Test Report
Test Report
Form CS10
Name.
Particulars
of Applicant/
consumer
Address.
Description of premises
Application No. Account No
Owner of premises
From:
.
Wiring Contractors.
.
NoDate
To
THE SUB-DIVISIONAL OFFICER,
Himachal Pradesh State Electricity Board,
Electricity Sub-Division
REPORT
Please note that the electrical installation belonging to the above consumer, as
detailed on Page-2 and 3 is now ready for the Boards test.
The installation was tested by me/us on.(date) and the
insulation resistance was as shown on pages 2 and 3.
Date.Wiring Contractor
[P.T.O]
Size of
Conductor
No.
Wattage
each
Total
Watts
MOTORS
No.
B.H.P.
each
10
Total
KW
11
Total
connected
load on
each
circuit in
kw
12
As per wiring
contractors
test
19
As per
Boards test
20
No.1
No.2
No.3
No.4
No.5
The size of connecting wires between Meter Board & Distributing Board is.
Dated Signature of Working Contractors
[P.T.O]
Please test the installation detailed on pages 2 and 3, fill in columns 16 to 20 and report
as below. It may, however, be ensured that the intimation regarding the date on which you intend to visit
the consumers premises for the above said purpose is given to the consumer or his representative well
in advance so as to enable him to be present at the time of Inspection. Also please ensure that for any
subsequent visit for testing of the said installation necessitated by the consumer on the previous visit or
due to defective installation, the consumer is asked to pay the requisite charges as per the schedule of
general charges and receipt No./date vide which the charges are paid by him is quoted in the report.
Sub-Divisional Officer,
Date.
(B) REPORT
(1)
(2)
ii)
(a)
(b)
The installation was tested by me on my subsequent visit for which the consumer
deposited the amount of Rs.as per the schedule of general charges
vide Receipt No.Date
Signature of ConsumerDate
(or his representative)
Junior EngineerDate