0% found this document useful (0 votes)
691 views8 pages

E & I Construction Superintendent

Mohammad Shahnawaz Alam is an Indian national who has over 14 years of experience as an Electrical and Instrument Construction Superintendent in oil and gas projects in the Middle East. He is currently applying for new positions and holds a B.E. in Instrumentation and Control Technology from W.B. University in India.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
691 views8 pages

E & I Construction Superintendent

Mohammad Shahnawaz Alam is an Indian national who has over 14 years of experience as an Electrical and Instrument Construction Superintendent in oil and gas projects in the Middle East. He is currently applying for new positions and holds a B.E. in Instrumentation and Control Technology from W.B. University in India.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 8

CURRICULAM VITAE OF KEY PERSONNEL

NAME:

NATIONALITY
POSITION:

..

.
.

MOHAMMAD SHAHNAWAZ ALAM


INDIAN
ELECTRICAL& INSTRUMENT

Construction Superintendent
:
.
+966515124526/+918809480740
QUALIFICATION:
:
B.E
in
Instrumentation
& Control Technology (1996) from
QUALIFICATION
W.B.UT India.
Mobile No

Construction Superintendent Electrical and Instrumentation


Summary
As an experienced electrical & Instrument Construction Superintendent
with more than 14 years experience in construction of oil & Gas in
Middle East I am applying for a better position anywhere in the world.
Work Experience
Total Experience: +14 years in electrical & Instrument Construction
Superintendent Engineering, construction, Pre-commissioning,
commissioning, start up, Experience in Oil & Gas, Refinery, and
Hydrocarbon & Petrochemicals Project etc.
Construction Management & Contract administrations:
Job safety analysis and risk management in oil and gas on shore
and offshore Installations.
Construction planning for Electrical and instrumentation
installations.
Material selection process ordering receiving and storage.
Factory acceptance schedules, procedures and test (witness and
release of equipment, cables, rotating electrical equipment, MV/LV
MCC and marshalling panels and instrumentation panels.
Engineering support for selection of equipment, components,
lightning systems, Navigation aid and aircraft warning systems, High
voltage cables, and sub-sea cables, connection of cables to
equipment, site survey and decision making up dating drawings,
and as builds.
Hands on experience in complete site management PMC with
compliance of highest safety requirement of the project HSE,
including project engineering, documentations, current electrical
code in authority, and agreement with customer on design
standards and symbols, single line diagrams, flow sheets and P&ID,
Loop drawings, and diagrams, interconnection diagrams, lighting
and ground drawings, schedules and progress charts,
supervision of electrical and Instrumentation activities construction,
pre-commissioning, commissioning and start-up activities, including
installation of electrical and instrumentation cable tray supports, E&I
Mv, Lv, ELv panels MCC installation, well head control panels,
cathodic protection of well head jackets, storage tanks and onshore

Jackets, electrical submersible pumps, up to 650 KW, Variable speed


Drives, soft starters, ABB VFD, Alstom Turbine driven pumps, multi
fuel turbines for generating plant power up to frame five, Multi stage
Gas compressors, 132 KV EHT, 132 / 66 / 33 / 11KV LV HT, and
Medium voltage Sub-Stations, Stand by Emergency Diesel
generators and step-up transformers Up to 30 MVA 33KV/6.6KV,
Power transformers and 6.6KV/415V2.5MVA distribution
transformers, Power Cable Test 34.5KV,45KV,60KV,230KV
Bus-bars and Bus Ducts for Medium voltage and LV up to 5000
Amps, Cable laying, glanding, testing and terminations, Approved
Cable Joints and termination of Medium voltage cables in hazardous
and safe areas, Utility buildings Motors with frames of Exd, eexd IIB
T3 and T4, safe, exhausts fans, area approved
Remote control stations, Plant heaters for process, calibration and
installation of Instruments like PT, LT, TT, FT of branded names like
Rosemount, control valves, shut down valves, Rota meters,
Installation of process tubing, central control room DCS and PCS
installations, Fire and gas panels,
F&G instruments installation, PA/GA instruments installation with
Flashing becons and Hooters, area lighting and illumination,
telemetry panels,
Navigation aid, Aircraft warning systems, SCADA, U.P.S, Battery
banks, and Battery chargers, battery bank installation, installation of
plant and lightning earthing / grounding system (TN, TT, & IT) as per
approved design document, and Instrument Clean earthing, cable
laying, glanding testing and termination,
Site calibration of instruments, trouble shooting and problem solving
in wiring and control panels, Approved deviation acceptance for
suite to site conditions.
Time to time reviewing contractual obligations for timely completion
requirement of each phase of the projects, progress monitoring and
reporting, interaction with higher level management for smooth
completion of projects.
Cost and quality related analysis and system completion and Job
certification as per ISO 9000-2000 and E&I Document control.
Prior to pre-commissioning activities making the construction and
pre-commissioning personal aware of the safety requirement in deenergized and energized conditions of the plant equipment, cables,
for their safety, and implementation of work permit systems for the
Pre-commissioning activities like checks and verification of
construction drawings to the as builds, updating and red line mark
ups if any for the deviations and site routings of cables, panel
wirings, cable laying, design changes.
Non destructive tests like loop checks, IR tests of the cables and
bus-bars, torque tests of electrical cables to the incomer section bus
bars and outgoing cables of the panels, CT and VT tests of the
Medium voltage and Low volt panels ,MCC equipment, relay testing
and settings as per relay co-ordination requirement of the projects
for the safety of the panels, equipment and personal, earth loop

