Mech Check List
Mech Check List
MECHANICAL
VOLUME V
Section A : I.C. Engines
Section B : Driers
Section C : Soot blowers
Section D : Electrostatic Precipitator
Section E : Ash handling Plant
Section F : Miscellaneous
TITLE
COMMISSIONING/TESTING ESSENTIAL PREREQUISITES
SECTION A
1)
1)
2)
Wall Deslaggers
SECTION-C
1)
2)
1)
Clinker Grinder
2)
Scraper Conveyer
SECTION-E
1)
2)
Windbox Assembly
SCL.REF.NO
LIST OF MANUALS
STANDARD CHECK LISTS
MECHACAL
VOLUME I
VOLUME II
VOLUME III
VOLUME IV
VOLUME V
Section A
Valves
Section B
Section A
Section B
Pumps
Section C
Section D
Hoat Exchanger
Section A
Section B
Dampers
Section C
Duct Work
Section D
Section E
Power Transmission
Section A
Section B
C.M. Plant
Section A
I.C. Engines
Section B
Driers
Section C
Soot blowers
Section D
Electrostatic precipitator
Section E
Section F
Miscellaneous
MECHANICAL
STATION
PLANT ITEM :
SHEET 1 OF 1
ACTIVITY
1.
2.
3.
4.
5.
6.
WITNESSED
NTPC
BHEL
DATE
REMARKS :
SCL REF: MS 1/1
MECHANICAL
STATION
PLANT ITEM :
SHEET 2 OF 2
NO.
ACTIVITY
7.
8.
9.
10.
11.
12.
13.
WITNESSED
NTPC
BHEL
REMARKS :
SCL REF: M 15/1
DATE
MECHANICAL
STATION
PLANT ITEM :
SHEET 1 OF 1
ACTIVITY
1.
2.
3.
4.
5.
6.
WITNESSED
NTPC
BHEL
DATE
REMARKS :
SCL REF: M 15/1
MECHANICAL
STATION
PLANT ITEM :
SHEET 1 OF 1
ACTIVITY
1.
2.
3.
4.
5.
WITNESSED
NTPC
BHEL
DATE
REMARKS :
SCL REF: M 16/1
MECHANICAL
STATION
SHEET 2 OF 2
PLANT ITEM :
NO.
ACTIVITY
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
WITNESSED
NTPC
BHEL
REMARKS :
SCL REF: M 16/1
DATE
MECHANICAL
STATION
SHEET 2 OF 2
NO.
ACTIVITY
6.
7.
Check the accessibility for hand crank and the switch box
assembly.
8.
9.
10.
11.
Check that the stop nuts are in place on the guide rods.
12.
13.
WITNESSED
NTPC
BHEL
DATE
REMARKS :
SCL REF: M 16/2
MECHANICAL
STATION
SHEET 3 OF 3
NO.
ACTIVITY
14.
15.
16.
WITNESSED
NTPC
BHEL
DATE
REMARKS :
SCL REF: M 16/2
MECHANICAL
STATION
PLANT ITEM :
SHEET 1 OF 2
ACTIVITY
1.
2.
3.
4.
5.
WITNESSED
NTPC
BHEL
DATE
REMARKS :
SCL REF: M 17/1
MECHANICAL
STATION
SHEET 2 OF 2
NO.
ACTIVITY
6.
7.
8.
9.
WITNESSED
NTPC
BHEL
DATE
REMARKS :
SCL REF: MS 17/1
MECHANICAL
STATION
SHEET 1 OF 2
ACTIVITY
1.
2.
3.
4.
5.
WITNESSED
NTPC
BHEL
DATE
REMARKS :
SCL REF: M 17/2
MECHANICAL
STATION
SHEET 2 OF 2
PLANT ITEM :
NO.
ACTIVITY
6.
7.
8.
Ensure that the shock pad face and shaft axis are in the
same vertical plane.
9.
10.
11.
12.
13.
