Installation & Intial Line Up
Installation & Intial Line Up
ROI-S05750-058E
September, 2006
PASOLINK NEO
6-52 GHz PDH/SDH DIGITAL RADIO SYSTEM
PAGE
GENERAL 1-1
INSTALLATION 2-1
2.1
Packages 2-2
2.2
2.3
2.4
2.5
2.6
2.6.1
Mounting 2-23
2.7
2.8
2.9
2.10
2.11
3.1
Start-up 3-2
3.2
Shut-down 3-8
3.3
3.3.1
3.3.2
3.3.3
3.4
3.5
CL-1
Submission Prohibited
NEC Internal Use Only
CONTENTS
ROI-S05750
CL-2
2 pages
Submission Prohibited
NEC Internal Use Only
GENERAL
ROI-S05750
1. GENERAL
This section provides installation and initial line up information on the
PASOLINK NEO used for 6-52 GHz PDH/SDH microwave radio system.
1-1
Submission Prohibited
NEC Internal Use Only
GENERAL
ROI-S05750
1-2
2 pages
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
2. INSTALLATION
The standard installation is summarized in this section. Included herein is
information on typical installation work flow and guides for IDU
installation, ODU installation, Antenna (ANT) installation, waveguide
connection and coaxial cable connections. The installation flow diagram
is shown below.
This product is a part of radio link system, and is intended to be connected
with a external antenna.
This product will be installed and operated by professional.
After installation, the professional person shall make sure that the system
shall comply with the relevant limits for general public exposure specified
as basic restrictions or reference levels in the council Recommendation
1999/519/EC.
Unpacking of IDU
(see para 2.2)
Unpacking of ODU
(see para 2.2)
IDU Mounting
(see para 2.3)
ODU Mounting
(see para 2.6)
Feeder Connection
(see para 2.7)
Cable Termination
(see para 2.10)
Frame Grounding
(see para 2.8)
Waterproof
Protection
(see para 2.9)
Fig. 2-1 Typical Installation Flow Diagram
2-1
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
2.1 Packages
Each unpacked component of the [ ] GHz [ ] MB digital radio system
must be checked as shown below.
CONTENS LIST
2-2
DRAWING NO.
Fig. 2-2
Mounting Bracket
Fig. 2-3
Installation Kit
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
4
(*1)
5
RX LEV
MON
IFL
FG
! IF IN/OUT
XPIC CTRL
TX
RX
XPIC
RESET
PWR
ODU
MD/
CBL SELV
G PULL
ALM
PWR
2M IN/OUT-B
2M IN/OUT-A
PORT 1
PORT 2
(*1)
PROTECT
LCT
No.
NMS
NE
AUX/ALM
PASOLINK NEO
MAINT
MEMORY
IDU
SC IN/OUT
EOW
CALL
MMC
DESCRIPTION
MDP-150MB-1AA (IDU)
Note: *1
*2
100M
100M
One more ODU and MODEM module are provided for HS/Twinpath configuration.
One spare fuse is provided in the MODEM module.
Fig. 2-2 Contents of Basic Unit Package
2-3
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
2M IN/OUT-A
2M IN/OUT-A
2M IN/OUT-A
2M IN/OUT-B
H3009A I/O BOARD
SER No.
DATE
WEIGHT kg
MADE IN JAPAN
2M IN/OUT-B
H3009A I/O BOARD
SER No.
DATE
WEIGHT kg
MADE IN JAPAN
2M IN/OUT-B
H3009A I/O BOARD
SER No.
DATE
WEIGHT kg
MADE IN JAPAN
43V
STD
G
OUT
PWR
ALM
No.
SELV
FUSE (250V/8AH)
43V
PULL
PWR
STD
G
OUT
FUSE (250V/8AH)
DESCRIPTION
2-4
PWR
ALM
SELV
PULL
PWR
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
No.
DESCRIPTION
Pole Mounting Bracket for Coaxial Cable Connection Type (6/7/8 GHz)
2-5
Submission Prohibited
NEC Internal Use Only
16E1 INTFC
ALM
2M IN/OUT-B
2M IN/OUT-A
PORT 1
100M
PORT 2
MODULAR CONNECTOR/(MALE)
MODULAR CONNECTOR/(MALE)
MDR CONNECTOR/(MALE)
MDR CONNECTOR/(MALE)
RX LEV
MON
IFL
100M
INSTALLATION
2-6
D-SUB CONNECTOR/(MALE)
D-SUB CONNECTOR/(MALE)
No.1 ODU
FG
48E1 INTFC
ALM
2M IN/OUT-B
2M IN/OUT-A
LUG
2M IN/OUT-C
MDR CONNECTOR/(MALE)
IEC 169-13 (P) CONNECTOR
IEC 169-13 (P) CONNECTOR
N-P CONNECTOR
(MALE)
STM-1 INTFC
(150M)
LC (P) CONNECTOR
LC (P) CONNECTOR
ALM
STM-1 IN
STM-1 OUT
STM-1 INTFC
(OPT)
ALM
STM-1 OUT
STM-1 IN
D-SUB CONNECTOR/
(MALE)
ONLINE
LUG
! IF IN/OUT
XPIC CTRL
TX
RX
XPIC
RESET
PWR
ODU
MD/
CBL SELV
PULL
PWR
G
ALM
WS IN/OUT
PROTECT
PASOLINK NEO
MAINT
MEMORY
IDU
(BLANK)
LCT
IDU
NMS
NE
AUX/ALM
SC IN/OUT
EOW
CALL
MMC
D-SUB CONNECTOR/(MALE)
D-SUB CONNECTOR/(MALE)
MODULAR CONNECTOR/(MALE)
MODULAR CONNECTOR/(MALE)
USB CONNECTOR/(MALE)
Fig. 2-5 Installation Kit Packing List of IDU and ODU for 1+0 System
ROI-S05750
Note: It is recommended that TNC (Male) L-angle connector for the 8D-FB IF
cable is used to connect it to the IDU. When the N (Male) straight
connector is attached to the 5D-FB or 10D-FB IF cable, use of the TNC
(Male) - N (Female) (NJ-TNCP-LA) L-angle adapter is needed.
Submission Prohibited
NEC Internal Use Only
16E1 INTFC
ALM
2M IN/OUT-B
2M IN/OUT-A
PORT 1
100M
PORT 2
MODULAR CONNECTOR/(MALE)
MODULAR CONNECTOR/(MALE)
MDR CONNECTOR/(MALE)
MDR CONNECTOR/(MALE)
RX LEV
MON
IFL
100M
ROI-S05750
D-SUB CONNECTOR/(MALE)
D-SUB CONNECTOR/(MALE)
No.1 ODU
FG
48E1 INTFC
ALM
2M IN/OUT-B
2M IN/OUT-A
LUG
2M IN/OUT-C
MDR CONNECTOR/(MALE)
IEC 169-13 (P) CONNECTOR
IEC 169-13 (P) CONNECTOR
N-P CONNECTOR
(MALE)
TCN-P CONNECTOR (MALE)
STM-1 INTFC
(150M)
LC (P) CONNECTOR
LC (P) CONNECTOR
ALM
STM-1 IN
STM-1 OUT
STM-1 INTFC
(OPT)
LUG
! IF IN/OUT
TX
RX
XPIC
RESET
PWR
ODU
MD/
CBL SELV
XPIC CTRL
TX
RX
XPIC
RESET
PWR
ODU
MD/
CBL SELV
STM-1 IN
ONLINE
LAN/WS INTFC
(SDH)
ALM
WS IN/OUT
G PULL
PWR
XPIC CTRL
D-SUB CONNECTOR/
(MALE)
ALM
STM-1 OUT
! IF IN/OUT
LUG
PROTECT
PULL
PWR
LCT
NE
AUX/ALM
PASOLINK NEO
MAINT
MEMORY
IDU
SC IN/OUT
EOW
CALL
MMC
D-SUB CONNECTOR/(MALE)
D-SUB CONNECTOR/(MALE)
MODULAR CONNECTOR/(MALE)
MODULAR CONNECTOR/(MALE)
USB CONNECTOR/(MALE)
D-SUB
Accessory cable
TCN-P
CONNECTOR (MALE)
NMS
IFL
FG
IDU
LUG
2-7
Fig. 2-6 Installation Kit Packing List of IDU and ODU for 1+1 System
INSTALLATION
Note: It is recommended that TNC (Male) L-angle connector for the 8D-FB IF
cable is used to connect it to the IDU. When the N (Male) straight
connector is attached to the 5D-FB or 10D-FB IF cable, use of the TNC
(Male) - N (Female) (NJ-TNCP-LA) L-angle adapter is needed.
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
43V
! IF IN/OUT
XPIC CTRL
TX
RX
XPIC
RESET
PWR
ODU
MD/
CBL SELV
ALM
FUSE (250V/8AH)
43V
PULL
SELV
PWR
STM-1 IN
STM-1 OUT
G
OUT
STD
PWR
ALM
SELV
FUSE (250V/8AH)
PULL
PWR
G PULL
ALM
ALM
PWR
STM-1 IN
STM-1 OUT
G
PWR
G
OUT
STD
! IF IN/OUT
XPIC CTRL
TX
RX
XPIC
RESET
PWR
ODU
MD/
CBL SELV
G PULL
PASOLINK NEO
PROTECT
PWR
LCT
NMS
AUX/ALM
NE
MAINT
MEMORY
IDU
SC IN/OUT
EOW
CALL
MMC
RESERVE
HOT SURFACE
Avoid contact.