impedance checks for the highest and the lowest equipment of the
plant or in full, as per the approved checks and tests procedures for
the project, Approved test records endorsement of quality control to
the approved relevant check and test sheets of quality control
document, to verify the physical conditions of the equipment, and
ensuring the mechanical completion of the Approved plant subsystems and systems, lock out and tagging of the equipment related
to the sub-systems,
heat tracing sections of the process line and pipe line sections, MCC
sections, Power transformers, MV and LV panels, interlocking
systems between the transformer supply and the feeder panels, and
the relevant MCC sections and the motors, sections of other process
related sub-systems prior to energization, recording the pad lock
Nos. and tags to the document, energizing the lighting systems of
the sub-stations and the plant area lighting, kick start, vibration
monitoring and recording, test runs of plant motors for an hour to 4
hours, recording the temperature variation at the drive end and
driven end, and keeping ready for commissioning the plant sections
sub-systems by sub-systems as per quality plans of the project
quality requirement.
Incoming source of power supply shall be given the preference since
the source of power shall be from the nearby power station or from
the nearest sub-station controlled by the national electrical power
distribution authority. Ensuring the safety requirement and coordination between the national electrical power distribution
authority and the new plant Senior authorized person of the new
plant along with the permit to work papers signed by the HSE
department for the downstream power source and the cable to the
plant incomer panel can be put in to service first.
Co-ordination between the client and the vendors of the equipment
supplied for any clarifications and training the plant personals as per
contract agreement, once the mechanical completion acceptance is
signed off by the concerned personals, the Dynamic verification of
the sub-systems and systems for Commissioning shall be done as
per the agreement with the client
Familiar with international standards likes IEC, IEEE, NEMA, NEPA,
NEC,UL, API and SAUDI ARAMCO, SATROP, SABIC,KOC, KNPC, PDO,
GASCO, Standards.
DAELIM/SENDAN Internl. SAUDI ARABIA

As a Construction Superintendent Electrical & Instrument at


SADARA-ISO, Jubail-2, KSA

JOB RESPONSIBILITY

Ensure that all work is carried out to the highest standards of HSE in
accordance with the Project, Client and Company standards. Ensuring the
monitoring of subcontractor activity is ongoing and complying with the
HSE requirements.

Organise supervisors to monitor and expedite and supervise where


possible all subcontractors discipline activities.
Prepare and Conduct daily meetings with main client and with Top
Management of EPC.
Daily meetings conducted with staff to clear and resolve any issues with
EPC to enable the project top are completed on time, and in accordance to
specification and regulation.
Estimate and schedule construction and work to make the best use of
manpower and other resources to comply with maintenance and
construction deadlines, to specifications.
Clear and resolve Engineering design issues with the engineering
department and material issues that EPCS have with the supply or design.
.
Writing of site instructions to EPCS for additional work that is not within
their scope to perform.
Preparing of progress reports daily to monitor the productivity to the
client to ensure the project is completed on time.
Clearing of any issues with vendors and their equipment installed on site
and Managing work being commissioned.
Managing the commissioning of switchgear and equipment installed by
contractors and the vendors
Conducting safety walks with HSSE through the plant on a regular basis to
ensure that a high standard of health safety is maintained Authorized by
SADARA to sign work permits and TSTIS (Total Safety Task Instructions)
Safety courses attended
Safety induction,
TSTI (Total Safety Task Instruction)
PTW,
Electrical Awareness,
Working with extreme heights and use of Scaffolding.
Establishing a Safe and healthy Environment
Excavation Awareness,
Working and coping in extreme Heat Condition,
Housekeeping and waste.
SAMSUNG/SAM YOUNG ABU DHABI

