by location and position and Click Initiate.
Login into system with approvers user id, and open SAP Inbox. Select SES Release message, the
system will show the SES to be approved. Approve and Forward
13
15
14
Page 7 of 49
EXERCISE : PM-3.4
Enter
Enter
Enter
Save
Execute
Get the required Vendor Data created in system by FICO/MM( However vendor data is fetched from
the APO ( Available CONTRACT ) :Enter Vendor ; eg.1000046; Tax code:eg. Z0;
Save
Release PO
Check The SAP business workplace ( INBOX ) for initiation of PO release workflow process.
Call the Vendor:
Enter The Vendor Details in Vendor Docket Screen in Notification
Fillup the PO detail in VENDOR DOCKET Screen in NOTIFICATION ( Created earlier ) Communication Details (Filled to inform specific person from vendor side) and other details regarding
docket booking etc
Set Status VEND.
Information to Vendor is sent to Vendors Email ID thru SAP as per the details maintained in Vendor
Docket Screen .
REMINDER - REMD &
Final Reminder - FREM can be checked as per communication.
Page 8 of 49
10
continue
If the material is not available in storage location of same person who has created/released
Maintenance Order
Goods Issue
Enter /nMIGO in Transaction window; select Goods Issue; & Reservation
Enter the Reservation Number you have noted above
Check the qty in Quantity tab ; Enter Goods Recipient in Where tab
Check the Item OK checkbox; Click Check; Click Post tabs
Notedown Material Document Number.
Save
13
14A
Execute
Save
Page 9 of 49
14 B
Service Entry Sheet ( SES ) of Vendor ( refer process manual page no. 207 - 213)
Description of service rendered is reecorded in Service entry sheet.
Create Service entry sheet with reference to Purchase order ( PO ) - ML81N
Refer relevant PM Vendor Docket Report ZPM01 and its summary for performance of the vendor
and calculate the penalty amount if any and fill in the SES at relevant place .
Release should be affected based on PM Vendor Docket Report ZPM01 and its summary for
performance of the vendor and considering the penalty amount if any
SAP INBOX WORKFLOW - Release Service entry sheet
Initiate SES release for next level.
Enter comments for next reviewer.
Select next approver by location and position and Click Initiate.
Login into system with approvers user id, and open SAP Inbox. Select SES Release message, the
system will show the SES to be approved. Approve and Forward
15
16
17
Page 10 of 49
EXERCISE : PM-3.5
Enter
Enter
Press
Enter
Press
Enter
Press
Enter
Press
Enter
Save
, click on INITIATE .
Save
click Release icon as per R & A for Initiator & Comp Authority
Creation of PO, and Release(PO will be created by Authorized person only)
Enter /nME21N in Transaction window
click Document overview ON; click on select variant icon; select Pur Reqsn
Execute
Enter Purchase Requisition No.
Select Need based Order; Drag and drop the PR No. to the basket
Get the required Vendor Data created in system by FICO/MM(For selection of Vendor, MM team may
Save
be contacted):Enter Vendor ; eg.1000046; Tax code:eg. Z0;
Press "Enter" three times to ignore warning messages, if it comes.
Save
Page 11 of 49
9
10
Page 12 of 49
continue
Press
Enter
Release Order : Enter /niw32 in Transaction window By default Maintenance Order No.
appears; if not enter it
Click Green Flag icon for Release.
It is supposed that temparary advance taken as per ty. advance request process.
Temparary advance settlement process:
1) Use T-code ZFI069_2_2, for settlement of temporary advance.
2) Give the advance request number and Click on Create
3) Create advance settlement screen will appear4) In the expense Tab , the approved amount against different expense heads will come by
default . Entries in the Settled amount and Number of Bills will filled based on entries
against the expense bill will be entered in the part.
Save
For linking maintenance order with the concerned maintenance expenditure done through
temp advance:- during the temporary advance settlement, the below steps are to be
followed in the " Settlement Expenses " part:
1. under CO Object column, select Order Number
2. Under Co account column, fill in PM order number.( e.g. 10200xxxxxx, as created
in step 2 of PM-3.6)
( By selecting "Order Number" in Co Object column, cost will be traced through the
Maintenance Order for Equipment. Finally it is settled at COST CENTRE
that is defined in the Maintenance Order. cost can be seen under COST" TAB
in the Maintenance Order. )
Follow the Temparary Advance settlement process workflow.
Execute
Save
save it.
