Shutter Design
Shutter Design
SH. NO.
EW-II ( RJ - 7 )
REV.
BRIDGE NO : 295.740
DATE
BY
PREAMBLE:
For constructing 10.5 m span RCC Solid Slab H- frames are proposed below the soffit of Solid Slab
In this document the design of Formwork & Staging of H-frames & its supporting components is done.
REFERENCE DRGS :
1 ) HCC :
EW/34/FS-19
RCC SOLID SLAB GIRDER -10.5 M SPAN , G.A OF FORMWORK & STAGING OF BRIDGE @ 295.740
2 ) DEPT : NHAI/EW-RJ-7/NH76/BR-14/R-2
REFERENCE CODES :
1 ) IS - 800-1984
2) IS - 2062-1992
3) IS - 808-1989
4) IS - 806-1968
The General Arrangement of Formwork & Staging with H-frame in the cross section is as shown below.
WOODEN SLEEPER
HCC F 01 11 02 R - 0
2 OF 28
HINDUSTAN CONSTRUCTION CO. LTD. MUMBAI.
Subject :
10.5 M RCC SOLID SLAB IN LAND SPAN
Details :
Design of Formwork & Staging for Superstructure
SH. NO.
EW-II ( RJ - 7 )
REV.
BRIDGE NO : 295.740
DATE
BY
Load Calculation :
Thickness of Slab =
Weight of Slab
Live load on Formwork =
Wt of Formwork =
1800
4.68
0.1
0.1
4.88
1.8 x 2.6 =
Total Load =
mm
T/m2
T/m2
T/m2
T/m2
C.L. of support
12mm Skin Plate
Angle Stiffner
2440
C.L. of support
1210
PLAN
Width of plate
Length of plate
Thk of plate=
1210 mm
1800 mm
12 mm
Z = 1 / 6 * b * d2 =
=Z *(d /2 ) =
540.000 m3
324.000 m4
312 mm
1700 mm
1.7629 T-m/m
=M/Z=
544 Kg/Cm2
<
650.1 Kg/Cm2
w=
L=
48.8 KN/m/m
1700 mm
E=
=
2.0E+05 N/mm2
3240000.00 mm4/m
HCC F 01 11 02 R - 0
5.230769231
SAFE
3 OF 28
HINDUSTAN CONSTRUCTION CO. LTD. MUMBAI.
Subject :
10.5 M RCC SOLID SLAB IN LAND SPAN
Details :
Design of Formwork & Staging for Superstructure
SH. NO.
EW-II ( RJ - 7 )
REV.
BRIDGE NO : 295.740
DATE
BY
Size of Batten
ISMC 100x50x5
Thickness of Flange Plate =
Overhang of Flange Plate = 16 * thk of plate
Depth of Angle Section =
Width of Angle Section =
Thk of Angle Section =
Area of Angle Section =
XX of Angle Section =
YY of Angle Section =
Cxx of Angle Section =
Cyy of Angle Section =
Size of Angle :
0
0
100
50
5
1170
1867000
259000
39.95
14.88
mm
mm
mm
mm
mm
mm2
mm4
mm4
mm
mm
yy =
Xmax =
1866999.97 mm4
14.88 mm
37340.00 mm3
mm3
rmin =
Zyy =
259000.00 mm4
39.95 mm
7463.98 mm3
14.88 mm
4.88
0.25
1.22
0.34
T/m2
m
T/ m
T/ m
1.25 m
Max B.M = w * L2 / 8
Zxx Top=
bc= M / Z xx =
0.066 T-M
37.34 cm3
178 Kg/cm2
w=
0.34 T/m
L=
1.25 m
Actual deflection = 5 wL4 / 384 E
2.0E+05 N/mm2
1867000 mm4
E=
=
0.289 mm
Load Calculation :
Thickness of Slab =
Weight of Slab =
Live load on Formwork =
Wt of Formwork =
HCC F 01 11 02 R - 0
0.35 x 2.6 =
350
0.91
0.36
0.1
mm
T/ m2
T/ m2
T/ m2
3.72307692
1650 Kg/cm2
SAFE
4 OF 28
HINDUSTAN CONSTRUCTION CO. LTD. MUMBAI.
Subject :
10.5 M RCC SOLID SLAB IN LAND SPAN
Details :
Design of Formwork & Staging for Superstructure
SH. NO.
EW-II ( RJ - 7 )
REV.
