Internship Report Format
Internship Report Format
Vikash Kumar
in partial fulfillment for the award of the degree
of
BACHELOR OF TECHNOLOGY
in
MECHANICAL ENGINEERING
DECLARATION
I hereby declare that work entitled summer training project report, Submitted towards
completion of vocational training after Third year of B.Tech (MECHANICAL ENGINEERING)
at SIR PADAMPAT SINGHANIA UNIVERSITY comprises of my original work pursued
under the supervision of guides at Bharat Wagon & Engineering Co. Ltd. The Project
embodied in this report have not been submitted to any other Institute or University for the
fulfillment of any other curriculum.
2Vikash
This is to certify that Mr Candidate Name has completed the industrial internship at Coastal
Gujarat power limited for 30 days and reported the work as per university guidelines.
Signature
Supervisor Name
Supervisor
Dept. of Mechanical Engineering
SPSU, Udaipur.
3Vikash
Training/Intership Certificate
4Vikash
ACKNOWLEDGEMENT
5Vikash
ABSTRACT
6Vikash
CONTENTS
Title
Chapter 1
Chapter 2
Chapter 3
Page No
Introduction
1.1 About CGPL
8
10
12
Boiler
3.1 Definition and working principle
3.2 Types of boilers
3.3 Supercritical boiler advantages
3.4Economizer
3.5Superheater
3.6 Reheater
3.7Air preheater
14
14
15
17
18
19
19
3.8 Deaerator
Chapter 4
Chapter 5
20
Electrostatic precipitator
4.1 Definition and working principle
4.2 Application
4.3 Smoke stack
Turbine
5.1 Definition
5.2 Type of Turbine used in CGPL
7Vikash
21
21
22
23
24
Generator
6.1 Definition and Working principle
Chapter 7
26
27
27
27
Transformers
7.1 Definition
29
29
Chapter 8
Condensor:8.1 Definition
30
8.2 Parts of Condensor
30
8.3 Gland Steam Condenser (GSC)
31
8.4 Duplex LPH (1A/2A & 1B/2B) (Inside condenser) 32
Chapter 9
Coal Handling Plant
9.1 Purpose of coal handling system in a power plant
33
9.2 Divisions of Coal Handling system in CGPL,Mundra 33
9.3 Coal tonnage requirement for CGPL, Mundra
34
9.4 Layout of Internal Coal Handling System
35
9.5 Equipment & components of ICHS
36
9.7 Control Desk at ICHS control room
37
9.8 Operational modes of the conveyor
38
9.8Conveyor Belts
39
9.9 Stacker and Reclaimer
41
9.10 Reclaimer
43
9.11 DFS (Dry fog system)
44
9.12 Different Switches
44
9.13 Components used in Coal handling plant
45
9.14 Travelling Tripper
48
Chapter 10
Project under Taken
10.1 Stacker and Reclaimer
50
10.2 Travelling tripper
58
Safety and precautions.
61
Conclusion.
62
Future Scope.
63
References.
64
8Vikash
FIGURE LIST
Figure
Page NO
2
6
7
8
Figure 2.3
Figure 2.4
Figure 2.5
10
Figure 2.6
Condensate System
11
Figure 2.7
12
13
Figure 3.1
16
Figure 3.2
Economizer
17
Figure 3.3
Superheater
18
Figure 3.4
Reheater
19
Figure 3.5
Air preheater
20
9Vikash
Figure 4.1
Electrostatic precipitator
22
Figure 4.2
Smoke stack
23
Figure 5.1
LP turbine
25
25
26
28
29
30
31
32
35
35
36
40
41
43
44
45
47
49
50
51
52
53
54
55
56
57
58
59
60
10Vikash
LIST OF TABLES
Table 1 Difference between Subcritical and Supercritical boilers
15
39
11Vikash
CONCLUSION
FUTURE SCOPE:
REFERENCES
http://www.mapsofindia.com/kota/industries/super-thermal-power-plant.html
http://en.wikipedia.org/wiki/Thermal_power_station
www.thermalengineering.com
http://www.energymanagertraining.com/power_plants/ThermalPowerPlants.htm
www.tatapower.com
https://en.wikipedia.org/wiki/Tata_Power
BOOKS