SCAFFOLDING Method Statement Fv2
SCAFFOLDING Method Statement Fv2
Example
Misc
Site
Verbal
Design Ref: -
n/a
Date: 08/04/2014
Prepared by: - A S Martin
Page No
Page 1 of 4
Issue No: 1
y
l
on
e
c
n
e
r
e
f
e
1.2 k/n
Section 4 - Supervision
Supervisor : -
r
o
A S Martin
Contact No :
T
O
o
C
y
p
07818425773
o
D
Method Statement
Customer: Site: Work Area: Quote No: -
Example
Misc
Site
Verbal
Design Ref: -
n/a
Date: 08/04/2014
Prepared by: - A S Martin
Page No
Page 2 of 4
Issue No: 1
y
l
on
e
c
n
e
r
e
a. Work area to be segregated by physical barriers, warning signs will be displayed at prominent locations.
f
e
The following PPE will be worn during our activities: a. Safety Helmet
b. Safety Boots
c. Safety Harness
d. Overalls
e. Hi-visibility Vest
f. Gloves
g. Eye Protection
r
o
T
O
y
p
o
C
All our materials will be removed from site on completion of our works and recycled.
Scaffold boards will be FSC or PEFC certified, other timber will be certified subject to specific contract conditions.
Packaging materials will be segregated into the appropriate onsite disposal bins or be removed from site.
Noise, may be an issue if work is outside of the agreed site working hours.
Where plant or equipment is serviced or fuelled on site, COSHH assessments will be available for the substances in
use.
f. Plant refueling will be undertaken in agreed areas, spill kits will be available.
g. No other substances that are subject to the COSHH regulations will be used on site.
o
D
We will comply with the site emergency procedures as detailed in site induction/health and safety plan.
In the event of fall involving a safety harness, refer to the fall recovery plan accompanying this document.
The Customer will provide first aid personnel and facilities on site.
Operatives will carry a basic travelling first aid kit in their vans.
Operatives will initially report any incident/accident to their immediate Supervisor.
Method Statement
Customer: Site: Work Area: Quote No: -
Example
Misc
Site
Verbal
Design Ref: -
n/a
Date: 08/04/2014
Prepared by: - A S Martin
Page No
Page 3 of 4
Issue No: 1
y
l
e
c
on
n
e
r
e
f
e
y
p
o
C
a. Following the completion of the scaffold the Scaffold Inspector will carry out a visual inspection to ensure that the
scaffold complies with the specification.
b. On satisfactory completion the Scaffold Inspector will complete a handover certificate for acceptance by the client /
hirer.
r
o
T
O
a. It is the client / hirers responsibility to ensure that on a weekly basis that a Scaffold Inspector will inspect the scaffold
in accordance with the requirements of The Working at Height Regulations 2005 and record the findings on the
schedule 7 inspection record and if applicable on the scaffold inspection tag.
o
D
a. The location where the scaffold is to be dismantled, the method statement and risk assessment will be shown to the
operatives by supervision and the relevant hazards and preventive/control measures will be explained.
b. The operatives will sign the method statement to confirm the adequate transfer of information to enable them to
work safely.
c. The Chargehand will initially inspect the scaffold to ensure that ties and braces are still intact and that platforms are
clear of debris.
d. Once satisfied that the scaffold is safe to dismantle the work area by will be segregated by the specified means and an
incomplete scaffold sign or similar will be displayed on the scaffold adjacent to the means of access which will be
restricted by physical barriers
e. Ties and braces will not be removed from below the lift being dismantled.
f. The scaffold will then be dismantled methodically.
g. Scaffolders and Supervision will ensure that the structure remains stable and that it does not become overloaded
with dismantled materials.
h. No materials will be bombed, all fittings will be bagged or passed by hand to ground level.
Ref. Feb 2013 (a)
Method Statement
Customer: Site: Work Area: Quote No: -
Example
Misc
Site
Verbal
Design Ref: -
n/a
Date: 08/04/2014
Prepared by: - A S Martin
Page No
Page 4 of 4
Issue No: 1
i. In general scaffolds will be dismantled in the reverse order to the erection procedure.
j. On completion all materials will be cleared from the work area and stored in an agreed position or removed from site.
k. A final visual check will be made by the Charge hand prior to leaving site.
Section 18 Acknowledgement
I confirm my understanding of the contents of this document and that I will work in accordance them: Name
Date
Signed
Name
Date
J Strange
03/01/2013
G Ford
03/01/2013
J Evans
03/01/2013
J Kilford
03/01/2013
R Smyth
03/01/2013
y
l
e
c
on
n
e
r
e
f
e
r
o
T
O
o
D
Signed
o
C
y
p