! CAUTION
RESERVE
No.
DESCRIPTION
Note: *1
*2
One more ODU and MODEM module are provided for HS/Twinpath configuration.
Two spare fuses are provided in the DC-DC CONV module.
Fig. 2-7 Installation Kit Packing List of DC-DC CONV UNIT for 1+1 System
2-8
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
Chart 2-1
ODU :
Chart 2-2
Note: When conveying the IDU or ODU to another place, the original
packing should be used to avoid damage.
Chart 2-1 Unpacking Method for IDU
Step
Procedure
Cut the p.p. tape at top of the carton (1 to 3). Then open the
carton,
2-9
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
Procedure
CUSHIONING
MATERIAL
CARTON
(ACCESSORIES)
CARTON
(IDU)
CUSHIONING
MATERIAL
(IDU)
2-10
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
Procedure
Take out the IDU wrapped with antistatic bag from the carton,
ANTISTATIC BAG
IDU
CARTON (IDU)
2-11
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
Procedure
Take off the hook of a cover as shown below. Then, open the
top cover,
HOOK
2-12
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
Procedure
TOP PAD
POLY SHEET
ODU
2-13
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
Procedure
FRONT
POSITION
CENTER
POSITION
SIDE VIEW
1+0/1+1 SYSTEM
2-14
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
Procedure
SPRING WASHER
SCREW
FLAT WASHER
SPRING WASHER
SCREW
FLAT WASHER
Fix each side of the IDU to the 19-inch rack with the two
screws,
IDU
2-15
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
At least
one rack unit *
Procedure
To mount the IDU in a 19-inch rack, take a space more than 200
mm to the rear section and space for one unit to the top and
bottom.
More than
200 mm *
At least
one rack unit *
WALL
Note: * Normal setting for free space. When free space is closed within
one rack unit, keep the environment temperature is lower than
+40C.
2-16
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
Procedure
2M IN/OUT-A
2M IN/OUT-A
2M IN/OUT-A
2M IN/OUT-B
H3009A I/O BOARD
SER No.
DATE
WEIGHT kg
MADE IN JAPAN
2M IN/OUT-B
H3009A I/O BOARD
SER No.
DATE
WEIGHT kg
MADE IN JAPAN
2M IN/OUT-B
H3009A I/O BOARD
SER No.
DATE
WEIGHT kg
MADE IN JAPAN
! IF IN/OUT
XPIC CTRL
TX
RX
XPIC
RESET
PWR
ODU
MD/
CBL SELV
! IF IN/OUT
PULL
ALM
2M IN/OUT-B
2M IN/OUT-A
PWR
2M IN/OUT-C
G
XPIC CTRL
TX
RX
XPIC
RESET
PWR
ODU
MD/
CBL SELV
PROTECT
PULL
PWR
LCT
NMS
NE
AUX/ALM
PASOLINK NEO
MAINT
MEMORY
IDU
SC IN/OUT
EOW
CALL
MMC
CPBMS2.663GF
Align the I/O BOARD bracket to the upper position of the IDU
on the 19-inch rack,
2-17
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
Procedure
RACK
SPRING WASHER
IDU
SCREW
FLAT WASHER
SPRING WASHER
SCREW
FLAT WASHER
Note: Contact NEC for the optional mounting bracket for the I/O BOARD when the IDU is fixed
to the rack in centre side.
5
Put the I/O BOARD to the I/O BOARD Bracket so that the
gasket fits to between the I/O BOARD Bracket and the
connector,
! IF IN/OUT
XPIC CTRL
TX
RX
XPIC
RESET
PWR
ODU
MD/
CBL SELV
! IF IN/OUT
PULL
ALM
2M IN/OUT-B
2M IN/OUT-A
PWR
2M IN/OUT-C
G
XPIC CTRL
TX
RX
XPIC
RESET
PWR
ODU
MD/
CBL SELV
PROTECT
PULL
PWR
PASOLINK NEO
LCT
NMS
NE
MAINT
MEMORY
IDU
AUX/ALM
SC IN/OUT
EOW
CALL
MMC
I/O BOARD
IDU
I/O BOARD
GASCKET
GASCKET
CONECTOR
2-18
CONECTOR
RACK
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
Procedure
2M IN/OUT-A
! IF IN/OUT
XPIC CTRL
PWR
ODU
MD/
CBL SELV
XPIC CTRL
TX
RX
XPIC
RESET
PWR
ODU
MD/
CBL SELV
2M IN/OUT-A
2M IN/OUT-B
H3009A I/O BOARD
SER No.
DATE
WEIGHT kg
MADE
JAPAN
2M IN
IN/OUT-A
G PULL
PWR
2M IN/OUT-A
2M IN/OUT-B
2M IN/OUT-B
H3009A I/O BOARD
SER No.
DATE
WEIGHT kg
2M IN/OUT-C
MADE IN JAPAN
ALM
G
TX
RX
XPIC
RESET
! IF IN/OUT
G PULL
PWR
IDU
I/O BOARD BRACKET
PROTECT
LCT
NMS
NE
AUX/ALM
PASOLINK NEO
MAINT
MEMORY
IDU
SC IN/OUT
EOW
CALL
MMC
10
11
12
2-19
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
Procedure
Fix the DC-DC CONV UNIT to the 19-inch rack using the two
screws.
DC-DC CONV UNIT
SPRING
WASHER
RACK
SCREW
FLAT
WASHER
SPRING
WASHER
IDU
FLAT
WASHER
SCREW
Note: * Space 0.5 rack unit in the upper or lower DC-DC CONV
UNIT.
upper
screw hole
RACK
At least
0.5 rack unit *
IDU
lower
screw hole
2-20
DC-DC
CONV
UNIT
DC-DC
CONV
UNIT
2U
2U
0.5U
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
SYSTEM
1+0
1+1
ATTACHENENT
POSITION OF
O-RING (BETWEEN:)
O-RING
REMARKS
SMALL SIZE
LARGE SIZE
ANT ODU
Not used
Used
ANT WG/ODU
(18-38 GHz BAND)
Used
Not used
Waveguide connection
ANT HYB
Not used
Used
ANT WG/HYB
(18-38 GHz BAND)
Used
Not used
Waveguide connection
Note: 11/13/15 GHz antenna for direct mount is not possible to connect
the ordinary waveguide flanges.
2-21
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
POSITION
OF LARGE
SIZE O-RING
POSITION
OF SMALL
SIZE O-RING
POSITION
OF SMALL
SIZE O-RING
35
4 mm
4 mm
4 mm
40
32
m
m
m
m
m
m
10
.8
1.8 mm
15
1.8 mm
.6
m
2-22
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
2.6.1 Mounting
The method of mounting is listed in Table 2-2 to Table 2-4.
Table 2-2 Antenna Direct Mounting
Change of Polarization
Chart 2-6
ANT/ODU/HYB/TX SPAN ATT
ODU/
Bracket
HYB
TX SPAN
ATT
OMT
Chart 2-7
Chart 2-8
Chart 2-9
Chart 2-11
Chart 2-10
Chart 2-12
Chart 2-13
2-23
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
Procedure
CHANGE OF POLARIZATION
ODU DIRECT MOUNTING TYPE ANTENNA
(Example (ANDREW) 1/2)
Note:
Note:
Transition hub
2 SCREWS
2 SCREWS
2-24
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
Procedure
Note: Do not remove the screw complete from the screw hole.
Hold the feed horn with hand.
Top
Polarization
V
Polarization
H
2-25
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
Procedure
CHANGE OF POLARIZATION
ODU DIRECT MOUNTING TYPE ANTENNA
(Example (ANDREW) 2/2)
Note:
Note:
1.
2.
Loosen six screws with Allen wrench until transition can rotate
freely,
Note: Do not remove the screw complete from the screw hole.
Note: Because of the screwtight is applied, the strength to
loosen screw is necessary.
3
2-26
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
Procedure
Transition hub
Transition hub
Transition Hub
Timing Pin
Vertical Polarized Application
2-27
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
Procedure
CHANGE OF POLARIZATION
ODU DIRECT MOUNTING TYPE ANTENNA
(Example (RFS))
Note:
Note:
Drain Plug
RFS C-Mount
RFS SB1
1.
2.
3.
4.
1.
2.
3.
4.
4 screws (M3)
Polarization V
2-28
Polarization H
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
Procedure
1Note:
There are two types NEC HYBRID. One uses two pieces
transition hubs and another uses one piece.
GUIDE PIN
Cross-Recessed
Head Machine Screw
M2.6 (2ea)
TRANSITION
HUB
V POLARIZATION
H POLARIZATION
HYB
V POLARIZATION
Cross-Recessed
Head Machine Screw
M2.6(2ea)
V POLARIZATION
H POLARIZATION
Then fix it with the two screws that were loosened in step 1.
2-29
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
Procedure
Quasar HYBRID
Note: The hybrid is set to V-polarization when shipped from the factory.