User guide of PM processes
Page 13 of 49
Confirmation of Notification
Enter /niw22 in Transaction window ( or IW28 search )
Click on the pencil icon at the Status field; window pops up
Press
Enter
Save
Page 14 of 49
EXERCISE : PM-04
3
4
5
Completion of notification
Click Black & White flag icon
15
In the Catalog data, select object part and damage tab. Enter the appropriate code group
thereafter or write description of activity
eg CIVIL-JOB,IT-JOB etc
Send the Notification to all concerned using this tab available at top left corner
All the stake holders will open their SAP Mail Box and will create the new Notification with Main
Notification number in the Notification description
Completion of Notification
Concerned person will do the required activity
Material or service may be taken in New Notification/Order like in Break down Notification, if
required.
Thereafter person responsible will complete the causes and activity sheet in Main Notification
and will intimate the initiator using same process as mentioned above.
Click Black & White flag icon on toolbar; Status changes NOCO
EXERCISE : PM-6
after attaching the document in T.cdoe ZSP01, using attach document press save button.
1.c Now press update button , and enter the Total Mantenance cost incurred over the
Equipment, and press save button.
1.d Now press, Assign reviewer and approver(Assign Rv-Ap) button, enter reviewers and
approver IDs (as per in hierarchy), and press assign tab.
Now press submit button and system will prompt to select out of forward/return to and
press send note sheet, thereafter message will go to the reviewer's inbox.
1.e Now reviewer will open his SAP mail , and update the remarks in "status by reviewer
tab" under proposal tab then pressing save and go to notes sheet tab, and may send the
note sheet or ask for clarification(if required,otherwise press send note sheet).
after reommendations of reviewer, document will come to SAP mail box (SBWP)of
Approver.
Approver will open his SAP mail and finally approve the proposal or send back for
clarification(if required) by putting required remarks in Proposal document.
Mention the convener, members, chairman and approver ID,s for scrapping committee
thereafter press save button, system will generate the
scrapping committee document no.If due to any reason, committee is required to be
reformed, then go to T.Code ZSP02, and then go to update tab and re enter the member's
/name and give the required reason/comments in the bottom of Screen and save.
Now the above mentioned scrapping committee is required to be approved by the
competent authority by going to T.code zsp02 then submit SC
Enter the user ID of competent authority for approval and send note sheet,thereafter
system will send the document to his SAP mail box.
He(competent authority) will open his SAP mail box and will approve the committee as
done earlier.
Contd.
Now this ZSA type document will be uploaded using T.code ZSP03, using "DOC-upload"
tab,then press save button.
After up loading the Document (scrapping committee draft letter), Click "SA-Submit" Tab
and send to Approval persons as available in hierarchy for further correct the
status/approval in SAP System up to Final approver/competent authority.
Now first person in the approval heirarchy will open the SAP mail box(SBWP) and will enter
the correct status and comments as done earlier in the scrapping proposal process
After filling the required comments press" save and go to notesheet" tab, now write the
required comments in notesheet as text and press the " send notesheet" tab.
thereafter the document will reach in the SAP mail box of next person in the chain,
wherein he will put his remarks , as done in the previous step, thereafter document will go
the SAP mail box of Final approver.
Final approver will open his SAP mail box a, will select the suitable status and will write the
required comments and will press save and go to notesheet tab.
Thereafter he will write the required comments in notesheet in free text, and will press the
approved tab. The intmation regarding Equipment Scrapping approval or Rejection will
reach in the SAP Mail Box of Initiator/convener and ACE-9 Preparation will start
accordingly.
4.a Go to T.code ZSP04 and press"Create ACE-9 report", then write the descreption of
ACE-9 also write the scrapping approval document no.
Enter the Net Book value, Anticipated realization value, decommission date and
decommission value whatever written in scrapping committee document (draft letter) etc
Enter it and system will generate the ACE-9 Document no.
Now ACE-9 is required to be updated for this again Click "update ACE-9" tab
Now print of system generated ACE-9 can be taken from ACE 9 print from ZSP04 T.Code,
after taking the print the same is required to be signed by committee members
Once signed, same is required to be uploaded into the system, by "upload ACE 9" tab, as
has been done earlier.
Now this uploaded ACE-9 is to be forwarded to all concerned e.g
A.O.(SBP/Plg)/CAO/AGM/DGM/DGM- SSA In-Charge/IFA/Approving Authority (SSA/CGM)
by clicking the "ACE-9 NoteSheet". Final approver (IFA/SSA/Circle Head) have to be check
Decommission value of ACE-9 and save and comments for approval as available in drop
down.
