ICS Form
ICS Form
3. Organization Chart
1. Incident Name:
Date To:
Liaison Officer
Click here to enter text.
Operations
Section Chief
Click here to enter text.
ICS 207
Planning
Section Chief
Click here to enter text.
Logistics
Section Chief
Click here to enter text.
Finance/Admin
Section Chief
Click here to enter text.
IAP Page
4. Prepared by:
Name:
Position/Title:
Signature:
Date/Time:
ICS 207
Incident Organization Chart
Purpose.The Incident Organization Chart (ICS 207) provides a visual wall chart depicting the ICSorganization position
assignments for the incident. The ICS 207 is used to indicate what ICS organizational elements are currently activated
and the names of personnel staffing each element. An actual organization will be event-specific. The size of the
organization is dependent on the specifics and magnitude of the incident and is scalable and flexible. Personnel
responsible for managing organizational positions are listed in each box as appropriate.
Preparation. The ICS 207 is prepared by the Resources Unit Leader and reviewed by the Incident Commander.
Complete only the blocks where positions have been activated, and add additional blocks as needed, especially for
Agency Representatives and all Operations Section organizational elements. For detailed information about positions,
consult the NIMS ICS Field Operations Guide. The ICS 207 is intended to be used as a wall-size chart and printed on a
plotter for better visibility. A chart is completed for each operational period, and updated when organizational changes
occur.
Distribution. The ICS 207 is intended to be wall mounted at Incident Command Posts and other incident locations as
needed, and is not intended to be part of the Incident Action Plan (IAP). All completed original forms must be given to the
Documentation Unit.
Notes:
The ICS 207 is intended to be wall mounted(printed on a plotter). Document size can be modified based on individual
needs.
Also available as 8 x 14 (legal size) chart.
ICSallows for organizational flexibility, so the Intelligence/Investigative Function can be embedded in several different
places within the organizational structure.
Use additional pages if more than three branches are activated.Additional pages can be added based on individual
need (such as to distinguish more Division/Groups and Branches as they are activated).
Block
Number
Block Title
Instructions
Incident Name
Operational Period
Date and Time From
Organization Chart
Prepared by
Name
Position/Title
Signature
Date/Time