1
Quasar HYB
GUIDE PIN
HYB
SCREW
ANTENNA
CONNECTION UNIT
V POLARIZAION
V POLARIZATION
H POLARIZATION
2-30
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
Procedure
TX ATT
ANTENNA
CONNECTION UNIT
V POLARIZATION
2
Cross-Recessed
Head Machine Screw
M2.6(2ea)
Plate-1
Plate-2
V POLARIZATION
H POLARIZATION
2-31
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
3
Step
Procedure
GUIDE PIN
2.
3.
4.
UP
UP
RX LEV
MON
IFL
RX LEV
MON
IFL
FG
FG
V POLARIZATION
H POLARIZATION
10-38 GHz ODU
V/H Polarization Conversion
2-32
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
Procedure
INSTALLATION OF BRACKET
1
WASHER
PROTECTIVE
CAP
LOCK WASHER
LOCK WASHER
NUT*
WASHER
NUT*
Three(3) screws*
(Apply screwtight to threads
before fitting to antenna)
Three(3) screws*
(Apply screwtight to threads
before fitting to antenna)
*
2-33
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
Procedure
2-34
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
Procedure
Note: The values in the following table are valid for screws and bolts which have been greased
according to the installation instructions.
Torques for RFS
Bolt
Hexagonal socket stainless steel screws (Feed systems install on aluminium mounting plate)
Exceptions
Fixing screw of the azimuth fine adjustment spindle
Special application: NOT greased
Fixing screw of the plastic radome
M5
M6
M8
M10
M12
M10
M8
M10
M12
M3
M4
5
8
17
35
50
20
5
10
17
0.2
0.4
M8 x 30
M12 x 55
8 Nm
17 Nm
B4.2
Nm
Nm
Nm
Nm
Nm
Nm
Nm
Nm
Nm
Nm
Nm
3 Nm
2-35
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
Procedure
2-36
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
2-37
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
Procedure
O-RING
ODU
O-RING
ODU
2-38
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
ODU
O-RING
O Ring
2-39
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
Procedure
4.
GUIDE PIN
ODU FLANGE
ANTENNA FLANGE
ANTENNA
5.
SCREWS
2-40
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
No.1 ODU
POLE
ODU
POLE
MEMBER OF TOWER
(S)
No.2 ODU
MEMBER OF TOWER
1+0 System
POLE
1+1 SD System
2-41
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
Procedure
MOUNTING
Note:
O-RING
2-42
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
Procedure
MOUNTING
HOLE FOR HYB
MOUNTING HOLE
FOR HYB
2-43
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
Procedure
Fix the bracket and handle to the HYB used for 11-52 GHz
ODU.
FLAT WASHER
GUIDE PIN
M6 SCREW
HYB
ANT
MOVE THE
SHORT PLATE
O-ring
SHORT PLATE
O-ring
ODU PORT
2-44
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
Procedure
Install the two ODUs with hex screws (four locations) using the
Allen key wrench.
ODU
O-ring
ODU
O-ring
ODU
2-45
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
Procedure
DEMOUNTING
FROM HYB
1
Remove the four (or six) fixed bolts from the ODU.
Note: When demounting the ODU from HYB, mount the attached
SHORT PLATE to the demounted port of the HYB to avoid RF
power leaking from the hybrid and for waterproofing.
MOUNTING HOLE
FOR SHORT
PLATE
SHORT
PLATE
MOUNTING SHORT
PLATE TO THE ODU
PORT
2-46
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
Procedure
MOUNTING
TX SPAN ATT
Step
Procedure
TX ATT
Antenna Connection Unit
Installation to antenna
Flat Washer M6 (4ea)
Guide Pin
Antenna
Tighten the each
screw equally and
carefully by wrench
at diagonal position.
TX ATT
Packing (Supplied by Antenna)
3
Note; Tightening torque (M6) is 4.0 Nm 10%.
38 GHz Band ODU Mounting Using NEC TX SPAN ATT (1/2)
2-47
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
Procedure
Fix the ODU with hex screws (four locations) using the Allen
key wrench.
Attachment of ODU
ODU should be attached
by turning V up.
Hexagon Socket
Head Cap Screw M6
(Supplied by NEC with ODU)
NEC ODU
O-Ring
TX ATT
(Packing)
TOP VIEW
TOP
O-Ring
(Packing)
Antenna
TX ATT
ODU
2-48
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
Procedure
No.
Parts Name
Qty
Bracket
Handle
14
2-49
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
No.
Procedure
Qty
Mount Arm
Mount Holder
Truss
M12 200 Hexagon Head Screw with Nut (2), Flat Washer (2)(ST)
M6 25 Hexagon Head Screw with Nut (x1), Flat Washer (2), Spring Washer (SS)
Truss
Mount Arm
Mount Holder
2-50
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
Procedure
Screw the Mount Arm and the Truss with the M6 25 Screw,
Flat Washer (2), Spring Washer (1), Nut, at four positions,
Tightening Torque
M6
4.0 Nm 10%
M12
47
Nm 10%
Truss
Mount Arm
Nut
M6 x 25 Screw
Spring Washer
Flat Washer
Flat Washer
Mount Arm
Mount Arm
Truss
Ab.144.3 mm
Truss
2-51
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
Procedure
Mounting Pipe
Mounting Pipe
2-52
Fit the guide pin of the HYB to the Guide Pin Hole of the Mount
Arm,
Install the HYB onto the bracket with the M6 35 Screw, Flat
Washer (2), Nut (2), at four positions,
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
Flat Washer
Procedure
Flat Washer
Nut
Nut
Guide Pin
M6x35 Screw
HYB
ODU Port
Short Plate
Short Plate
ODU Port
Note: When either Main or Standby ODU is removed, attach the short plate over
the ODU port. Tightening torque is 3.0 Nm 10%.
HYB
Flat Washer
M6 x 35 Screw
Nut
Nut
Mount Arm
Flat Washer
HYB
HYB Top
M6x35 Screw,
Nut x 2
Flat Washer x 2
2-53
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
Procedure
Install the HYB to the mounting pole using the M12 200
Screw, Flat Washer, Nut,
Mounting Pole
Nut
Nut
Flat Washer
Mount Holder
Nut
Nut
Flat Washer
HYB
Mount Holder
Mount Holder
Flat Washer
Mounting Pole
Pole Diameter
: 50 to 115mm
Mount Holder
M12x200 Screw,
Nut x 2
Flat Washer x 2
2-54
M12x200 Screw,
Nut x 2
Flat Washer x 2
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
Procedure
HYB
2-55
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
10
Procedure
Mark V to Top
Guide Pin
O-ring
(Top View)
Note: The ODU should be attached by turning the plate marked V up position
for both Main ODU and Standby ODU.
O-ring
Guide Pin
Mark V to Top
Standby ODU
2-56
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
11
Procedure
Connect the flexible waveguide (WG) to the ODU and fix the
waveguide to the ODU with four (4) bolts.
Note: Before connecting the WG to the antenna, confirm which
polarization is applied to the Master and Slave ODU.
Main ODU
Mounting Pole
HYB
Standby ODU
HYB
WG Port
WG
O-ring
2-57
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
Procedure
This section explains the installation of the OMT for XPIC system.
There are two types of O-rings for antenna mounting to the OMT
depending on the frequency band.
Caution : Do not apply silicon grease to O-ring.
POSITION OF LARGE
SIZE O-RING
POSITION OF LARGE
SIZE O-RING
ANDREW ANTENNA
RFS ANTENNA
m
m
4 mm
4 mm
4 mm
35
32
m
40
m
.8
10
1.8 mm
15
.
1.8 mm
6m
m
m
2-58
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
Procedure
For the antenna direct mounting of the ODU, following OMT is used in
the XPIC system.
FREQUENCY
BAND
FREQUENCY
RANGE (GHz)
OMT
CODE No.
INTERFACE WG
INNER DIA.(mm)
(ANT Side)
INTERFACE
(ODU Side)
11G
G9380A
18.0
R100
13G
G9381A
15.0
R140
15G
G9382A
13.5
R140
18G
G9383A
10.5
R220
23G
G9384A
9.0
R220
26G
G9385A
8.0
R260
32G
G9387A
6.5
R320
38G
37 39.5 GHz
G9388A
5.5
R320
Caution : For connecting the OMT to the antenna, the circular type
waveguide flange of the antenna is applied to the XPIC
system. When the V/H flange is mounted to the antenna, it
must be changed to a circular type.
Caution : When mounting the ODU to the OMT, confirm the
polarization for Main Master and SUB Master ODU. The
installation of the corresponding ODUs in the opposite
station must have the same polarization in order to make
into line Main Master and SUB Master MODEMs.
2-59
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
Procedure
GUIDE PIN
FLAT WASHER M6
M6 SCREW
MOVE THE
SHORT PLATE
ANT
SCREW
O-ring
SHORT PLATE
2-60
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
Procedure
Loosen the two screws and move the short plate if it is fixed to
the ODU port. (see figure in step 9),
Insert the guide pin removed in step 4 behind the plate marked
V,
Note: Remove the protection metallic plate covering the
waveguide hole on ODU.
