Work Plan: Schedule Activity Start Date Finish Date

The work plan outlines crack repair activities for Al Arif Contracting to be completed between April 10-16. Abdul Rahim is named project engineer and will oversee a team of one mason and one driver. The schedule includes mobilizing to site on April 10, surveying cracks, preparing the repair material, sealing cracks, and demobilizing on April 16. Abdul Rahim is authorized to delegate tasks and communicate with the client, and must submit a work inspection request to the consultant for approval upon completion.

Uploaded by

Ibrahim Mohammed
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
122 views

Work Plan: Schedule Activity Start Date Finish Date

The work plan outlines crack repair activities for Al Arif Contracting to be completed between April 10-16. Abdul Rahim is named project engineer and will oversee a team of one mason and one driver. The schedule includes mobilizing to site on April 10, surveying cracks, preparing the repair material, sealing cracks, and demobilizing on April 16. Abdul Rahim is authorized to delegate tasks and communicate with the client, and must submit a work inspection request to the consultant for approval upon completion.

Uploaded by

Ibrahim Mohammed
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

Work Plan

Project No.:
Client:

Al Arif Contracting

Work Description

Sagging

Schedule
ID
ACTIVITY

START DATE

1 Packing

FINISH DATE
9-Apr-16

9-Apr-16

10-Apr-16

10-Apr-16

10-Apr-16

10-Apr-16

10-Apr-16

10-Apr-16

10-Apr-16

10-Apr-16

10-Apr-16

10-Apr-16

10-Apr-16

10-Apr-16

Mixing of repair material

10-Apr-16

10-Apr-16

Sealing of cracks

10-Apr-16

10-Apr-16

10-Apr-16

10-Apr-16

Submision of Work Inspection Request


to Consultant through Client's Engineer

10-Apr-16

10-Apr-16

Obtain Approval for Completed Works

10-Apr-16

10-Apr-16

10-Apr-16

10-Apr-16

Mobilization to site

2
Notification of Client's Engineer, PM,
and Consultant of commencement of
3 work

Submission Method statement and TDS


to consultant (if required)

Survey and identification of cracks to


5 repair
Opening up of identified cracks

6
7 Cleaning of opened cracks
8
9

Final Inspection/Making good of works

10 completed

11
12

13 De-mobilize from site


Project Team
Name

S/No

Responsibiity

1 Abdul Rahim

Project Engineer

Mason

Driver

Authorization

Abdul Rahim is named Project Engineer for the crack repair. He is hereby authorized to delegate responsibilities
within the framework of the project, and to communicate with the client team and management, as required, to
completion of the activities planned. Success of the project will be determined by the Clients Consultant who wi
Work Inspection Request, He is hereby urged to take into considerations the comments made by the consutant
planned activities.
Approved by:

Name and Signature

Location:
Date:
Activities Details

Cracks Repair

RESPONSIBILITY

REQUIREMENT

Project Engineer

10 Bags Mapei KeraFlex; 1


Angle Grinder; 1 Pencil
Grinder; 1 Vaccum Cleaner; 1
Paddle Mixer; 1 Mixing
Bucket; 1 Trowel; 1 Steel
Float; 1 Measuring Cup;
Driver + Car

Project Engineer

Project Engineer
Project Team
Project Team

Angle Grinder, Pencil Grinder

Project Team

Vaccum Cleaner

Project Team

Mixing Bucket, Paddle Mixer,


Measuring Cup

Project Team

Mapei Keraflex, Hand Trowel,


Steel Float

Project Engineer
Project Engineer
Project Engineer
Project Engineer

WIR Form (Al Arif Format)

rized to delegate responsibilities and use all resources provided


and management, as required, to ensure successful and timely
by the Clients Consultant who will give his approval after a
mments made by the consutant earlier on when completing all

Date