Introduction
The Product Quality Lifecycle Implementation (PQLI)
initiative [7] was launched by ISPE to help industry
identify global solutions to the challenges in implementing
ICH Q8, Q9 and Q10 guidance [3, 5, 6], and to provide the
technical framework for the implementation of key elements of Quality by Design (QbD) [1, 2, 8, 9, 11, 14, 15].
QbD is a systematic approach to product and process
design and development. One of the key elements is design
and implementation of a Control Strategy.
Control Strategy is defined in the ICH Q10 (Step 2) [6]
document as:
A planned set of controls, derived from current product
and process understanding that assures process performance and product quality. The controls can include
parameters and attributes related to drug substance and
drug product materials and components, facility and
equipment operating conditions, in-process controls,
finished product specifications, and the associated
methods and frequency of monitoring and control.
This Control Strategy for a particular product should be
established within the framework of the overall Pharmaceutical Quality System (PQS). The Control Strategy is a
comprehensive plan for ensuring that the final product meets
critical requirements, and therefore the needs of the patient.
Elements of a Control Strategy can include (but are not
limited to) the following:
96
&
&
&
&
&
&
Control of input material attributes (e.g., drug substance, excipients, primary packaging materials) based
on an understanding of their impact on process-ability
or product quality
Product specifications
Procedural controls
Facility controls, such as utilities, environmental systems and operating conditions
Controls for unit operations that have an impact on
downstream processing or end-product quality (e.g. the
impact of drying on degradation, particle size distribution of the granulate on dissolution)
A monitoring program (e.g., full product testing at regular
intervals) for verifying multivariate prediction models
&
&
97
98
Control
Strategy
Level 1
Control
Strategy
Level 2
Control
Strategy
Level 3
PATIENT
BUSINESS
Product:
Product:CQAs
CQAs
For
Forpatient
patientsafety,
safety,
efficacy
efficacyand
andquality
quality
(as
(asICH
ICHQ8/Q6a)
Q8/Q6a)
Other
OtherProduct
ProductAttributes
Attributes&&
Business
BusinessRequirements
Requirements
e.g.
e.g.cost,
cost,safety,
safety,
environmental,
environmental,
manufacturability
manufacturability
Controls
Controlsto
toEnable
Enable
Product
ProductCQAs
CQAsto
tobe
bemet
met
e.g.
e.g.CPPs,
CPPs,material
material
attributes
attributes&&components,
components,
equipment
equipmentand
andfacility
facility
operations
operationsthat
thatmust
mustbe
be
monitored
monitoredor
orcontrolled
controlledto
to
achieve
achieveproduct
productCQAs
CQAs
Other
OtherControls
Controls
Other
Otherparameters
parametersand
and
material
materialattributes
attributes&&
components,
components,equipment
equipment&&
facility
facilityoperations
operationsthat
that
must
mustbe
bemonitored
monitoredor
or
controlled
controlledto
toachieve
achieve
other
otherproduct
productattributes
attributes&&
business
businessrequirements
requirements
Analytical,
Analytical,Engineering
Engineering&&Other
OtherControl
ControlMethods
Methods
Analytical
Analyticalmethods
methods(off
(offline,
line,at-line,
at-line,in-line,
in-line,or
oron-line)
on-line)
Equipment
Equipmentand
andfacility
facilityengineering
engineeringcontrols
controls
PAT
PAT(including
(includingprocess
processmodels
modelsand
andcontrol
controlmodels)
models)
Automation
Automationand
andmanual
manualcontrols
controls
Procedures
Procedures
PQS (ICH
Q10) incl
GMPs
Systems
to
facilitate
other
business
controls
Journal of Pharmaceutical Innovation. As process understanding and product and process experience grow, this
knowledge can be applied to continuously improve the
process (ICH Q10). An attribute that was thought to be
non-critical may turn out later to be critical, or vice versa.
Companies will typically determine what is critical or
otherwise based on a risk assessment and then develop a
Control Strategy from this basis to ensure the product
remains within the Design Space. Note that a Control
Strategy or test does not make a CQA or CPP non-critical;
but rather makes it controlled.
Some companies may choose several levels of criticality
to describe multiple levels of risk, e.g. the use of the terms
key or important as well as critical and noncritical. For example, as process parameter boundaries
approach edges of the proven acceptable range (PAR) or
failure point, if known, the level of criticality normally
increases with the level of risk. Companies may decide to
define an additional category to address those parameters
that are lower risk than for critical process parameters e.g.,
a product parameter is well controlled in relation to the
required boundaries and is of lower risk, and therefore
would only be described in the Pharmaceutical Quality
System.
Control Strategy Level 2 considers the means by which
the CQAs and other business requirements determined at
Control Strategy Level 1, will be assured e.g. what
attributes of the starting materials, reagents, solvents,
process aids etc. must be monitored or controlled, and
what parameters and operating conditions of the process
equipment and manufacturing facility need to be monitored
or controlled to ensure the objectives defined at Control
Strategy Level 1 are achieved.
CQAs can be measured and evaluated directly or,
alternatively, indirectly for raw material or other material
attributes identified to impact the CQAs. The control of all
CPPs and those process parameters contained in the
intermediate category (if applicable), should ensure the
CQAS are being delivered and hence the process is
maintained within the Design Space
At Control Strategy Level 3 the analytical and other
controls methods are described. The information will
include the measurement technologies for the material
attributes or equipment parameters (off-line, at-line, in-line
or on-line), univariate or multivariate process models and
control models, as well as procedural and engineering
controls of the plant including automation systems, closed
control loops, normal operating ranges, and alarms.
Note that controlling plant and equipment covers both
sides of the model and, practically, cannot be separated (e.g.
a PLC, a plant controller or a data capture system will be
set up to control all parameters). There will not be two
separate engineering control systems, such as one for
99
&
&
&
&
&
100
&
&
&
&
&
&
&
101
CPP1 = Temperature
CPP2 = pH
CPP3 = Reaction End-point
102
&
&
Control of
Process
Impurities
2
3
Patient
Business
Business
Control
of Cost
1
2
Starting Material 1
Control of
Metal
Content
Reaction 1
Reaction 2
Reaction 3
Crystallisation
Starting Material 2
Starting Material 3
Starting Material 4
Patient
1
2
Patient
Finished Product
CQAs and Business
Requirements
Business
Business
Control of
Oxygen
Content
1
2
1
2
3
Control of
Metal
Content
Test Methods and
Specifications
Excipient 1
Formulation
Filling
Packaging
Excipient 2
Patient
Excipient 3
Nitrogen
Business
1
2
Control of
Oxygen
Content
Finished
Injection
Patient
Business
Impurities:
Oxidative
Degradants
Cost
&
&
&
103
References
1. Product Quality Lifecycle Implementation: Practical Approach to
QbD, ISPE Washington Conference, Arlington, VA, June 67,
2007.
2. Product Quality Lifecycle Implementation (PQLI): Practical
Approach to Quality by Design, ISPE 2007 Berlin Conference,
Berlin, Germany, 19-September-2007.
3. International Conference on Harmonisation of Technical Requirements for Registration of Pharmaceuticals for Human Use, ICH
104
4.
5.
6.
7.
8.
9.
10.