Summary of Estimate: Item Details Item No Amount (RS.) Weightag e Percentag e (%) Remark S
Summary of Estimate: Item Details Item No Amount (RS.) Weightag e Percentag e (%) Remark S
Summary Of Estimate
Item
No
Item Details
Weightag
Amount
e
Remark
(Rs.) Percentag
s
e (%)
Foundation Work
#REF!
#REF!
Superstructure Work
#REF!
#REF!
Finishing work
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Total Cost
#REF!
852.63
#REF!
ViVitSHA Associate
Sq.ft
lding
ViVitSHA Associate
Date:- 2066 - 12 - 1
Particulars
No
.
Measurement
No Leng Brea Heig
.
th
dth
ht
(ft.) (ft) (ft)
Quantity
(Cu.ft.)
Remarks
S.
Abstract of cost
Uni
t
Rate
Amount
Rs.
Rs.
Site clearance
400
WALL
Wall
### 2.00
2.00
1296.00
1296.00 Cft
Total
3
### 2.00
0.50
Total
### 2.00
0.50
Total
27,520.56
285.39
92,466.36
140.00
###
285.39
46,233.18
338.57
###
324.00
324.00 Cft
Total
324.00 Cft
### 2.00
2.00
1296.00 Cft
Total
1296.00 Cft
0.25
162.00 Cft
Total
162.00 Cft
Total
162.00
Cft
300.0 0.83
5.00
1245.00
1245.00 Cft
Total
8
324.00 Cft
Stone masonry
Work (1:6)
For wall
84.94
324.00
17,379.36
324.00 Cft
Total
13.41
1296.00 Cft
1245.00
Cft
Wall
###
5.00
3000.00
Sq
ft
Sq
278.81
29.74
8,291.82
m.
TOTAL COST 786,959.1
Water-supply and sanitary Installation (2.5% of the
19,673.98
civil work)
TOTAL ESTIMATED COST OF THE PROPOSED BUILDING
###
Net Plaster work for
3000.00