Contents
1.
Purpose....................................................................................................................................2
2.
Scope........................................................................................................................................2
3.
Definitions...............................................................................................................................2
4.
References................................................................................................................................2
5.
Responsibilities........................................................................................................................2
15.
Site Manager:....................................................................................................................2
25.
Site Engineer:....................................................................................................................2
35.
45.
Supervising Engineer:.......................................................................................................3
6.
IMPLEMENTATION..............................................................................................................3
16.
General..............................................................................................................................3
26.
Equipment List..................................................................................................................3
36.
Transport, Storage.............................................................................................................4
46.
56.
7.
Installation.........................................................................................................................4
HSE..........................................................................................................................................5
17.
27.
Machinery.........................................................................................................................5
37.
Lifting operations..............................................................................................................5
47.
57.
Manual handling...............................................................................................................6
67.
Restriction.........................................................................................................................6
7.
87.
Emergency response..........................................................................................................6
Dok. No.
Yay.
Tarihi
Rev. No.
Rev.
Tarihi
Sayfa
No:
TL 751.07
18.07.201
1
00
-2/6
1. Purpose
Purpose of this method statement is to define the sequence of GCB installation and safe execution of the
job.
2. Scope
The procedure applies for GCB transportation, handling, and installation at Electrical Building Roof
where these activities will be performed.
3. Definitions
GCB: Generator Circuit Breaker
4. References
Project HSE Manual
Drawings and design details
Training matrix is that how to install GCB and what kind of problems you are up against, to be
informed about safety, health and environmental action.
5. Responsibilities
5.1. Site Manager:
5.1.1.
5.1.2.
5.1.3.
5.1.4.
5.1.5.
5.1.6.
5.2.4.
5.2.5.
5.2.6.
5.2.7.
5.2.8.
5.2.9.
5.2.10.
5.2.11.
5.2.12.
5.2.13.
Dok. No.
Yay.
Tarihi
Rev. No.
Rev.
Tarihi
Sayfa
No:
TL 751.07
18.07.201
1
00
Site engineer ensure the coordination between other adjacent works are well
organized,
To perform inspections on daily basis, before each shift and after events that
could increase hazards.
To identify existing and predictable hazards or working conditions that are
hazardous, unsanitary, or dangerous to employees,
To take prompt corrective measures to eliminate or control hazards and
conditions.
To coordinate with Supervising Engineer from PPR.
To ensure that the staff involved in the activities has read and understand the
method statement.
To brief the staff involved about the healthy and safe performance of all
activities (toolbox talks).
To receive and/or define all standards including this Method Statement,
To obtain all the necessary standards,
To ensure maintenance compliance with this method statement.
-3/6
Dok. No.
Yay.
Tarihi
Rev. No.
Rev.
Tarihi
Sayfa
No:
TL 751.07
18.07.201
1
00
-4/6
6. IMPLEMENTATION
6.1. General
GCB is used protection of Generator.
Dok. No.
Yay.
Tarihi
Rev. No.
Rev.
Tarihi
Sayfa
No:
TL 751.07
18.07.201
1
00
-5/6
7. HSE
7.1. Personal protective equipment
PPE will be provided and used in accordance with the Project HSE Manual. Helmet, safety
glasses, high visibility vest, and safety shoes will be used at all the times. When personnel will
work at high places, they must use safety harnesses.
When work in dusty environment personnel will use dust protective half masks.
Hearing protection will be used where exposure levels exceed 85 dB.
7.2. Machinery
All machinery, equipment and tools will be maintained in good working order; will be inspected
regularly and color coded; and will be operated by competent persons. All necessary measures
will be in place in order to prevent environmental pollution. Guards will be in place to protect
workers from moving parts. Electrical tools will be double insulated and grounded connected to
ground fault circuit interrupters (GFCI).
All vehicles will have backing warning device. Banks man will guide vehicles
in narrow work places and when reversing. Vehicles will not pass, will not be
positioned or parked close to excavation edges.
Dok. No.
Yay.
Tarihi
Rev. No.
Rev.
Tarihi
Sayfa
No:
TL 751.07
18.07.201
1
00
-6/6
Taglines will be used all time, it refers to load to be guided and controlled.
Lifting equipment will not be used in the open air where weather conditions could affect the
integrity of the equipment or expose persons to danger.
7.6. Restriction
No food or beverages to be consumed at jobsite
No smoking
No work without permit
0530 568 11 66
Site Manager: 0530 237 08 54
HSE: 0507 762 69 64
Fire brigade: 0542 215 10 55
Site Medical Center: 0530 884 54 48
List of attachments:
1. List of the staff involved in the job
2. Toolbox attendance sheet
3. Risk Assessment
Dok. No.
Yay.
Tarihi
Rev. No.
Rev.
Tarihi
Sayfa
No:
TL 751.07
18.07.201
1
00
-7/6