Construction Practices and Quality Control Tests
prepared at a time. Cement mortar or cement concrete shall be used within 30 minutes
after adding water. Providing of or plinth protection is essential for safety of the
foundation of the building
Quality control tests for materials and technology during execution:i.
Sieve analysis and gradation test for fine and coarse sand as per IS 2720
ii.
iii.
iv.
v.
Slump test for RCC work for ascertain water cement ratio in concrete work
particularly at the time of laying RCC slab
vi.
Cement sand mortar test for ascertaining cement and sand contents is the mortar.
Reinforcement
(steel)
C.C.Cube
Compressive strength
dimension
ultimate tensile strength
yield stress (proof )
elongation
compressive strength