After getting approval from as above concerned competent authority, go to again "upload
ACE-9" Tab for sending this approved ACE-9 to Finance(FICO) person for further
necessary action at FICO End either through this SAP Mail.
The document to be attached is first uploaded using document type as ZAC and
Document status first "CR-Created" then "AD-approved" and Save, document will self
approved attaching poit of view
write the description of document , thereafter attach the required document using this
button at the bottom
Go to the top left corner button 'service for object'--->send--->send object with note, one
screen will open and fill/write Descriptions regarding ACE-9 sending, fill the Recipient ID-->ENTER, Recipient name will display then go to the send button in the bottom and click,
ACE-9 will reached in the SAP Mail Box of FICO person.
EXERCISE : PM-7
Press enter
Press save
Press enter
EXERCISE : PM-9
G1 Notification
(Used when our equipments got malfunctioned due to fault in other equipment
maintained by other maintenance Work Centre)
Go to iw21 T.Code, select G1 as Notification type
complete the Description field
select System impacted tab, enter the equipments/FL affected
Maintain the partners Initiator & Person responsible, as done already
Save the Notification.
Later on , the person who will acknowledge this Notification , will update the
"Actual Notification number" in system impacted tab,
after creation of actual Notification number over the faulty equipment.
1
2
3
4
5
Finally the initiator will confirm the G1 Notification number as done in other case.
Example:
SWITCH SWITCH goes down due to Transmission media fault
G1 Notification
1 IW21 - Create Notification with TYPE -G1 by Switch side - Initiator ( Switch Person )
SYSTEM STATUS
STATUS
OSNO
CRTD
G1
USER
ACKD
by TXM person responsible
7
8 NOPR
After Acknowledge the fault ( G1 ) , TXM Person responsible will create his /her OWN
9
breakdown notification ( B2 ) or use already created notification
10 Record that notification in the G1 notification at SYSTEM IMPECTED TAB
at ACTUAL FAULT NOTIFICATION ( B2)
Befor confirming the notification ( B2 ) by initiator ( TXM ) , the INITIATOR of B2 ( TXM
11 )/Person responsible of G1 will compelete ( COMP ) the G1 notification and sentd it to
initiator of G1 for confirming the G1 ( CNFR )
12
COMP
by TXM person resp. of G1
13
CNFR
by INITIATOR of G1 ( Switch )
TXM
EXERCISE : PM-10
Re-Parenting Process :
Functional Locations and Equipments can be shifted within the same Plant,
across Plants and across Company .
For Functional Locations, the naming convention is based on Structure
Indicator and hence, the same FL cannot be shifted with the existing FL label.
Deletion Flag (DLFL) is set on the existing FL and a new FL will be created with
new label according to the new structure. To carry forward the history, the Old
FL label will be maintained in the new FL Master.
Equipment shifting within the same Plant will involve dismantling and
installation and changing of master data parameters such as Planner Group,
Work Centre, etc.
For Equipment Re-parenting across the company , Set the deletion Flag and
REPO on existing Equipment and create the new Equipment in new company.
There are four Scenerios in Reparenting process :A) Reparenting of Functional Location(FL) within same company:
iii.
iv.
Go to change document by T-Code CV02N or clicking on change icon and press enter.
fill the document No. ,document type,document part and document version and press
enter.
Change the document status "Data upload(DU)" in the document data tab page.
as soon as we move to the next tab page Reviewers\Approvers, one pop menu will
appear ,there we have to filled log field and continue.
fill Reviewers , go to approver tab page and fill Approver and save.
by T-Code CV02N/Clicking Change icon with enter.
assign the document to reviewer by changing the status Review Request(RR) in
document data tab page and save.
as soon as we save the document one pop menu will appear ,there we have to filled log
field and continue.On saving the SAP Mail will go to Reviewer
Reviewer will open the SAP INBOX and see the mail of request reviewer
Reviewer will come back and click on review ok or review not ok and accordingly fill the
remarks and continue.Now SAP mail reached to next reviewer or Approver.
Approver will open the SAP Inbox and see the mail of request approval.
Approver will come back and click approval ok or Reject or clarification required ask for
or cancel& keep in Inbox and continue.
On approval ok or reject, SAP mail reached to Initaitor and reviewers SAP Inbox.