As a Construction Superintendent Electrical & Instrumentation at


Shah Gas ( SGD Abudhabi UAE.
JOB RESPONSIBILITY
Construction Field Installation of All Instruments, Calibration of
Process Instrument for Temperature, Low-Pressure & Level such as
Transmitter Gauges Switches Control Valves, Analyzers Etc.
Transformers, Motors, MCC,MCB LCP Cables Installation Testing
Commissioning
Co- Ordination with Pre- Commissioning, Commissioning team
during Foundation Test.
Organizing the loop check, Planning of Pre- Loop Check,
Rectification of Any Loop Which is Malfunctioning,

Training The Technicians, about HART and Foundation Field Bus


Communicators ( 375,275) of Rosemount how to Performs The Loop

Check by Feeding the Signals Through HART/FF Devices From Field


Instrument To DCS and To Carry Out Effective Loop Check Loop
Checking of the safety Interlock, As per Instrument Loop Diagram
( ILD).
Provide Guideline and Instruction to carry Out Pre- Installation
Calibration of Instrument with Proper Calibration of the Instrument
Having Tractability specification Sheet (ISS) With Proper Test
Equipment Having Tractability of its accuracy. Carry out
Commissioning Activities of the Instrument on The completion Of
the Construction for Star Up. Prepared as Built drawing after
Completion of the Commissioning and Handed over to Client.
NESMA & PARTNER SAUDI ARABIA

As a Construction Superintendent E & I at Jubail Export Refinery Project


(SATROP)
JOB RESPONSIBILITY
Power Cable 34.5KV,45KV,60KV,230KV Hi-Poit, VLF Test
Installation of Marshalling Cabinets, Delta V DCS Cabinets, ESD
Cabinets VMS Cabinets, EIRP Cabinets Etc.
Coordination Switch vendors during installation of I/O Card, Deltas V
Foundation Field H1 Interface Cards, Controller Etc.
Field Installation of All Instruments, Calibration of Process
Instrument For Temperature, Low-Pressure & Level such as
Transmitter Gauges Switches Control Valves, Analyzers Etc.
Co- Ordination with Pre- Commissioning, Commissioning team
during Foundation Test.
Organizing the loop check, Planning of Pre- Loop Check, Rectification
of Any Loop Which is Malfunctioning,
Training The Technicians, about HART and Foundation Field Bus
Communicators ( 275,275) of Rosemount how to Performs The Loop
Check by Feeding the Signals Through HART/FF Devices From Field
Instrument To DCS and To Carry Out Effective Loop Check Loop
Checking of the safety Interlock, As per Instrument Loop Diagram
( ILD
Provide Guideline and Instruction to carry Out Pre- Installation
Calibration of Instrument With Proper Calibration of the Instrument
Having Tractability of Its specification Sheet (ISS) With Proper Test
Equipment Having Having Tractability of its accuracy.
Carry out Commissioning Activities of the Instrument on The
completion Of the Construction for Star Up.
Prepared as Built Drawing After Completion of the Commissioning
and Handed Over To Client.
SAMSUNG ENGINEERING SAUDI ARABIA

As a Construction Superintendent E & I Project FCC, SATROP


JUBAIL
JOB RESPONSIBILITY

Fields Instrument , Heater & Gas Turbine, Storage Tank & Scrubber
Containing HP/ LP System Related Instrument Vibration Having
Extensions, Knowledge of DCS, PLC & UPS, System and Shutdown
Problems in the Instrument Having Extension, instrument Like FT,
PT, LT, ATAT, Interface LT Rosemount, fisher, Magnet Roll, Mason,
Lien, Foxboro, & Honeywell, Loop Checking Commissioning & PreConditioning Testing of Electronics & Pneumatic
Controller, Float System , Level Gauge and Varack Gauges Etc.
Performs construction Quality control activities in instrument
discipline in technical and/ or administration capacity, interfacing
with a multi- discipline operation, Confirms I Installation of Field
instrument Local Control Panel, Junction Box, Marshalling Panel,
Interposing relay panel, motor control center, DCS Console as Per
Approves location plan Receives inspect and review documents
pertaining to instruction activities/ Inspection likes installation of
various types of instrument such as Flow, Level Pressure,
Temperature, analytic instrument , process Switches, & Control
Valves,
J.B & panel Termination supports & trey Brackets, airline &
Instrument Tubing Complete Knowledge of P & ID Layouts data
sheets material lists Etc.
LG ENGINEERING & CONSTRUCTION CORP KUWAIT
As a E & I ENGINEER PROJECT K N P C. Mina Al Ahmadi Refinery Kuwait

