0% found this document useful (0 votes)
226 views

C TSCM62 64 Dump Sample

The document contains 16 multiple choice questions about order fulfillment processes in SAP ERP, including availability checks, material determination, free goods, billing, and document cancellation. Key points covered include when availability checks are performed, how zero stock can be confirmed, how the user is alerted about unavailable stock, factors that influence availability checks, definitions regarding material determination and free goods, how billing types control account determination, standard split criteria in billing creation, and which statements regarding billing due lists and document cancellation are correct.

Uploaded by

greatsivakrish
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
226 views

C TSCM62 64 Dump Sample

The document contains 16 multiple choice questions about order fulfillment processes in SAP ERP, including availability checks, material determination, free goods, billing, and document cancellation. Key points covered include when availability checks are performed, how zero stock can be confirmed, how the user is alerted about unavailable stock, factors that influence availability checks, definitions regarding material determination and free goods, how billing types control account determination, standard split criteria in billing creation, and which statements regarding billing due lists and document cancellation are correct.

Uploaded by

greatsivakrish
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5

C_TSCM62_64

SAP - C_TSCM62_64
SAP Certified Application
Associate - Order
Fulfillment with SAP ERP
6.0 EHP4

http://Xcerts.com

C_TSCM62_64

QUESTION: 1
The availability check (ATP) is carried out based on which of the following dates?
A. The material availability date
B. The transportation planning date
C. The goods issue date
D. The loading date
Answer(s): A

QUESTION: 2
In the system, it is possible to have zero stock available and still receive a confirmed schedule
line in the sales order. Which of the following states the reason for this confirmation?
A. Stock will be taken from another delivery at the shipping point.
B. The system automatically searches other plants for inventory and transfers this inventory to
the plant with zero inventory in the sales order.
C. The availability check that was carried out included a replenishment lead time in the scope of
check.
D. A stock transfer will be created by inventory management when you save the sales order.
Answer(s): C

QUESTION: 3
During sales order processing, a user will be alerted when stock is not available for material
entered in the sales order if the availability check was carried out. In which of the following ways
will the user be alerted about this situation?
A. An error message will appear on the status bar alerting the user to the situation.
B. The schedule line will be marked and highlighted by the system.
C. The availability control screen will be displayed.
D. The incompletion log will display the unconfirmed schedule line as a missing field.
Answer(s): C

QUESTION: 4
Which of the following elements can directly influence whether an availability check will be
performed? Note: There are 3 correct answers to this question.
A. The schedule line category in the sales document
B. The item category in the delivery document
C. The check group in the material master
D. The item category in the sales document
E. The sales document type
Answer(s): A, B, C

http://Xcerts.com

C_TSCM62_64

QUESTION: 5
Which of the following statements regarding material determination are correct? Note: There are
2 correct answers to this question.
A. Condition tables must be defined in Customizing (IMG).
B. The definition of the substitution reason determines whether a manual or an automatic
substitution process should be used.
C. The material determination procedure is assigned to a combination of sales areas, customer
pricing procedures, and document pricing procedures.
D. The relevant substitution reason is specified in the access sequence.
Answer(s): A, B

QUESTION: 6
Which of the following statements regarding the free goods process is correct?
A. Free goods with exclusive bonus quantity will always create a subitem.
B. Free goods with inclusive bonus quantity will always take place without a subitem being
generated.
C. The free goods calculation rule only allows for whole unit free goods bonus increments.
D. Free goods with exclusive bonus quantity must contain the same material for the ordered
goods and the free goods.
Answer(s): A

QUESTION: 7
You want to restrict what materials a customer can order. What do you use to achieve this?
A. Material group
B. Assortment module
C. Material listing
D. Product hierarchy
Answer(s): C

QUESTION: 8
The entry for the assignment of the incompleteness procedures to the sales document types
contains the following information: Sales Type: OR Description: Standard Order Procedure: 11
Description: Sales Order Field: IC-dialog is flagged. Which of the following conclusions can you
draw from this entry?
A. Incomplete standard orders must be released in a dialog for further process steps.
B. Procedure 11 specifies which fields in standard orders (header data) are checked for
completeness and order type OR cannot be saved if any of the fields are incomplete.
C. Incomplete standard orders can be saved after a warning message (dialog) appears.
D. Incomplete standard orders can be saved.
Answer(s): B

http://Xcerts.com

C_TSCM62_64

QUESTION: 9
Which of the following SAP NetWeaver components realizes cross-system application
processes?
A. SAP Exchange Infrastructure (SAP XI) / SAP Process Integration (SAP PI)
B. SAP Master Data Management (SAP MDM)
C. SAP Enterprise Portal (SAP EP)
D. SAP Business Warehouse (SAP BW)
Answer(s): A

QUESTION: 10
Which of the following SAP NetWeaver components ensures company-wide unification of data
and information in heterogeneous IT environments?
A. Business Warehouse
B. Knowledge Management
C. Enterprise Portal
D. Master Data Management
Answer(s): D

QUESTION: 11
Which of the following Service Desk features provides all the functions to analyze and monitor
an entire SAP solution centrally?
A. root cause analysis
B. Implementation Roadmap
C. SAP Notes
D. SAP Solution Manager diagnostics
Answer(s): D

QUESTION: 12
Which of the following is controlled by the configuration of the billing type?
A. How account determination should take place.
B. How the item category within the billing document will be determined.
C. If a billing plan will be determined when using this billing type.
D. If order related billing is supported when using this billing type.
Answer(s): A

QUESTION: 13

http://Xcerts.com

C_TSCM62_64

Which of the following data elements represent standard split criteria in billing creation? Note:
There are 3 correct answers to this question.
A. Material group
B. Billing date
C. Terms of payment
D. Payer
E. Order reason
Answer(s): B, C, D

QUESTION: 14
Which of the following statements regarding the processing of the billing due list are correct?
Note: There are 3 correct answers to this question.
A. The billing due list is used to process sales orders and deliveries that are due for billing.
B. The billing due list is used for the periodic creation of billing documents.
C. You can only use the billing due list to process documents due for billing on the same date.
D. Only the general billing interface can be used for processing the billing due list.
E. There are various selection criteria available for processing the billing due list, such as soldto party, sales organization and shipping point.
Answer(s): A, B, E

QUESTION: 15
A customer is to be billed on the last day of the month, regardless of which day of the month the
order and delivery are processed. Which of the following procedures will fulfill this requirement?
A. Maintaining a customer-specific billing due list variant and scheduling a periodic job.
B. Maintaining a factory calendar with a single date per month and assigning it to the customer
master record of the payer.
C. Maintaining a billing date profile and assigning it to the sales document type.
D. Using the condition technique, assigning a billing date determination profile to the customer
master record of the payer.
Answer(s): B

QUESTION: 16
Which of the following statements regarding the cancellation of billing documents are correct?
Note: There are 2 correct answers to this question.
A. Billing documents created in a collective billing run cannot be reversed.
B. When saving the cancellation document, the corresponding posting is automatically executed
in Financial Accounting.
C. The cancellation of a billing document leads to resetting the billing status of the originally
billed delivery or sales order.
D. When creating the cancellation document, it is possible to change the pricing conditions.

http://Xcerts.com

You might also like