(b) How will you do various stages of investigation and collect preliminary details for construction of
bridges.
1
(C) 12.(a)
(C)
: 5m
: M30 concrete and Fe 415 steel
(A) 13.(a) Explai the design principles of box girder bridges with neat sketches.
n
OR
(b) Enumerate the design principles of balanced cantilever bridges.
16
16
(C)
(C)
14 (a) Design the main girder of a pretensioned continuous bridge to suit the following data:
1
Two continuous span of 60m each
Width of road is 7.5m
Wearing coat thickness is 80 mm
Loading IRC Class A vehicle.
Loss ratio 0.80
OR
(b) A post tensioned prestressed concrete bridge deck has the following data:
16
Clear span = 10m
Width of bearing = 400mm
Clear width of roadway = 7.5m
Footpath on either side = 1m
Thickness of wearing coat = 80mm
Live Load = IRC Class AA tracked vehicle
Design the deck slab for bending only. Assume M40 concrete and 7mm diameter HTS wires with
an ultimate tensile strength of 1500N/Sq.mm housed in cables with 12 wires and anchored by
Fressinet anchorage of 150 mm diameter. Loss ratio is 0.80
(C) 15. (a) Design a plate girder in B.G track to suit the following data:
Span of the bridge :25m
Dead load for the track :7.5KN/m
EUDL for B.M = 2410 KN
EUDL fro S.F = 2410KN
OR
(C)
(b)
Check the stability of the abutment with the following data:
Top width is 1.5m
Height = 4m
Back batter = 1 in 6
Front face of the abutment is vertical.
Material: Stone masonry
Unit weight of soi = 18 KN/Cu.m
Angle of repose = 30
Super structure = T- Beam bridge of span 15m
Loading : IRC Class AA tracked vehicle.
Assume any other suitable dimensions required