GUIDE PIN
RX LEV
MON
IFL
Main Master
FG
RX LEV
MON
IFL
FG
Sub Master
2-61
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
Procedure
Insert the O-rings to the two ODU ports of the OMT (see figure
in step 9),
Insert the guide pin into the hole of the OMT and set the
position of screws,
GUIDE PIN
Fix the two ODUs with hex screws (four locations) using the
allen key wrench,
Note: Be careful not to damage the O-rings.
H
POLARIZATION
SIDE
HEX SCREW
ODU
ODU
O-ring
O-ring
V
POLARIZATION
SIDE
ODU
2-62
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
Procedure
Cautions: 1. Tighten all screws with lighter torque at first, then full
torque as specified.
2. When either ODU is demounting for ODU replacing or
other reasons, fix the attached short plate to the
demounted port of the OMT to avoid leaking of RF
power from the OMT and for waterproof.
3. To avoid occurrence of bit errors due to microphonic
properties, when installing the SUB Master ODU,
protect the Main Master ODU from mechanical knocks.
SHORT
PLATE
FIXED SHORT
PLATE TO THE ODU
PORT
2-63
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
Procedure
MOUNTING BRACKET
THIN NUT
THICK NUT
SPRING WASHER
M6
Tightening torque:
4.0 Nm 10%
FLAT WASHER
O- RING
U-BOLT
BOLT (M4)
SPRING WASHER
WAVEGUIDE
WASHER
Notes:
The wave guide for the antenna direct mounting type ODU is flange
adapter is required. Refer to the following procedure.
2-64
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
Procedure
ODU BRACKET
SPRING WASHER
Tightening torque:
3.0 Nm 10%.
ATTACHMENT
Loosen eight nuts and remove the two U-bolts from the ODU
bracket,
ODU BRACKET
U-BOLT
NUT
2-65
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
Procedure
ODU BRACKET
FLAT WASHER
SPRING WASHER
THICK NUT (M10)
THIN NUT (M10)
U-BOLT
10%
4
Mount the ODU to the ODU bracket with attached four bolts
(Align the guide pins on the ODU and the guide holes on the
bracket),
ODU BRACKET
Antenna direct
mounting type ODU
with NEC special
flange.
2-66
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
Procedure
5.
Make sure that the ODU and the ODU bracket are fixed at
specified values.
Note: Be careful not to damage the O-ring attached to the PBR adapter.
O-RING
WASHER
SPRING WASHER
BOLT (M4)
WAVEGUIDE
WITH PBR( ) FLANGE
Note: Tightening torque is 1.4 Nm 10%.
2-67
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
Procedure
1.
THIN NUT
THICK NUT
SPRING WASHER
FLAT WASHER
U-BOLT
Tightening torque:
34.0 Nm 10%
2.
M6
3.
2-68
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
Procedure
BRACKET
4.
5.
ODU
COAXIAL
CABLE
Nut
ANTENNA
Bolt (M4)
Transducer
6.
ODU
COAXIAL
CABLE
2-69
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
Procedure
No.1 ODU
ODU
BRACKET
COAXIAL
CABLE*
COAXIAL
CABLE
POLE
No.2 ODU
SIDE VIEW
2-70
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
! IF IN/OUT
XPIC CTRL
TX
RX
XPIC
RESET
PWR
ODU
MD/
CBL SELV
G PULL
ALM
2M IN/OUT-B
2M IN/OUT-A
PWR
PORT 1
PROTECT
(Blank)
LCT
NMS
NE
PORT 2
100M
100M
PASOLINK NEO
MAINT
MEMORY
IDU
AUX/ALM
SC IN/OUT
EOW
CALL
MMC
1+0 SYSTEM
! IF IN/OUT
TX
RX
XPIC
RESET
PWR
ODU
MD/
CBL SELV
XPIC CTRL
TX
RX
XPIC
RESET
PWR
ODU
MD/
CBL SELV
G PULL
! IF IN/OUT
ALM
PWR
2M IN/OUT-B
2M IN/OUT-A
100M
PORT 1
PROTECT
PULL
PORT 2
PWR
LCT
NMS
NE
100M
XPIC CTRL
PASOLINK NEO
MAINT
MEMORY
IDU
AUX/ALM
SC IN/OUT
EOW
CALL
MMC
1+1 SYSTEM
IDU
RX LEV
MON
IFL
FG
FG
2-71
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
LIGHTNING ROD
PROTECT AREA
OUTDOOR EARTH GROUND TERMINAL
(EXISTING OR CUSTOMER SUPPLIED)
30
30
EARTH LINE
ODU
COAXIAL CABLE
RACK
IDU
EARTH LINE
(Grounding Resistance:
less than 10 ohms)
Cautions: 1. Install the ODU within the area protected by lightning rod.
2. To avoid surge currents caused by lightning circulating in the
equipment earth system, connect the equipment earth system
(frame ground) to ground of the lightning rod at ground level.
Note:Frame Ground terminal of the IDU (5 mm square cable (means more
than 2.5 mm diameter cable (AWG #10) is recommended to apply for the
earth grounding. The proper press fix terminal tool shall be used.)
This connection is an example.
Fig. 2-9 Connection for Frame Grounding (1/2)
2-72
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
LIGHTNING ROD
TOWER
ODU
COAXIAL CABLE
FG
EARTH LINE
ISOLATED FROM
TOWER
(Grounding-resistance:
less than 10 ohms)
(Grounding-resistance
of tower: less than
10 ohms)
INDOOR EARTH
LINE
IDU
GROUND
LEVEL
Notes:* NEC recommends that frame ground of ODU should be connected to earth line as NECs
standard installation.
EP : Earth Ground Point of tower
FG : Frame Ground terminal of the IDU (5 mm square cable (means more than 2.5 mm
diameter cable (AWG #10) is recommended to apply for the earth grounding. The proper
press fix terminal tool shall be used.)
This connection is an example.
Fig. 2-9
2-73
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
ANT
ANT
POLE
POLE
HYB
ODU
ODU
Note A
Note A
ODU
Note A
These parts should be wrapped
the self-bonding tape tightly, twice
or more around the IF cable
connector and IF IN/OUT
connector of the ODU for
waterproof.
self-bonding
tape
stretch
ODU
twice
2-74
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
ODU
IFL CONNECTOR
ODU
Wrap twice the IF IN/OUT connector with
self-bonding tape for waterproofing.
SELF-BONDING TAPE
SELF-BONDING TAPE
self-bonding
tape
ODU
stretch
ODU
twice
IF CABLE
IN CASE OF LANGLE
2-75
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
2.10Cable Termination
In this section, list of tools and material and the method for cable
termination method are described. The following cables are described for
reference.
D-sub connector (refer to Chart 2-14)*
TNC-P connector of the L angle type for IDU (refer to Chart 2-15)**
N-P connector of the L angle type for ODU (KOMINE made) (refer
to Chart 2-16)**
N-P connector of the L angle type for ODU (HIROSE made) (refer to
Chart 2-17)**
N-P connector of the straight type for ODU (refer to Chart 2-18)**
Molex 5557-04R connector (refer to Chart 2-19)
BNC connector soldering type (refer to Chart 2-20)
BNC connector crimping type (refer to Chart 2-21)
D-Sub High Density Crimp Contacts assembly (refer to Chart 2-22)*
Notes: 1. *Use D-sub connectors of less than 16 mm in height as
illustrated below.
D-SUB CONNECTOR
HEIGHT
WIDTH
2-76
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
1
2
3
4
5
6
NAME
REMARKS
Soldering Iron
Solder
Knife
Measure/Ruler
Wire Stripper
Adjustable Wrench
CL250-0012-2/
CL250-0013-5
57026-5000/
57027-5000
09 99 000 0596/
09 99 000 0513
2-77
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
Procedure
Strip back the cable sheath, taking care not to damage the
braided shield.
50 mm
CABLE
Fold back the braided shield (do not separate the strands) and
trim it as shown.
WIRE
4 mm
WIRE
2-78
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
Procedure
WIRE
SOCKET CONTACT
The cable should be fitted so that insulation and bare wire are
arranged as shown.
2-79
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
Procedure
SOCKET CONTACT
WIRE
Set the cable into the plug case as shown in figure below. Then,
fix the cable using the cable clamper and two screws.
CABLE CLAMPER
PLUG CASE
2-80
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
Procedure
10
11
CIRCLE A
SCREW
DRAIN WIRE
CIRCLE B
2-81
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
12
Procedure
Fix the plug case with two screws, as shown in the figure.
SCREW
PLUG CASE
2-82
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
Procedure
Pass the tightening nut, the washer and the gasket on the cable in
the order shown in the figure.
Then, strip the cable jacket in the diameter shown in the figure.
[Applicable cable : 8D-FB-E]
Note: Be careful of insertion direction for the gasket and the tightening nut.
Note: Be careful not to damage the outer conductor.
Note: Do not reuse the gasket because the clamp deforms it after
tightening.
Insert the clamp to clamp the stripped cable jacket end. Open the
end of the outer conductor a little,
Insert the hood between the plastic tape with aluminium foil and
the outer conductor,
Note: Use the insertion stick to open the hole of about 9. No gap is
allowed in between the clamp, the outer conductor and the hood.
