Fabrication
Quality Assurance/Quality Control Plan
[ProjectName]
[ProjectNumber]
ed
Version: 20150308
le
Se
20150308
ct
Version
Version notes
Initial issue
Approved
_____________________________________________________
[QualityManagerName], Quality Manager
Pa
ge
ed
ct
le
Se
Page 2
Standards ensure that results are specified rather than left to discretionary practices.
Pa
ge
All [CompanyName] fabrication activities comply with generally accepted good workmanship practices
and industry standards.
ed
Codes that may apply to this project include those listed below.
ct
Reference Standard
No.
Description
AISI SG02-KIT
CFSEI
NFPA 211
SDI DDP
Welding standards
AWS B2.1/B2.1M
Se
le
Division
Page 21
ANSI/AWS A2.4
Symbols
Standard terms
ANSI/AWS A3.0
QA recommended practices
Coating of steel
Coating of steel
AWS D1.1/D1.1M
Pa
ge
ed
Welding procedures shall be qualified and approved, in accordance with the applicable AWS Welding
Code(s) or Specification(s) (i.e., D1.1., D1.5) or AWS B2.1, Specification for Welding Procedure and
Performance Qualification.
The welding procedure must identify the filler material.
Se
le
ct
When the governing AWS Welding Code(s) mandates that welding procedures be qualified by test, the
Welding Fabricator shall have PQRs that support the applicable WPSs. When prequalified WPSs or
Standard Welding Procedure Specifications (SWPSs) published by the AWS are permitted, PQRs are not
required.
The Quality Manager or Certified Welding Inspector (CWI) reviews and approves the welding procedure
before being used in production welding operations.
The WPSs and PQRs are controlled by the Quality Manager according by the document and record control
procedures specified in the relevant section of this Quality Manual.
The applicable WPSs shall be available to welders or welding operators during testing and production
welding.
Page 22
Se
le
ct
ed
Pa
ge
Page 23
Se
le
ct
ed
Pa
ge
http://www.aws.org/technical/forms/N-1.pdf
Page 24
Se
le
ct
ed
Pa
ge
http://www.aws.org/technical/forms/N-3.pdf
Page 25
Se
le
ct
ed
Pa
ge
http://www.aws.org/technical/forms/N-4.pdf
Page 26
Se
le
ct
ed
Pa
ge
http://www.aws.org/technical/forms/N-9.pdf
Page 27
H. MATERIAL TRACEABILITY
Products and materials are controlled to assure the use of only correct and acceptable items. Controls
include identification of the inspection status. Materials that require lot control traceability and the
method of traceability are listed on the Controlled Materials form included as an exhibit in this
subsection.
Pa
ge
When lot controlled materials are received, the Superintendent verifies that materials have the specified
lot identifications.
The Superintendent maintains lot identification at all production phases from receipt, through production,
installation, or assembly, to final completion. Acceptable methods for preserving lot identification include
physically preserving observable lot identifications, recording the lot identification on a work task quality
inspection form or other work record, or collecting the physical lot identifier as a record along with
supplemented with location.
Se
le
ct
ed
If lot controlled materials are without lot identification, the Superintendent deems the materials as
nonconforming and segregates them and/or clearly marks them to prevent inadvertent use. The
Superintendent treats the material according to the company policy for nonconformances. Only the
Quality Manager can re-identify or re-certify the materials.
Page 28
[CompanyName]
Controlled Materials Form
Version 20150308
Date
Lot Traceability
Requirements
Pa
ge
Intended Use
(if description is necessary)
[ProjectName]
ed
Material
ct
Preparer
le
[ProjectNumber]
Contract Name
Se
Contract ID
Page 29
[CompanyName]
Material Inspection and Receiving Report
Version 20150308
[ProjectNumber]
[ProjectName]
Stock/Part
No.
Supplier
Quantity
Received
Description
Condition
Marking
ed
Item No.
Contract Name
Pa
ge
Contract ID
le
ACCEPTANCE
ct
Se
Page 30
Accept
Conditional
Use
Date
Reject
Pa
ge
ed
le
ct
410-451-8006
Se
www.FirstTimeQuality.com