If,the option clarification ask for selected one additional document is generated for
clarification.This document can be sent to iniator or reviewers.
This ZRP document will attached to re-parented equipments and FL in "class and Docs"
note :tab page.
Step3 De-asign the Task List from Maintenance Plan by T-Code IP02
Enter Maintenance Plan No and enter
Click on "Cancel asignment for Task list" Icon and save
v.
Step5
Step6
Step7
Step8
Step9
Step10
Step11
Step12
Contd.
Contd.
Step6
Step7
Step8
Step9
Step10
Asset Transfer Script --------Refer FICO Process Script for Asset Transfer
Create new equipment number based on newly created Assetby T-Code
Step11
IE01/ZPMUPLOAD10.
Upload ZPMUPLOAD10 Excel File and execute.
Step12 Create Equipment Task List byT-Code IA01/ZPMUPLOAD 19.
Set Deletion Flag to Functional Location/ Equipment Task List (if any) byT-Code
IA12/IA02
Contd.
Step15
Contd
EXERCISE : PM-11
#
#
#
#
2
#
3
6
7
Under Explosion, mark the check box upto BOM explosion & execute
Select the required Equipment or FL & select 'Goto' in Menu.
Select 'create Notification' and then general, thereafter press enter.
Select B6 in Notification Type and press enter
Enter fault description in Notification field
Enter Priority : select Major/ Critical / Minor
Enter details of fault in Description field
Enter Planner Group: e.g. -FID , if prompted by system.
Enter Funct:- ZI Initiator; Partner :- select by search ( or as per data maintained in
equipment master )
Enter Partner Function : Recom/ Forward Authority - , & Maintain User Status to AREQ - ( Approval Requested )
Press Enter
Save
Information will go to Recom/ Forward Authority , through SMS & Mail / SAP Mail.
Notification is Created - Note down the Notification number for reference only.
If the authority is competant to approve the Shutdown then he/She will APPROVE it , or
Send to Another Approving authority by Recommanding this Notification.
- The authority can maintain the Partner function - for Recom/ Forward Authority - , &
Maintain User Status to R & F1 ( Recommanded/Forwarded 1 ) and Save it
Save
Similarly information will flow to another R & F1 authority and He/She can send Notification
to approve , by maintaining the Partner function - for Recom/ Forward Authority - , &
Maintain User Status to R & F2 ( Recommanded/Forwarded 1 ) and Save it
Save
Similarly information will flow to another R & F2 authority and He/She can send Notification
to approve , by maintaining the Partner function - for Recom/ Forward Authority OR
APPROVAL AUTHORITY - , & Maintain User Status to R & F3 (
Save
Recommanded/Forwarded 1 ) and Save it
Now if the Officer is competant to Approve the Shutdown request notification , HE/SHE can
APPROVE by maintaing the USER STATUS - APPROVED - APPD
(Approval details are to be recorded as long text by each and every approving authority)
User Staus - REJC can be use for Rejecting the Request.
Take on spot Approval from NMC through telephonically and Change user status to NMCA
(NMC should be contacted directly by person responsible for final clearance and set
NMCA/NMCR status)
After getting APPROVAL from NMC , put notification in PROCESS by Green flag ( NOPR )
Click Green flag icon
Press Enter
Completion of Notification
Enter /niw22 in Transaction window ( or IW28 search )
Press Enter
Click on Catalog Data tab; Object Part & Damage part tab highlighted
Press Enter
Press Enter
Contd
Press Enter
Press Enter
#
#
Enter Start date & Time ; End date & Time using search codes
Click Black & White flag icon
If Material or External Service is required , please Refer the Breakdown Maintenance order
procedure
EXERCISE : PM-12
Calibration Maintenance Notification
Calibration Process is used to gauge the accuracy of equipment. Calibration can be
done at the time of installation, at regular intervals , when measurement of equipment is
erratic ,when a malfunction is encountered or if demanded by statutory body.
Calibration may be done by Internal team or by External Agency, both the cases have been
demonstrated.
1
1.1
1.2
Scheduling Mtce Plan & creation of B5 Notification & BM05 Mtce Order.
Enter /nIP10 in Transaction window
By default Mtce plan number appears; if not enter it
Click on Start button at top-left
Enter "start of cycle date" and save
After this system will generate the B5 type Notification, same may be searched from iw22
or iw28
From Notification create the Mtce order as is being done in Breakdonwn Mtce
Thereafter release the Mtce order and save it.Then see the inspection lot Number in Top
right hand using clicking this
Contd
Now Note down the inspection lot number.