2-83
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
Procedure
After inserting the hood, cut off the plastic tape with aluminium
foil and the dielectric at A-surface,
Cut off the part of the outer conductor exceeding the clamp rim
with a knife,
Check that distance between the tip of the center conductor and
A-surface is 6 to 7 mm,
If it is more than 7 mm, cut the center conductor to correct
length,
2-84
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
Procedure
Combine the convex part of the clamp to the concave part of the
gasket, Then insert this block to the shell,
2-85
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
Procedure
2-86
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
Procedure
First fit the tying metal, washer and gasket on the cable.
GASKET
WASHER
TYING METAL
CABLE
Strip back the cable sheath, taking care not to damage the
braided shield, and fit the clamp.
CLAMP
9 mm
Fold back the braided shield (separating the strands of the braid)
and trim it.
FERRULE
2-87
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
Procedure
BUSH
Cut the aluminium foil and inner insulator away along the
bushing and retain the inner conductor.
2-88
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
Procedure
Mount the contact onto the center conductor and mount the
insulator onto the contact.
INSULATOR
10
CONTACT
WRENCH POINT
2-89
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
Procedure
Pass the tightening nut, the washer and the gasket on the cable in
the order shown in the figure.
Then, strip the cable jacket in the diameter shown in the figure.
[Applicable cable : 8D-FB-E]
Note: Be careful of insertion direction for the gasket and the tightening nut.
Note: Be careful not to damage the outer conductor.
Note: Do not reuse the gasket because the clamp deforms it after
tightening.
Insert the clamp to clamp the stripped cable jacket end. Open the
end of the outer conductor a little,
Insert the hood between the plastic tape with aluminium foil and
the outer conductor,
Note: Use the insertion stick to open the hole of about 9. No gap is
allowed in between the clamp, the outer conductor and the hood.
2-90
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
Procedure
After inserting the hood, cut off the plastic tape with aluminium
foil and the dielectric at A-surface,
Cut off the part of the outer conductor exceeding the clamp rim
with a knife,
Check that distance between the tip of the center conductor and
A-surface is 6 to 7 mm,
If it is more than 7 mm, cut the center conductor to correct
length,
2-91
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
Procedure
Combine the convex part of the clamp to the concave part of the
gasket, Then insert this block to the shell,
2-92
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
Procedure
2-93
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
Procedure
First fit the lock nut, washer and gasket on the cable as shown.
LOCK NUT
WASHER
GASKET
CABLE
Strip back the cable sheath, taking care not to damage the
braided shield, and fit clamp A.
CLAMP A
CONNECTOR
2-94
CABLE
N260
5D-FB
25 mm
N227
8D-FB
25 mm
N228
10D-FB
27 mm
N229
12D-FB
27 mm
Fold back the braided shield (separating the strands of the braid)
and trim it.
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
Procedure
Cut away the insulation from the center conductor and fit clamp
B. Be sure not to cut or scratch the conductor while stripping
the insulation.
1.0 mm
CLAMP B
CUT
Cut the center conductor. Taper the end of the center conductor
using a file as shown in the enlarged view below.
12 mm
CENTER CONTACT
2-95
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
Procedure
INSULATOR
LOCK NUT
2-96
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
Procedure
3.0 to 3.5 mm
POWER SUPPLY CABLE
FOR 48 V, 1A
2-97
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
Procedure
1.5 to 1.8
1.8 to 2.2
1
2
2.3 to 2.6
2.6 to 3.1
Squeeze the handle of the hand crimping tool, insert cable into
socket contact.
The cable should fit, so insulation and bare wire are arranged as
shown.
Squeeze the handle of the hand crimping tool until the ratchet is
released.
INSULATION BARREL
WIRE BARREL
2-98
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
Procedure
Insert the socket contacts into the power connector until they
lock.
48 V (*1)
POWER CONNECTOR
GND (*2)
2-99
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
CLAMP 1
CLAMP 2
SHELL
(15.5 mm)*
(39/64)*
trim
(7 mm)*
(9/32)*
SOLDERING
2-100
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
contraction sleeve
ferrule
STRIPPING
insulator
A
B
C
Sheath
BNC shell
pin contact
(15 mm)*
(6.3 mm)*
(4 mm)*
center conductor
dielectric
shield wire
and
insulator
pin contact
2-101
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
crimping area
crimping tool
pin contact
ferrule
crimp
trim
crimping tool
2-102
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
contraction sleeve
heated air
2-103
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
The following explains how to assemble high density crimp contacts used
for HARTING hand crimp tool as an example.
Crimping/inserting contacts process
Stranded wire
Jacket
2.5 0/+0.5 mm
Applicable wire size : 0.14 - 0.22 mm2 (AWG26 - 24),
stranded, maximum insulation: 1.38 mm
Stamped male contacts : 09 56 000 8175 (Level S4),
High density male connectors : 09 56 300 5601 (#44)
Crimp Tool
(09 88 999 0596)
Note: When the handles are in close position, squeeze handles completely until safety ratchet is
released.
Indication of the part number
Chamber for 0.22 mm2 (AWG 24)
in
the
selected
2-104
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
Wire
[Removal]
Contact can be removed
together with wire.
[Insertion]
Contact can be inserted
together with wire.
Position the
Insertion and removal tool
Connector
2-105
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
Fix the cables using cable binder to the rack as like as indicated
position.
Notes: 1. Do not cross the cables on front of indicators and power
switch used for maintenance.
2. Take suitable bend radius to wiring the IF cable. (e.g.
10D-FB: 70 cm)
3. For the IF cable connection, it is recommended to use
adapter. (Applicable adapters are listed table below).
Table 2-6 IF Cable Adapter
Adapter
IF Cable
TCN (P) - N(J)
2-106
5D-FB
8D-FB
10D-FB
TCN(P) - TCN(J)
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
! IF IN/OUT
PULL
XPIC CTRL
TX
RX
XPIC
RESET
PWR
ODU
MD/
CBL SELV
XPIC CTRL
TX
RX
XPIC
RESET
PWR
ODU
MD/
CBL SELV
PWR
XPIC CTRL
TX
RX
XPIC
RESET
PWR
ODU
MD/
CBL SELV
PWR
XPIC CTRL
TX
RX
XPIC
RESET
PWR
ODU
MD/
CBL SELV
ALM
2M IN/OUT-B
2M IN/OUT-A
PWR
2M IN/OUT-C
FG
FG
! IF IN/OUT
! IF IN/OUT
PROTECT
PULL
LCT
NMS
NE
PASOLINK NEO
MAINT
MEMORY
IDU
AUX/ALM
SC IN/OUT
EOW
CALL
MMC
PULL
ALM
2M IN/OUT-C
2M IN/OUT-B
2M IN/OUT-A
FG
FG
! IF IN/OUT
PROTECT
PULL
PWR
LCT
NMS
NE
AUX/ALM
PASOLINK NEO
MAINT
MEMORY
IDU
SC IN/OUT
EOW
CALL
MMC
2-107
Submission Prohibited
NEC Internal Use Only
INSTALLATION
ROI-S05750
2-108
108 pages
Submission Prohibited
NEC Internal Use Only
INITIAL LINE UP
ROI-S05750
3. INITIAL LINE UP
This section explains instructions for the initial lineup of the equipment.
Included is information on start-up, shut-down, IDU and ODU equipment
setting, antenna orientation and lineup test between two stations.
When the PASOLINK Monitor is used for RX LEV monitoring, connect
the X0818 PASOLINK Monitor to the ODU. The PASOLINK Monitor
operates on a dry battery (6F22/9V).
Notes:
3-1
Submission Prohibited
NEC Internal Use Only
INITIAL LINE UP
ROI-S05750
3.1 Start-up
The procedure for starting the equipment is shown in Chart 3-1.
Warning: 1. The 48 V DC is superimposed on the centre conductor
of the IF coaxial cable between the MODEM and the
ODU. Connecting test equipment directly to this
terminal may damage it and touching the coaxial cable
core may cause electrical shock.
2. Do not disconnect the IF cable between the MODEM and the
ODU in operating condition, to avoid damaging the
PASOLINK NEO, turn the IDU power OFF before
connecting/disconnecting the IF cable.
3-2
Submission Prohibited
NEC Internal Use Only
INITIAL LINE UP
ROI-S05750
Procedure
1+0 SYSTEM
1
Check that the IF cable between the MODEM and the ODU is
firmly connected,
Check that the IF cable between the No.1 MODEM and the No.