JOB RESPONSIBILITY
Co-ordination in all aspects of index, cable schedule, installation &
Loop drawings, logic drawings etc.
Review and comments on vendor documentation providing the
vendors with the necessary application data and support.
Attend initial package Kick-off meetings. Review and approval of the
vendors overall detailed engineering design with respect to the
instrumentation and control system activities, to ensure compliance
with the scope of work and current specifications, standards and
regulations.
Preparation and Updating of Daily Progress Report for Construction,
Monitoring day to day site activities, manpower, equipment and
keeping the Project Manager updated on these issues.
INSTRUMENTS HANDLED:Smart Rosemount, Foxboro, Honeywell Transmitter, Special Flow,
Meters, Micro Motion Mass Flow, Meters, PD, Meters, Foxboro
Computers Bentley Nevada Vibration Monitors, Maasonelian Fisher
Interface Level troll Limit torque, Rotorque Motor operated Valves,
Ohm art Nuclear Level Measuring System, Thermal Turbine Vortex
Electro Magnetic Flow Measuring System, loss In Weigh System,

( 6832 Intelligent Processor ) Flow computers ( Schlumberger)


Various Field Instrument Control Valves Like Melees James Burry
Fischer and Masan lien Etc Mall ere Bagging Machine : Libra Scale,
Check wig her, Metal Detector Domino Printer Like Various Special
Instrument.
ELECTRICAL:-Hands on Experience as an assistant Engineer
(Electrical)
projects:
Construction, Cable test Hi-Poit & Pre-com, & commissioning of
66/33KV substations
33KV / 6.6KV 20MVA and 6.6KV 440 V
2.5MVA
power
transformers,800KVA,
500KVA
distribution
transformers, 33KV,6.6KV MV / 440V LV panel, MCC Exhaust fans,
Motors & Pumps 3phase and 1 phase, Conveyor belt systems,
Distribution boards, Marshalling cabinets, UPS systems and Battery
bank 220VAC, Split unit Air conditioners, Street lighting and Indoor
plant lighting, PA/GA systems installation, Fire alarm system &
firefighting
equipment
installation,
diesel
firewater
pump
installation, CNC machines and controls installation for the Keltron
Manufacturing units.
I hereby certify that all information is true and correct to the best of
my knowledge and beliefs.
EXPERIENCE DETAILS:

1.

COMPANY: DAELIM/SENDAN Internl.SAUDI ARABIA


POSITION:

Construction Superintendent E & I

DURATION: 12 December 2013 to at present


PROJECT:
2.

SADARA-ISO, Jubail-2, KSA

COMPANY: SAMSUNG/SAM YOUNG ABU DHABI

Construction Superintendent E & I


DURATION: 04 August 2012 to 06 Nov. 2013
PROJECT1: SHAH GAS ABU DHABI
3. COMPANY: NESMA & PARTNER SAUDI ARABIA

Construction Superintendent E & I


DURATION: 15 Oct, 2010 to 05 Jul, 2012
PROJECT: Jubail Export Refinery Project

(SATROP)

4. COMPANY: SAMSUNG ENGINEERING SAUDI ARABIA

Construction Superintendent E & I


DURATION: 23 March, 2005 to 23 August, 2009

PROJECT:

FCC, SATROP JUBAIL

5. COMPANY: LG ENGINEERING & CONSTRUCTION CORP KUWAIT


POSITION: E & I ENGINEER
PROJECT: K N P C. Mina Al Ahmadi

Refinery Kuwait

DURATION: 12 Feb, 2002 to 04 Dec, 2004


6. POSITION:

INSTRUMENT SUPERVISOR

COMPANY: GLFAR ENGINEERING CONTRACTING LLC OMAN


PROJECT:

PDO Power Station EPC Saih Rawal, Oman

DURATION: 18 May 1997 to 20 June 2001

PERSONAL INFORMATION
Name
: Mohammad Shahnawaz Alam
Contact no

Email id

00918578907782/8809480740
:

[email protected]
Date of Birth

Marital Status :

05-01-1974
Married

Nationality

Indian

Religion

Islam

Language

ENGLISH & HINDI, ARABIC

PASSPORT DETAIL: Passport No: Passport No- L-9323884, Date of

Expire- 25.06.2024, Place of Issue RIYADH (K S A)


Driving License: Saudi Arabia License No-6822695, Expiry Date
03/12/2021.

Mohammad Shahnawaz Alam

You might also like