PC
MONG DUONG II 2 X 560MW (NET) COAL FIRED POWER PROJECT
Title :
T10206-QE01-POZEN__-040215 INSPECTION
AND TEST PLAN FOR JUNCTION BOX & LOCAL
PANEL
INSTALLATION
Drawing No. :
T10206-QE01-P0ZEN-040215
Page 1
T10206
UAS :
QE01
Unit :
PO
KKS :
ZEN
A
1 of 4
Doc. No.
T10206-QE01-POZEN-040215
Rev. A
Contractor
DOOSAN
2 of 4
AES-VCM
Detailed Legend
Surveillance Point / DOOSAN / Subcontractor does not send a notification to AES-VCM Mong Duong
except for the first or last operation on the basis of each process. AES-VCM Mong Duong
could check the operation, if he is present at the site during the inspection by Doosan.
Witness Point / DOOSAN / Subcontractor shall submit request for inspection to AES-VCM to
decide whether they will attend such inspection or not.
Hold Point / Downstream construction and other activities shall not proceed
without attendance or any written approval of AES-VCM Mong Duong.
NOTE : The Site ITP and all of the abovementioned reports will be kept available by
DOOSAN at anytime for control and or review by AES-VCM Mong Duong.
Page 2
Item Name
A.Material
Receipt
Oper. No.
A1
A2
B.
Junction
Box &
Local
Panel
Installation
Inspection Process
Check and verify Junction Box & Local Panel with
associated equipment against manufacturer's
drawing & packing list is correct.
Check the physical condition sizes and types of
panels, system cabinets and junction box.
AES-VCM
Rev. A
Contractor
DOOSAN
Page 3 of 4
Remarks
(Allowable tolerance)
Packing List
N/A
Packing List
N/A
AES-VCM
A
Sign
Packing List
Packing List
T10206-XW01-POZEN-150001
B2
T10206-XW01-POZEN-150001
B3
T10206-XW01-POZEN-150001
T10206
XW01 POZEN 150001
B4
T10206-XW01-POZEN-150001
B5
T10206-XW01-POZEN-150001
B6
T10206-XW01-POZEN-150001
B7
T10206-XW01-POZEN-150001
B8
T10206-XW01-POZEN-150001
W: Witness Inspection
T10206-QE01-POZEN-040215
Subcon DOOSAN
A Sign A Sign
B1
R: Report Review
Doc. No.
Abbreviation :
S: Surveillance
H: Hold Inspection
Note :
All inspection shall be performed in accordance with the approved Site Inspection and Test Plans/Project Specifications
page3
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
AES-VCM
Inspection Report for Junction Box & Local Panel Check List
RFI NO
Drawing No
Date :
Specific Location :
CHECK ITEM
No
Inspection elements
Yes
No
N/A
Observed Result
/ Remarks
Checked by :
Subcontractor
Verified/Approved By:
DOOSAN Const'n Dept.
Page 4
AES-VCM