1 ODU is connected,
Pull out the PWR switch lever and turn on, (see Fig. 3-1),
3-3
Submission Prohibited
NEC Internal Use Only
INITIAL LINE UP
ROI-S05750
POWER SUPPLY
48 V
2 1
MODEM
GND
SELV
PWR LED
IDU
! IF IN/OUT
XPIC CTRL
PWR
ODU
MD/
CBL SELV
1+0 CONFIGURATION
ALM
2M IN/OUT-B
2M IN/OUT-A
PWR
PORT 1
PROTECT
PORT 2
(Blank)
LCT
NMS
NE
100M
100M
TX
RX
XPIC
RESET
G PULL
PASOLINK NEO
MAINT
MEMORY
IDU
AUX/ALM
SC IN/OUT
EOW
CALL
MMC
PWR SWITCH
48 V
GND
48 V
2 1
GND
2 1
No.1 MODEM
PWR LED
SELV
! IF IN/OUT
XPIC CTRL
TX
RX
XPIC
RESET
PWR
ODU
MD/
CBL SELV
1+1 CONFIGURATION
G PULL
ALM
2M IN/OUT-B
2M IN/OUT-A
PWR
! IF IN/OUT
XPIC CTRL
TX
RX
XPIC
RESET
PWR LED
PWR
ODU
MD/
CBL SELV
PORT 1
SELV
PROTECT
PORT 2
PULL
PWR
LCT
NMS
NE
PWR SWITCH
AUX/ALM
100M
100M
PWR SWITCH
PASOLINK NEO
MAINT
MEMORY
IDU
SC IN/OUT
EOW
CALL
MMC
IDU
No.2 MODEM
Caution: The PASOLINK NEO operates only negative voltage (48 V). Therefore, the power
supply system for the existing equipment which is used floating power supply (20 to
60 V/+20 to +60 V) must not be connected to the PASOLINK NEO.
When the IDU NEO is used with another type ODU (e.g. EHG ODU), optional DCDC CONV module must be installed to the IDU NEO. The ODU will be shorten its
life or may be damaged if not used optional DC-DC CONV module.
3-4
Submission Prohibited
NEC Internal Use Only
INITIAL LINE UP
ROI-S05750
Procedure
1+0 SYSTEM
1
Check that the IF cable between the MODEM and the ODU is
connected,
Pull out the PWR switch lever of the DC-DC CONV and turn
on,
Pull out the PWR switch lever of the MODEM and turn on,
Check that the IF cable between the No.1 MODEM and the No.
1 ODU, is connected,
Pull out the PWR switch lever of the No.1 DC-DC CONV and
turn on,
3-5
Submission Prohibited
NEC Internal Use Only
INITIAL LINE UP
ROI-S05750
3-6
Procedure
Pull out the PWR switch lever of the No.1 MODEM and turn
on,
Submission Prohibited
NEC Internal Use Only
INITIAL LINE UP
ROI-S05750
MODEM
SELV
PWR LED
! IF IN/OUT
XPIC CTRL
TX
RX
XPIC
RESET
1+0 CONFIGURATION
G PULL
PWR
ODU
MD/
CBL SELV
(Blank)
ALM
PWR
STM-1 IN
STM-1 OUT
43V
STD
G
OUT
PWR
ALM
FUSE (250V/8AH)
LCT
DC-DC
CONV
43 V/OUT
NMS
MAINT
MEMORY
IDU
AUX/ALM
NE
SC IN/OUT
EOW
CALL
MMC
3
POWER SUPPLY
2 1
20 to 60V/(or 0V)
PASOLINK NEO
PROTECT
PULL
PWR
SELV
2 1
20 to 60V/(or 0V)
2 1
20 to 60V/(or 0V)
No.2 PWR SWITCH
No.1 SELV
No.1 PWR SWITCH
No.1 43 V/OUT
TX
RX
XPIC
RESET
PWR
ODU
MD/
CBL SELV
XPIC CTRL
TX
RX
XPIC
RESET
PWR
ODU
MD/
CBL SELV
ALM
FUSE (250V/8AH)
43V
PULL
SELV
PWR
STM-1 IN
STM-1 OUT
G
OUT
STD
PULL
FUSE (250V/8AH)
SELV
PULL
PWR
(Blank)
ALM
PWR
PWR
ALM
XPIC CTRL
PWR
G
OUT
! IF IN/OUT
No.2 43 V/OUT
43V
STD
No.2 SELV
! IF IN/OUT
PROTECT
PULL
PWR
LCT
NMS
NE
AUX/ALM
PASOLINK NEO
MAINT
MEMORY
IDU
SC IN/OUT
EOW
CALL
MMC
No.2 MODEM
No.1 SELV
No.1 MODEM
Caution: The PASOLINK NEO operates only negative voltage (48 V). Therefore, the power
supply system for the existing eqipment (not NEO) which is used floating power
supply (20 to 60 V/+20 to +60 V) must not be connected to the PASOLINK NEO.
In case of the IDU NEO is used with the existing ODU (e.g. EHG ODU), optional
DC-DC CONV module must be used. If the optional DC-DC converter is not used
the EHG ODU lifetime or the ODU may be damaged.
Fig. 3-1 DC Power cable Connection and Power ON/OFF (2/2)
3-7
Submission Prohibited
NEC Internal Use Only
INITIAL LINE UP
ROI-S05750
3.2 Shut-down
The shut-down procedures for the equipment is shown in Chart 3-2.
Warning: After turning ON the equipment, wait at least 1 minute
before turning it OFF again. Repeatedly turning the power
ON and OFF with in a short interval may cause the IDU/
ODU to fail.
Chart 3-2 Shut-down
Step
Procedure
1+0 SYSTEM
1
Pull out the PWR switch lever on the MODEM and turn off the
PWR switch (see Fig. 3-1),
3-8
Pull out the PWR switch lever on the other MODEM, then turn
off the PWR switch. (see Fig. 3-1).
Submission Prohibited
NEC Internal Use Only
INITIAL LINE UP
ROI-S05750
Setup Item
LCT
1.
Equipment Setup
Chapter 3
2.
Chapter 6.3
3.
Provisioning
Chapter 7
4.
Relay/House Keeping
Chapter 7
XPIC CTRL
PWR
ODU
MD/
CBL SELV
G PULL
ALM
PWR
2M IN/OUT-B
2M IN/OUT-A
PORT 1
PROTECT
(Blank)
LCT
NMS
NE
AUX/ALM
SC IN/OUT
PORT 2
100M
100M
TX
RX
XPIC
RESET
PASOLINK NEO
MAINT
MEMORY
IDU
EOW
CALL
MMC
LCT
1+1 CONFIGURATION
! IF IN/OUT
XPIC CTRL
PWR
ODU
MD/
CBL SELV
G PULL
ALM
PWR
2M IN/OUT-B
2M IN/OUT-A
! IF IN/OUT
PORT 1
XPIC CTRL
TX
RX
XPIC
RESET
PWR
ODU
MD/
CBL SELV
PROTECT
PORT 2
PULL
PWR
LCT
NMS
NE
AUX/ALM
100M
100M
TX
RX
XPIC
RESET
PASOLINK NEO
MAINT
MEMORY
IDU
SC IN/OUT
EOW
CALL
MMC
USB
PC for LCT
Fig. 3-2 LCT Connection
3-9
Submission Prohibited
NEC Internal Use Only
INITIAL LINE UP
ROI-S05750
User Interface
Redundancy Setting
INTFC *1
INTFC (Main) *2
INTFC (Sub) *2
XPIC Usage *3
APS Function *4
Modulation Scheme
Transmission Capacity
TX RF Frequency
RX RF Frequency *6
Frame ID
TX Power Control
LAN Port Usage *5
LAN Capacity *5
TX Start Frequency
TX Stop Frequency
Frequency Step
Shift Frequency
Upper/Lower
Sub Band
Notes:*1
*2
*3
The TX/RX frequency for the Main Master and Sub Master
channels must be set to the same values. The Main Master
and Sub Master channels must be connected to one dual
polarized antenna. The reference local frequency and the
action control of the ATPC/MTPC are applied from the
Main Master channel to the Sub Master channel.
*4 For SDH APS only.
*5 For LAN transmission only.
*6 There is two types ODU for the RX RF Frequency setup
mode.
Type 1.When the transmitting frequency is set, the receiving
frequency is automatically assigned.
Type 2.When the transmitting frequency is set, the receiving
frequency is automatically assigned and assignment of it in
manual is also available.
3-10
Submission Prohibited
NEC Internal Use Only
INITIAL LINE UP
ROI-S05750
3-11
Submission Prohibited
NEC Internal Use Only
INITIAL LINE UP
ROI-S05750
3-12
Submission Prohibited
NEC Internal Use Only
INITIAL LINE UP
ROI-S05750
Procedure
Maintenance1
Maintenance2
3-13
Submission Prohibited
NEC Internal Use Only
INITIAL LINE UP
ROI-S05750
Procedure
CW Control:
(at opposite site)
Value
On
No.1
No.1
Manual
On
On
Off
Off
Off
Off
Off
Off
Off
Off
Auto
Auto
Auto
Auto
Auto
Auto
...
...
...
On
On
Setting
Off
Auto
Auto
Off
Off
Off
Off
Off
Off
Off
Off
Off
Off
Auto
Auto
Auto
Auto
Auto
Auto
On
No.1
No.1
On
On
On
On
On
On
On
On
On
On
Forced Reset
Forced Reset
Forced Reset
Forced Reset
Forced Reset
Forced Reset
DADE
Offset DADE
A
A
Off
Off
No.2
No.2
On
On
Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
Set
DADE Off Set
Set
Set
Set
Set
3-14
Submission Prohibited
NEC Internal Use Only
INITIAL LINE UP
ROI-S05750
Procedure
4.5
4
3.5
3
2.5
2
1.5
1
0.5
0
-80
-70
-60
-50
-40
-30
-20
3-15
Submission Prohibited
NEC Internal Use Only
INITIAL LINE UP
ROI-S05750
Procedure
PASOLINK MONITOR
0
DIGITAL MULTIMETER
OW
RX LEV MON
RX LEV
MON
RX LEV/OW IN
IFL
FG
ODU
Notes 1: It is necessary to set to the Antenna Alignment Mode using PC for LCT
when monitor the RX level with the PASOLINK MONITOR unit.