Now Open New Transaction QE17 in T.Code, record equipment Results window will come,
thereafter write down Equipment number in the appropriate field
Then Press enter, and enter the inspected quantity as defined and value, press enter
New window will pop up having different valuation,
2
2.1
Now run the T.Code QA11, for record usage decision, enter the Inspection lot and press
enter
Now select the required UD code eg."Accepted" and press Save button.
Now Run the T.code QA13 for viewing of calibration result, then enter inspection lot and
press enter
Then Go to usage decision, print, Inspection print and finally click the execute button
After this go to iw32, then in order Menu, function, and then complete business.Also please
complete the B5 Notification.
Calibration by External Agency
Follow the same steps as has been done in previous case till creation of Mtce order.
Go to change mode in Mtce order using iw32, go to operation tab, then in external service
tab as is being done in Break down Mtce
System will generate the PR(Purchase Requisition, as being done in Break down) further
create the PO(Purchase order)
for taking Vendor service as per MM Manuals.
Thereafter take the service and confirm the Mtce order using iw41, as was done in Break
down.
For attaching the external agency report, go to the Mtce order in change Mode, and click
on the attachment button at top left corner
Then go to create, and then create attachment, thereafter attach the requireddocument.
Then go to iw32 and further go to order menu, then complete and then
complete(technically), then do the complete business, as done earlier.
Finally complete the Calibration Notification.
EXERCISE : PM-14
Corrective Maintenance
1
Creation of Measuring Point ( Such measuring points are already created and available in
the SAP system by MDM team , as this is one time activity. This step is for your information
only . )
Enter /nIK01 in Transaction window
Enter equipment No "103000000896"
Select Measuring point category as C
Fill measuring position- Switch room, Description - Temperature of switch room,
Characteristics- Temperature
Preass
enter
Preass
2
3
enter
Select code group - CBM
Enter target value - 20 (bottom)
Click on additional data button at top left
Entet upper and lower tolerable values , continue and save
Note the measuring point no
Similarly you can create another measuring point for voltage
Creation of Measuring Document : w.r.t. Measuring point
Enter /nIK11 in Transaction window
By default Measuring point appears; if not , provide the measuring point of the Equipment or FL.
EXERCISE : PM-15
AMC requirement gathering:
AMC is awarded to Vendors for a group of Equipments. The process of
AMC requirement gathering will involve communicating the list of
Equipments as well as the list of Services to the procurement department.
The list of services will be in the form of Service PR. This PR will be
generated from a maintenance order of type BM07 and in this order; the
list of equipments will be maintained as Object List.
On finalization of Vendor and awarding of AMC, the AMC P.O. Number as
well as the AMC start date and end date will be updated in the Equipment
Master.
Steps of AMC Requirement gathering process:
1. Create Maintenance Order IW31 ( BM07)
This order contains
Functional location ( SSA ) ,
Maintenance Workcentre ,
Services required ( For AMC ),
List of equipments for which AMC is required ( Object TAB ),
There should be separate order for
2. RURAL OR URBAN
2. Purchase Requisition ( PR ) will be generated after Release of this
Maintenance Order.
3. Service PR generated and available in SAP Inbox of the person
releasing the Maintenance Order.Purchase requisition is initiated,
Released or Forwarded and Finally Released as per workflow.
4. All SSAs will communicate their PRs through SAP Mail for sending to
Their Circle for further compilation. All SSA PRs will be compiled (manual
in Excel) at Circle Level.
5. At circle level one Final Single PR will be created- ( Consolidate Item &
their Qty. of all PRs from different SSA are noted and entered manually in
Purchase Requisition with the help of copy and paste functionality.)
This Circle PR will be Released/Approved as per SAP WORKFLOW.
6. All Circles will communicate their PRs through SAP Mail for sending to
Corporate office for further compilation. All these PRs will be compiled
(manual in Excel) at Corporate Level in the same way as at the circle level ,
and one single PR is created at corporate level taking in account all
services & their quantities as per requirement of SSA / Circle.
11. Now different PRs ( purchase requisition sent by SSA to circle ) will be
assigned to the APO ( Created by Corporate Contract) by circle.( ME56 )
12.Circle office will create different Purchase Order ( PO ) for different SSA
with reference to their PR. These POs are release / approved as per
workflow. ( ME21N)
This PO will take the Rate/ Price from APO ( Contract created at corporate
level ) and Quantity of services from PRs of respective SSAs.
