Syllabus
Syllabus
ISE
SE-I
SE-II
SEE
Total
Evaluation Scheme
10
20
20
50
100
Course Objectives
1.
To explain method of process management to achieve the targets related to
quality, production and cost, consistently through maintenance of machines
and information technology.
2.
To describe process parameters, work practices and the material handling
systems in weaving preparatory processes in order to manage the
processes
3.
To explain methods to calculate and reduce the hard waste and spare-part
consumption in weaving processes.
4.
To explain application of machine parameters to the weaving machines and
explain machine construction, application of and MIS and IT in weaving
processes to achieve the best performance.
Course Outcomes
At the end of the course students will be able to
1.
Apply method of process management to achieve the targets related to
quality, production and cost, consistently through maintenance of machines
and information technology.
2.
Classify and apply process parameters, work practices and the material
handling systems in weaving preparatory processes in order to manage the
processes.
3.
Apply methods to calculation to reduce the hard waste and spare-part
consumption in weaving processes.
4.
To apply knowledge of machine parameters to the weaving machines and
explain machine construction, application of and MIS and IT in weaving
processes to achieve the best performance.
Unit 1.
A)
B)
Course Contents
Introduction to Process Management:
6 Hrs
Object, scope and approach to achieve quality and productivity in
fabric production,
Methodology adopted for the same (SQC, Direct Approach, and
online monitoring)
Quality and Production Management in Winding:
Control of yarn joints quality on Automatic Winding machines for
various materials knots and splice (characteristics of good splice,
appearance and strength ratings, splice testing, and adjustment of
parameters), precautions in winding of Elastomeric, Dyed,
Monofilament yarn etc
Yarn clearing: Yarn defects, Classimat classification, imperfections,
condition of clearers and its maintenance, assessment of
performance of winding machine (knot factor, clearing efficiency).
Unwinding and winding tension, relation with type of material and
speed, use of (auto tense, auto speed)
Package quality: Causes and Remedies of package defects:
Method of assessing the productivity and adjustments in relation to
material and count of yarn,
Material handling and work practices for optimum production and
quality
Management information system applicable to winding.
Unit 2
Unit 3
Unit 4
Unit 5
A)
Practical
Teaching Scheme
3 Hrs. /Week
Total Credits
1.5
CIE
Total
Evaluation Scheme
50
50
List of Experiments
1
2
3
4
5
6
7
8
9
10
11
12
Optimization of clearer and splicer parameters for different yarn counts and
operate the winding machines to observe the results
To prepare beam on the sample warping and weaving on sample weaving
Preparation of the jacquard design and to weave fault free fabric on loom with
electronic jacquard
To adjust the rapier strokes on flexible and rigid rapier looms
To adjust the twisting angle on Sulzer picking and to optimize the air pressurs
on air jet machine.
To make jacquard design and weave on electronic jacquard loom.
To determine the effect of tension on stitch length on single and double jerky
knitting machines.
Fabric Analysis 2 samples and to determine the cost of woven fabric.
Fabric Analysis 2 samples and to determine the cost of knitted fabric.
To determine the % loss of efficiency for probable reasons through snap study
in the visiting weaving unit
Inspection of fabric defects and determination of the packing percent of the
given Fabric length in the visiting unit
To determine the end breakage rate of warping machine and calculate
warping efficiency with the sett details in the visiting unit.
Submission
1. Completed Journal