2: The RX LEV MON terminal on the ODU (conformed to IEC61169-24).
3: The RX LEV MON terminal must be capped for waterproof.
Fig. 3-3 Antenna Orientation Test Setup
Note: The fixed bolts and nuts to be used for the antenna orientation
differ with antenna bracket types, refer to antenna bracket shown
in Fig. 3-4 (1/4) to (4/4).
3-16
Submission Prohibited
NEC Internal Use Only
INITIAL LINE UP
ROI-S05750
10 10 K
Power density S (mW/cm ) =
40 R2
2
Where:
P = Output power of ODU (dBm),
G = Antenna Gain (dBi),
(in consideration of the angle from antenna)
K = Reflection factor =2.56 (given),
R = Distance between Human and Antenna (m)
Calculation example 1, (90 degree side of antenna)
PASOLINK = 18 GHz/+23 dBm,
Antenna diameter = 0.6 m,
0 degree antenna gain = 39 dBi,
90 degrees side antenna gain = 24 dBi, (90 degrees attenuation = 63 dB),
Distance = 0.1 m
Power density S (mW/cm2) = 0.0016 0.01 (European safety guideline)
Calculation example 2, (0 degree, front side of antenna)
PASOLINK = 7 GHz/+27 dBm,
Antenna diameter = 1.8 m,
0 degree antenna gain = 40 dBi,
Distance = 100 m
Power density S (mW/cm2) = 0.01 => Equal to European safety guideline
3-17
Submission Prohibited
NEC Internal Use Only
INITIAL LINE UP
ROI-S05750
Procedure
6-1
6-2
6-3
6-4
6-5
6-6
B.
6-7
6-8
6-9
3-18
6-10
6-11
6-12
6-13
Submission Prohibited
NEC Internal Use Only
INITIAL LINE UP
ROI-S05750
C.
Procedure
6-14
6-15
6-16
6-17
6-18
6-19
10
11
3-19
Submission Prohibited
NEC Internal Use Only
INITIAL LINE UP
ROI-S05750
Procedure
3-20
Submission Prohibited
NEC Internal Use Only
INITIAL LINE UP
ROI-S05750
4. Adjust elevation
2. Adjust azimuth
2. Adjust azimuth
1. Loosen for adjusting azimuth
4. Adjust elevation
0.3 m Antenna
3-21
Submission Prohibited
NEC Internal Use Only
INITIAL LINE UP
ROI-S05750
2. Adjust azimuth.
0.6 m Antenna
C. RFS C-Mount TYPE BRACKET
Fig. 3-4 Location of Adjusting Nuts and Bolts (2/4)
3-22
Submission Prohibited
NEC Internal Use Only
INITIAL LINE UP
ROI-S05750
ROTATION
INDICATOR
SCREW 2
SCREW 1
POLE
SCREW 3
3-23
Submission Prohibited
NEC Internal Use Only
INITIAL LINE UP
ROI-S05750
Procedure
3-24
10
Submission Prohibited
NEC Internal Use Only
INITIAL LINE UP
ROI-S05750
Procedure
11
12
13
12
13
14
15
16
17
3-25
Submission Prohibited
NEC Internal Use Only
INITIAL LINE UP
ROI-S05750
STRUT
TURNBUCKLE-1
A. Azimuth Adjustment
TURNBUCKLE-2
B. Elevation Adjustment
ANDREW VHLP4 TYPE BRACKET
Fig. 3-4 Location of Adjusting Nuts and Bolts (4/4)
3-26
Submission Prohibited
NEC Internal Use Only
INITIAL LINE UP
ROI-S05750
Chart No.
Orderwire Test
Chart 3-7
Chart 3-8 *1
DADE Adjust
Chart 3-9 *2
BER Measurement
Chart 3-10
Meter Reading
Chart 3-11
PMON Clear
Chart 3-12 *3
Note: *1
*2
*3
After the intial lineup has been finished, clear PMON and
RMON data for the start of service operation.
Chart 3-7 Orderwire Test
Step
Procedure
Check that the orderwire can be used between two stations with
headsets,
3-27
Submission Prohibited
NEC Internal Use Only
INITIAL LINE UP
ROI-S05750
PROTECT
LCT
NMS
NE
AUX/ALM
PASOLINK NEO
MAINT
MEMORY
IDU
SC IN/OUT
EOW
CALL
MMC
CALL
EOW
Local Station
PROTECT
LCT
NMS
NE
AUX/ALM
MAINT
MEMORY
IDU
SC IN/OUT
EOW
Opposite Station
Fig. 3-5 OW Test Setup for IDU
3-28
PASOLINK NEO
EOW
CALL
MMC
CALL
Submission Prohibited
NEC Internal Use Only
INITIAL LINE UP
ROI-S05750
Procedure
LCT MENU
Alarm/Status
Equipment Setup
Inventory
AUX I/O
Maintenance
Provisioning
Metering
PMON(History)
Maintenance1
Maintenance2
Value
On
No.1
No.1
Off
Auto
Auto
Setting
On
No.1 No.2
No.1 No.2
Set
Set
Set
Check that the Value box for each item turned to the required
status.
3-29
Submission Prohibited
NEC Internal Use Only
INITIAL LINE UP
ROI-S05750
Procedure
Connect the USB cable to the USB port of PC and the LCT port
of the IDU (see Fig. 3-2),
---Maintenance1--Item
Maintenance
Value
On
DADE Adjust
---
Note:
3-30
Setting
Off On
DADE Offset DADE
Set
DADE Off
Set
The DADE adjustment is needed in initial lineup or when the IF CABLE is replaced. It
is not needed readjustment when the INTFC status is indicated In-phase. The setting
conditions are as follows:
DADE:Automatically adjust delay time based on either No.1 signal or No.2 signal
which it is selected by RX SW under the Outphase condition of the INTFC
status. The DADE control is processed assuring no interruption of traffic.
Offset DADE:Automatically adjust delay time based on either No.1 signal or No.2 signal
which it is selected by RX SW under the Outphase condition of the INTFC
status. Since the offset memory minimizes the latency delay, traffic
interruption occurs at that moment. This Offset DADE controls the delay
time difference to a minimum than DADE control.
DADE off: Set when DADE function is not used. For particularly, when low bit rate (10
to 20 MB) transmission is applied to the system, the DADE control is not
required.
Submission Prohibited
NEC Internal Use Only
INITIAL LINE UP
ROI-S05750
In 1+1 system, BER measurement of both No.1 and No.2 channels should
be performed between terminal stations.
Apparatus :
Digital Multimeter with test leads
Screwdriver
SDH/SONET Analyzer (for SDH)/PDH Analyzer (for PDH)
Optical Variable Attenuator
Headset
Step
A.
Procedure
16E1/48E1/E3 INTERFACE
Note: Pin connector facilities are necessary to connect the PDH
analyzer signal cable to D-sub or MDR connector.
At both transmitting and receiving ends, set the BER test set as
follows:
For E1 Signal
Bit rate:
2.048 Mbps
Code format:
HDB3
Level/Impedance: 2.37 Vo-p (75 ohms, unbalanced) or
3.0 Vo-p (120 ohms, balanced)
For E3 Signal
Bit rate:
34.368 Mbps
Code format:
HDB3
Level/Impedance: 1.0 Vo-p (75 ohms, unbalanced)
Note: Operation of the TX SW and RX SW are not required in
1+0 system for the following.