13. This PO will be updated to equipment master by circle office.
( ZAMC_UPDATE).
14. In Case of ARC gathering & it's updation , SSA will create their purchase
requisition ( PR ) and communicate to Circle office. See above step no. 3 to 11
15. The ARC ( Contract ) will be updated to equipment master through T - Code (
ZARC_UPDATE).
Select the ms excel file as per format
(Starting from third row in the format
Equipment No. ARC_APO no. Start Date End Date - )
EXERCISE : PM-16
AMC Tracking of Card / CPE:
( one T-code ZCC and radio buttons)
2. Maintain Manufacturer, Type and the ( capacity for cards only ) .
4. Data of OLD cards & CPE are to be uploaded after approval of service PO at SSA
/Circle
5. Final plant and storage location of materials are maintained by the SLOC where the
materials finally received for consumption.
- for cards / component through EDIT transaction
- for CPE through maintain final storage location transaction.
6. Report based on different parameters for tracking AMC/Warranty of Card & CPE are
available using radio button.
EXERCISE : PM-17
PM REPORTS & T- Codes
PM
IW29
PM
IW39
PM
IW49
PM
IW3M
IW13
Standard Costing
Summary / Analysis for
6 Maintenance Orders with PM
customized selection
options
Standard MTTR and MTBF
for equipments with
7
PM
customized selection
options
Standard Location
8 Analysis with customized
selection options
PM
MCI8
MCI3
PM
MCI4
MCI5
Standard Breakdown
11 Analysis with customized
selection options
MCI7
PM
34
Standard List/Trend of
Measurement documents
12
PM
with customized selection
options
Standard list of
Notification Report with
14
customized selection
options
IK17
IH08
PM
IW28
CR05
Standard Report on
created Equipment with
16
customized selection
options
PM
PM
IH08
IH08
Enter Equipment
Enter Equipment description
Enter Material
Enter Serial number
Enter Period
Enter Partner
Enter Selection Profile
Estimated Maintenance
Report
PM
PM
ZPM01
ZPM02
PM
Shutdown Request
Deviation Report
PM
5 G1 Notification Report
PM
PM
8 List of Locations
PM
List of Maintenance
Planner Groups
PM
11
T - Codes
Creation of Notification
Change Notification
Display Notification
Notification List Editing - Change
Notification List Editing - Display
Notification List Editing - Display Multi Level
Create Plant Maintenance Order
Change Plant Maintenance Order
Display Plant Maintenance Order
Maintenance Order List Editing - Change
Maintenance Order List Editing - Display
12
13
1
2
3
4
5
6
7
8
9
10
14
15
16
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
39 a
40
41
42
43
44
IW21
IW22
IW23
IW28
IW29
IW30
IW31
IW32
IW33
IW38
IW39
IW41
IA03
IA13
IR03
KO88
IP41
IE02
IE01
IE03
IE05
IE08
QS42
ML81
MM03
CS03
IH01
MIGO (Display)
MIGO (Cancellation)
MIGO (Goods Issue)
MIGO (Return Delivery)
MIGO(Transfer posting)
IP02
IP03
IP10
IP30
IP11
IP12
IP19
IP24
IP42
IL02
IL01
IL03
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
IL05
IL06
IA11
IA12
IL02
IA05
IA06
IA01
IA02
IE03
IR01
IR02
IK11
IK12
IK13
IK01
IK02
Ik03
IK08
Ik07
Change of PR
Display of PR
Approval of PR
Change of APO
Display of APO
Approval of APO
10