WITNESSED
NTPC
BHEL
REMARKS :
SCL REF: M 17/2
MECHANICAL
DATE
STATION
PLANT ITEM :
SHEET 1 OF 3
CLINKER GRINDER
ACTIVITY
1.
2.
3.
4.
WITNESSED
NTPC
BHEL
DATE
REMARKS :
SCL REF: M 18/1
MECHANICAL
STATION
PLANT ITEM :
NO.
SHEET 2 OF 3
CLINKER GRINDER
ACTIVITY
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
WITNESSED
NTPC
BHEL
REMARKS :
SCL REF: M 15/1
DATE
MECHANICAL
STATION
SHEET 3 OF 3
NO.
ACTIVITY
17.
18.
19.
Short the clinker grinder trial run, continue run for 4 Hrs
and observe:-
WITNESSED
NTPC
BHEL
REMARKS :
SCL REF: M 18/1
DATE
MECHANICAL
STATION
PLANT ITEM :
SHEET 1 OF 3
SCRAPER CONVEYOR
ACTIVITY
1.
2.
3.
4.
5.
WITNESSED
NTPC
BHEL
DATE
REMARKS :
SCL REF: M 18/2
MECHANICAL
STATION
PLANT ITEM :
SHEET 2 OF 3
SCRAPER CONVEYOR
NO.
ACTIVITY
6.
7.
8.
9.
10.
11.
12.
13.
14.
WITNESSED
NTPC
BHEL
REMARKS :
SCL REF: M 18/2
DATE
MECHANICAL
STATION
SHEET 3 OF 3
NO.
ACTIVITY
15.
16.
Start the scraper conveyor trial run and continue the trial
run for 6 hrs. and observe.
WITNESSED
NTPC
BHEL
REMARKS :
SCL REF: M 18/2
DATE
MECHANICAL
STATION
SHEET 1 OF 2
NO.
ACTIVITY
1.
2.
3.
4.
5.
NTPC
BHEL
DATE
of
REMARKS :
SCL REF: M 20/1
MECHANICAL
STATION
PLANT ITEM :
SHEET 2 OF 2
NO.
ACTIVITY
6.
7.
8.
9.
WITNESSED
NTPC
BHEL
REMARKS :
SCL REF: M 20/1
DATE
MECHANICAL
STATION
SHEET 1 OF 3
ACTIVITY
1.
2.
3.
4.
5.
6.
WITNESSED
NTPC
BHEL
DATE
REMARKS :
SCL REF: M 20/1
MECHANICAL
STATION
SHEET 2 OF 3
NO.
ACTIVITY
7.
8.
9.
10.
11.
12.
13.
14.
WITNESSED
NTPC
BHEL
REMARKS :
SCL REF: M 20/2
DATE
MECHANICAL
STATION
SHEET 2 OF 2
NO.
ACTIVITY
15.
16.
17.
WITNESSED
NTPC
BHEL
REMARKS :
SCL REF: M 20/2
DATE
DATE :
APPENDIX NO:
SIMHADRI 2 X 500 MW
TIME
Hrs.
CHRRENT
Amps.
VOLTAGE
Volts.
MOTOR BODY
TEMPERATURE
C deg
MOTOR BEARING
TEMP.
NDE
C deg
DE
C deg
GEARBOX HOUSING
VIBRATION
H
V
Mm
REMARKS
A
Sec
STARTING TIME:
STARTING CURRENT :
SIGNATURE :
OPERATOR :
COMMISSIONING IN CHARGE (NTPC) :
COMMISSIONING IN CHARGE ( CONTRACTOR) :
DATE :
APPENDIX NO:
SIMHADRI 2 X 500 MW
TIME
Hrs.
CHRRENT
Amps.
VOLTAGE
Volts.
MOTOR BODY
TEMPERATURE
C deg
MOTOR BEARING
TEMP.
NDE
C deg
DE
C deg
GEARBOX HOUSING
VIBRATION
H
V
Mm
REMARKS
A
Sec
STARTING TIME:
STARTING CURRENT :
SIGNATURE :
OPERATOR :
COMMISSIONING IN CHARGE (NTPC) :