3-31
Submission Prohibited
NEC Internal Use Only
INITIAL LINE UP
ROI-S05750
Procedure
TRANSMITTING END
Connector
facilities
No.1
2M IN/OUT A
2M IN/OUT B
16E1 INTFC
! IF IN/OUT
TX
RX
XPIC
RESET
XPIC CTRL
PWR
ODU
MD/
CBL SELV
PDH
ANALYZER
G PULL
ALM
PWR
2M IN/OUT-B
2M IN/OUT-A
100M
PORT 1
PORT 2
ALM
100M
! IF IN/OUT
XPIC CTRL
TX
RX
XPIC
RESET
PWR
ODU
MD/
CBL SELV
G PULL
PWR
No.2
LCT
NMS
NE
MAINT
MEMORY
IDU
AUX/ALM
SC IN/OUT
EOW
CALL
MMC
2M IN/OUT A
2M IN/OUT B
Connector
facilities
No.1
PASOLINK NEO
PROTECT
2M IN/OUT C
48E1 INTFC
! IF IN/OUT
TX
RX
XPIC
RESET
PWR
ODU
MD/
CBL SELV
XPIC CTRL
PWR
ODU
MD/
CBL SELV
XPIC CTRL
TX
RX
XPIC
RESET
PULL
ALM
2M IN/OUT-B
2M IN/OUT-A
PWR
2M IN/OUT-C
! IF IN/OUT
PWR
PASOLINK NEO
PROTECT
PULL
LCT
NMS
NE
MAINT
MEMORY
IDU
AUX/ALM
SC IN/OUT
EOW
CALL
MMC
No.2
RECEIVING END
Connector
facilities
No.1
2M IN/OUT A
2M IN/OUT B
16E1 INTFC
! IF IN/OUT
XPIC CTRL
TX
RX
XPIC
RESET
PWR
ODU
MD/
CBL SELV
PDH
ANALYZER
G PULL
ALM
PWR
2M IN/OUT-B
2M IN/OUT-A
100M
PORT 1
PORT 2
ALM
100M
! IF IN/OUT
XPIC CTRL
TX
RX
XPIC
RESET
PWR
ODU
MD/
CBL SELV
PROTECT
G PULL
PWR
No.2
LCT
NMS
NE
MAINT
MEMORY
IDU
AUX/ALM
SC IN/OUT
EOW
MMC
2M IN/OUT C
48E1 INTFC
! IF IN/OUT
CALL
2M IN/OUT A
2M IN/OUT B
Connector
facilities
No.1
PASOLINK NEO
TX
RX
XPIC
RESET
PWR
ODU
MD/
CBL SELV
XPIC CTRL
TX
RX
XPIC
RESET
PWR
ODU
MD/
CBL SELV
XPIC CTRL
PULL
ALM
2M IN/OUT-B
2M IN/OUT-A
PWR
2M IN/OUT-C
! IF IN/OUT
No.2
PROTECT
PULL
PWR
LCT
NMS
NE
AUX/ALM
EOW
CALL
MMC
3-32
PASOLINK NEO
MAINT
MEMORY
IDU
SC IN/OUT
Submission Prohibited
NEC Internal Use Only
INITIAL LINE UP
ROI-S05750
Procedure
TRANSMITTING END
PDH
ANALYZER
No.1
E3 INTFC
! IF IN/OUT
XPIC CTRL
TX
RX
XPIC
RESET
PWR
ODU
MD/
CBL SELV
G PULL
E3 CH1
E3 CH2
ALM
PWR
IN
IN
! IF IN/OUT
XPIC CTRL
TX
RX
XPIC
RESET
PWR
ODU
MD/
CBL SELV
WS IN/OUT
OUT
PORT 1
PROTECT
G PULL
PWR
100M
LCT
NMS
NE
AUX/ALM
PORT 2
100M
OUT
PASOLINK NEO
MAINT
MEMORY
IDU
SC IN/OUT
EOW
CALL
MMC
E3 CH2 IN
E3 CH1 IN
No.2
RECEIVING END
PDH
ANALYZER
No.1
E3 INTFC
! IF IN/OUT
TX
RX
XPIC
RESET
PWR
ODU
MD/
CBL SELV
XPIC CTRL
TX
RX
XPIC
RESET
PWR
ODU
MD/
CBL SELV
G PULL
E3 CH1
! IF IN/OUT
No.2
E3 CH2
ALM
PWR
IN
OUT
IN
WS IN/OUT
OUT
PWR
100M
PORT 1
PROTECT
G PULL
LCT
NMS
NE
AUX/ALM
PORT 2
100M
XPIC CTRL
PASOLINK NEO
MAINT
MEMORY
IDU
SC IN/OUT
EOW
CALL
MMC
E3 CH2 OUT
E3 CH1 OUT
3-33
Submission Prohibited
NEC Internal Use Only
INITIAL LINE UP
ROI-S05750
Procedure
10
3-34
Submission Prohibited
NEC Internal Use Only
INITIAL LINE UP
ROI-S05750
B.
Procedure
TRANSMITTING END
STM1 (ELE) IN
STM/SONET
ANALYZER
STM-1 INTFC
! IF IN/OUT
TX
RX
XPIC
RESET
PWR
ODU
MD/
CBL SELV
XPIC CTRL
PWR
ODU
MD/
CBL SELV
XPIC CTRL
TX
RX
XPIC
RESET
PULL
(Blank)
ALM
PWR
STM-1 IN
STM-1 OUT
! IF IN/OUT
PROTECT
PULL
LCT
PWR
NMS
NE
PASOLINK NEO
MAINT
MEMORY
IDU
AUX/ALM
SC IN/OUT
EOW
CALL
MMC
IDU
RECEIVING END
STM1 (ELE) OUT
STM-1 INTFC
! IF IN/OUT
TX
RX
XPIC
RESET
PWR
ODU
MD/
CBL SELV
XPIC CTRL
TX
RX
XPIC
RESET
PWR
ODU
MD/
CBL SELV
XPIC CTRL
STM/SONET
ANALYZER
PULL
(Blank)
ALM
PWR
STM-1 IN
STM-1 OUT
! IF IN/OUT
PROTECT
PULL
PWR
LCT
NMS
NE
AUX/ALM
SC IN/OUT
PASOLINK NEO
MAINT
MEMORY
IDU
EOW
CALL
MMC
IDU
Bit rate
Code format
Level
Impedance
: 155.52 Mbps
: STM-1, CMI
: 1.0 Vp-p
: 75 ohms, unbalanced
3-35
Submission Prohibited
NEC Internal Use Only
INITIAL LINE UP
ROI-S05750
Procedure
10
3-36
Submission Prohibited
NEC Internal Use Only
INITIAL LINE UP
ROI-S05750
C.
Procedure
OPTICAL INTERFACE
Caution: Do not stare into laser beam or view directly with
optical instruments. Otherwise, it may hurt eyes (Class
1 Laser Product).
1
STM-1 INTFC
! IF IN/OUT
XPIC CTRL
TX
RX
XPIC
RESET
PWR
ODU
MD/
CBL SELV
XPIC CTRL
TX
RX
XPIC
RESET
PWR
ODU
MD/
CBL SELV
! IF IN/OUT
PULL
(Blank)
ALM
PWR
G
STM-1 OUT
STM-1 IN
ONLINE
PROTECT
PULL
PWR
STM/SONET
ANALYZER
OPTICAL
VARIABLE
ATTENUATOR *
STM-1 (OPT) IN
LCT
NMS
NE
PASOLINK NEO
MAINT
MEMORY
IDU
AUX/ALM
SC IN/OUT
EOW
CALL
MMC
IDU
RECEIVING END
STM-1 INTFC
! IF IN/OUT
XPIC CTRL
TX
RX
XPIC
RESET
PWR
ODU
MD/
CBL SELV
XPIC CTRL
TX
RX
XPIC
RESET
PWR
ODU
MD/
CBL SELV
! IF IN/OUT
PULL
(Blank)
ALM
PWR
G
STM-1 OUT
STM-1 IN
ONLINE
STM/SONET
ANALYZER
PROTECT
PULL
PWR
LCT
NMS
NE
AUX/ALM
PASOLINK NEO
MAINT
MEMORY
IDU
SC IN/OUT
EOW
CALL
MMC
IDU
At the receiving end, disconnect the OPT cable from the STM1
OUT connector on the STM-1 INTFC (see Fig. 3-8),
3-37
Submission Prohibited
NEC Internal Use Only
INITIAL LINE UP
ROI-S05750
Procedure
STM-1 INTFC(OPTICAL)
Bit rate
Code format
Level
IN
OUT
: 155.52 Mbps
: STM-1, NRZ
S-1.1
: 8 to 28 dBm/
L-1.1
10 to 34 dBm
: 8 to 15 dBm/
0 to 8 dBm
Wave length
IN
: 1310 nm
OUT
: 1310 nm
Note: Operation of the TX SW and RX SW are not required in
1+0 system.
4
10
3-38
Submission Prohibited
NEC Internal Use Only
INITIAL LINE UP
ROI-S05750
Procedure
4
Then, the values of Metering items are displayed as follows:
1+1 Configuration
----Metering--TX Power [dBm]*1
RX Level [dBm] *2
Power Supply [V] *3
BER *4
No.1
+19
-49.5
-45
0.0E-10
No.2
+19
-49.7
-45
Calculating
1+0 Configuration
----Metering--TX Power [dBm]*1
RX Level [dBm] *2
Power Supply[V] *3
BER *4
+19
-50
-45
1.10E-10
3-39
Submission Prohibited
NEC Internal Use Only
INITIAL LINE UP
ROI-S05750
Procedure
QPSK
7-8
10-11
13
15
3-40
32
38
52
+23
+24
+22
+22
+18
+3
+4
NA
+27
+21.5
+22.5
+22
+20
+18
+17 +14.5
+2
2.5
1.5
6.5
NA
+25
+21
+19
+18
+17 +14.5
+2
6.5
0 to 5
+25
+21
+19
+18
+17 +14.5
+5
+1
Tolerance
28
+25
128QAM
26
+29
32QAM
23
16QAM
18
(dB)
0 to 5
5.5
NA
+/3
Submission Prohibited
NEC Internal Use Only
INITIAL LINE UP
ROI-S05750
Procedure
LCT MENU
Alarm/Status
Equipment Setup
Inventory
AUX I/O
Maintenance
Provisioning
Metering
PMON(History)
Maintenance1
Maintenance2
Disconnect the LCT from the IDU after the PMON Clearing has
been finished.
3-41
Submission Prohibited
NEC Internal Use Only
INITIAL LINE UP
ROI-S05750
3-42
42 pages