Change of P.O
11
Display of P.O
12
Approval of P.O
13
14
Change of RFQ
15
Display of RFQ
16
Approval of RFQ
18
Creation of SES
19
Change SES
20
Display SES
21
Approval of SES
ME51N
ME52N
ME53N
ME54N
ME31K
ME32K
ME33K
ME35K
ME21N
ME22N
ME23N
ME29N
ME41N
ME42N
ME43N
ME45N
ML81N
ML81N
ML81N
ML81N
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
Creation of Reservation
38
Change Reservation
39
Display Reservation
39 a
Approval of Reservation
40
41
42
43
44
45
46
47
48
List Display-Reservations
List Display-PR
VL31N
VL32N
VL33N
VL10B
VL02N
J1IJ
MIGO (Good Receive)
MIGO (Display)
MIGO (Cancellation)
MIGO (Goods Issue)
MIGO (Return Delivery)
MIGO(Transfer posting)
MI01
MI02
MI03
MB21
MB22
MB23
ZMM_RES
MK01
MK02
MK03
AC01
AC02
AC03
MM01
MM02
MM03
Reports/Lists
10
12
13
Stock Report
14
1
2
3
4
5
6
7
MB25
ME5A
ME2L
ME2M
ME2N
ME3L
ME3M
ME3N
MB51
MMBE/MB52
J1IDEPOTSTOCK1
Zee codes
ZMM_APDTL_CHG
ZMM_MM02_BD
ZMM_WORKFLOW
ZMM01
ZMMF_APO
ZMMF_DEPOT
ZMMF_NRGP
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
ZMMF_PC
ZMMF_POAMEND
ZMMF_PR
ZMMF_QUOTATION
ZMMF_RES
ZMMF_REXINV
ZMMF_RGP
ZMMF_SPO
ZMMP_AP
ZMMP_POAMEND
ZMMP_POTOL
ZMMP_REL
ZMMP_RGP01
ZMMP_RGP02
ZMMP_RGP03
ZMMP_RGPRET01
ZMMP_RGPRET02
ZMMP_RGPRET03
ZMMP_SFGS
ZMMP_SMO01
ZMMP_SPO
ZMMP_VC01
ZMMP_VCL01
ZMMPDF
ZMMR_APR
ZMMR_ARR
ZMMR_MTXT
ZMMR_QA
ZMMR_REL
ZMMR_RGP
ZMMR_ROL
ZMMR_SFGS
ZMMR_SMO
ZMMR_SMSTOCK
ZMMR_SPO
ZMMR_STOCK
ZMMR_VC
ZMMR_VM
ZMMP_INI_AMEND
ZZMM_MARD
ZZMM_MSEG
ZMMP_LD
POC
ROP Phase -I
KTK
Gujrat /
Andhra /
Punjab
MH
ALTTC
WTP
STR
WTR
BBNW
NATFM
Telecom
Store Kolkata
Telecom
Factory
BSNL CO
Teritorial Circles
( AP/PB/Guj/MP/
TN/ )
Company
Code
( XXXX )
Teritorial Circle
Offices
Company
Code
( XXXX )
Maintenance
Regeion
( WTR / )
Company
Code
( XXXX )
GM Area
( Region )
XXXX
DGM Area
Sub region
(X)
Division
( XX )
Sub Division
( XXX )
Telecom Store
Company
Code
( XXXX )
Plant
( XXXX )
Bldg/ EXCh/
Location
(X)
FLR code
( XX )
Type of
Unit/ Section Equipment (
( XXX )
XXX )
xxxx-xxxx-x-xx-xxx-xxx
NATFM
Company
Code
( XXXX )
Plant
( XXXX )
Bldg/ EXCh/
Location
(X)
FLR code
( XX )
Type of
Unit/ Section Equipment (
( XXX )
XXX )
xxxx-xxxx-x-xx-xxx-xxx
Plant
( XXXX )
BBNW UNITS
(X)
Bldg/FLR/
EXCh/
Location
(XX )
Plant
( XXXX )
Building
(X)
Broadband
Network Circle
BSNL Corporate
office
Company
Code
( XXXX )
Company
Code
( XXXX )
SSA/Plant
( xxxx)
SDCA
( XXXX )
xxxx-xxxx-xxxx-xxxX-xxx
Building
Code(AB) & Unit/Section
Plant Code Floor Code(
code
Plant Section
( xxxx)
CD)- ( XXXX)
( XXXX)
( XXX )
xxxx-xxxx-xxxx-xxxX-xxx
STATION /
Functional
Unit ( XXX )
Type of
Unit/ Section Equipment (
( XXX )
XXX )
Type of
Floor code Unit/ Section Equipment (
( XX )
( XXX )
XXX )
Plant
Section
( XXX ) xxxx-xxxx-x-xx-xxx-xxx-xxx
xxxx-xxxx-x-xx-xxx-xxx
xxxx-xxxx-x-xx-xxx-xxx
BACK
Equipment Maintenance
JTO/SDE Work Centre
DE/DGM Planner
AMC / Warranty is
available
A
Preventive Maintenance B1
Process --Single Cycle Plan
Scheduling
Stategy plan
Dead line monitoring
Create Maintenance
Order with PM03
control key and
reference Available
APO , Maintain
"Agreement " in
M.O. and many
more related
parameters.
After release of
Maintenance order PR is gererated and is
available in SAP inbox
of person releasing
the M.O. This PR is
to be INITIATED &
APPROVED as per MM
Workflow.
Corrective
maintenance Process
Measuring points /
document :-readings taken
on Equipment- tested and
filled in measuring
document
T code:
IK11
OK
take
decision on
valuation
code
Complete the
Notification after
Confirmation
CNFR/NOCO
Set various
parameters like
Malfunction End
date/time,Catalog
e data etc.
Quotations/Tendering process
will follow.
NOT OK
Change G1 notification by
Entering Actual Affecting
Eqpt. Notification Number
- CASE
- Notification Type
ME21N/ME22N/
ME29N
Post Down
Payment, and Call
Vendor through
Vendor docket
Details
INITIATED &
APPROVED as per MM
Workflow )
Creation of Contract by
Service Master record ,
MSS etc by
AC03/ML10/ME31K
General Maintenance B3
Confirmation of
Maintenance order -IW41
Cost Settlement of
Maintenance order by
TCode : KO88 or KO8G
(
This settlement can be done
before TECO status of M.O.)
Business Completion
( CLOSURE of the
M.O.)
ANNEXTURE - I
Temporary Advance Request Process
1) Create temporary advance request through T-code ZFI069_2_1
2) Click on Create. Employee Number (vendor code), Company Code, Business Area
will come by default.
3) In the Expenses Tab , select the Reason code for applying the advance and enter
the amount. Enter the Text in the comments box.
4) Click Save. Amendments can also be made by Change tab before submitting it for
approval.
5) Submit for approval after checking. On Submission , below message will come
will come by default . Entries in the Settled amount and Number of Bills will filled
based on entries against the expense bill will be entered in the
part.
Pre requisite:
Maintenance Order is to be created and released in PRD for the
concerned Maintenance by the concerned person.
1 Create, Assign & Acknowledge the Notification using steps 1 to 3 of EXERCISE
PM-3.1 ( Breakdown Notification )
2 Creating & Approving Order
- Press Enter
c) Click on Create order icon ; Create order window pops up; click to continue
d) Ignore any message about date and continue
e) Object information window pops up; click to continue
f) Click Operations tab; Set Control KEY PM01
i.
ii.
iii.
iv.
v.
FAQ:
A) I have a cable fault and about 10 vouchers to claim in temporary advance account.
advance account is still not yet approved by the competent authority. What shall I
do?
Ans.: You can cancel the Technical completion by following procedure.
Go to IW32 and Click on Order>Functions>Complete>Cancel Technical completion.
By doing the above, order status will be reverted to REL state.
ANNEXTURE II A
Invoice verification against purchase order / SES MIRO
Invoice verification against purchase order is covered in this step, the verification
process is based on purchase order and vendors invoice is accepted in the system.
This step of process covers all procurement made against purchase order whether such
procurement for goods, service & Capital goods.
Acceptance of invoice creating the liability for vendor to be paid in the books of
accounts.
MIRO
Description
Enter Vendors Invoice date
Enter the Invoice posting date
Enter the Invoice Amount
To calculate the amount of Tax on the basis of condition
type
Select the condition code from drop down option
Purchase order No
You need to enter a purchase order that corresponds with this invoice. Click Purchase
order/scheduling agreement Button
. For
Example: PO NO. 4200000482.
Click on the Enter
Click Simulate Button
1.2
ANNEXTURE II B
Display Invoice Document.: Transaction Code- MIR4
Then click on
generated at the time of MIRO
1.3
A vendor made a mistake regarding the quantity to be invoiced and you asked for a credit memo for
material as well as service. Now you received a credit memo and you need to post it.
Via Menus
MIRO
You need to enter a purchase order that corresponds with this invoice. Click Purchase
order/scheduling agreement Button
. For Example:
PO NO. 4200000482.
Click on the Enter
Enter the Input Data in the mentioned field with the help of below mentioned table
Field Name
Invoice Date.
Posting Date
Amount
Calculate Tax
Enter the Amount in
Line Item
Description
Enter Vendors Invoice date
Enter the Invoice posting date
Enter the Invoice Amount
To calculate the amount of Tax on the basis of condition type
The Amount of Subsequent Credit to Vendor
Enter
-
Click on the
Click the Invoice Document option in the menu bar & select the Reverse option.
Then System reverse the Document
Message bar display message