BRIDGE NO : 295.740
DATE
BY
Total Load =
C / C Spacing of Cross Member =
Load /m run =
1.37 x 1.25 =
say ~
1.37
1250
1.713
1.8
T/ m2
mm
T/ m
T/ m
1.8 T/m
Cross Member
0.325
1.25
0.325
Max B.M =
Max S.F =
Max Deflection =
0.257 T-m
1.125 T
1.23 mm
SMC 100
Zxx =
A=
xx =
rxx =
18.2 cm2
157 cm4
2.94 cm
yy =
ryy =
41.9 cm3
58 cm4
1.79 cm
tw =
4.8 mm
Aw =
720 mm2
1250 mm
L / rmin
70
17.9 mm
75 mm
7.5 mm
D/T=
10
153 N/mm2
L=
rmin =
D=
T=
Max B.M =
Zxx =
= M / Zxx =
0.257 T-M
41.9 cm3
613 Kg/Cm2
<
1530 Kg/Cm2
<
1000 Kg/Cm2
SAFE
Max Shear = V =
Aw =
V / Aw =
1.125 T
7.2 cm2
156 Kg/Cm2
Actual deflection =
HCC F 01 11 02 R - 0
1.23 mm
SAFE
(CLAUSE 6.4.2.a IS : 800 - 1984 )
5 OF 28
HINDUSTAN CONSTRUCTION CO. LTD. MUMBAI.
Subject :
10.5 M RCC SOLID SLAB IN LAND SPAN
Details :
Design of Formwork & Staging for Superstructure
SH. NO.
EW-II ( RJ - 7 )
REV.
BRIDGE NO : 295.740
DATE
BY
As Cross member below the Cantilever Span , span about 1250 c/c , These Cross members are supported on Long Members
which are placed on H-frame at 1.00m C/C
Pont Loads from Cross Member =
1.8 T
1.250 Typ
1.00
1.00
1.00
0.45 T-M
1.6 T
0.4 mm
1.00
18.2
157
2.94
4.8
1.00
SMC 75 X 40
Zxx =
cm2
cm4
cm
mm
yy =
ryy =
Aw =
41.8
57.5
1.777
720
cm3
cm4
cm
mm2
L / rmin
56.26
17.77 mm
75 mm
7.5 mm
D/T=
10.00
157 N/mm2
L=
rmin =
D=
T=
Max B.M =
Zxx =
HCC F 01 11 02 R - 0
0.45 T-M
41.8 cm3
6 OF 28
HINDUSTAN CONSTRUCTION CO. LTD. MUMBAI.
Subject :
10.5 M RCC SOLID SLAB IN LAND SPAN
Details :
Design of Formwork & Staging for Superstructure
SH. NO.
EW-II ( RJ - 7 )
REV.
BRIDGE NO : 295.740
DATE
BY
= M / Zxx =
1077 Kg/Cm2
1570 Kg/Cm2
<
SAFE
Max Shear = V =
Aw =
1.6 T
7.2 cm2
222 Kg/Cm2
V / Aw =
<
SAFE
1000 Kg/Cm2
(CLAUSE 6.4.2.a IS : 800 - 1984 )
Actual deflection =
0.40 mm
1.8 T
L / rmin
4.53 cm2
1500 mm
93.75
1.6 cm
845 Kg/Cm2
Load Calculation :
Thickness of Slab =
HCC F 01 11 02 R - 0
850 mm
( Table 2 of S : 806 )
3.83 T
>
1.8
SAFE
7 OF 28
HINDUSTAN CONSTRUCTION CO. LTD. MUMBAI.
Subject :
10.5 M RCC SOLID SLAB IN LAND SPAN
Details :
Design of Formwork & Staging for Superstructure
SH. NO.
EW-II ( RJ - 7 )
REV.
BRIDGE NO : 295.740
DATE
BY
Weight of Slab
Live load on Formwork =
Wt of Formwork =
0.85 x 2.6 =
2.21
0.36
0.10
2.67
Total Load =
T/m2
T/m2
T/m2
T/m2
C.L. of support
4mm Skin Plate
625
Angle Stiffner
1250
C.L. of support
625
C.L. of support
500
PLAN
Width of plate
Length of plate
Thk of plate=
500 mm
1250 mm
4 mm
Z = 1 / 6 * b * d2 =
=Z *(d /2 ) =
2.667 cm3/m
0.533 cm4/m
250 mm
213 mm
0.012 T-m/m
452 Kg/Cm2
<
1650 Kg/Cm2
w=
L=
26.7 KN/m/m
212.5 mm
E=
=
2.0E+05 N/mm2
5333.33 mm4/m
HCC F 01 11 02 R - 0
SAFE
8 OF 28
HINDUSTAN CONSTRUCTION CO. LTD. MUMBAI.
Subject :
10.5 M RCC SOLID SLAB IN LAND SPAN
Details :
Design of Formwork & Staging for Superstructure
SH. NO.
EW-II ( RJ - 7 )
REV.
BRIDGE NO : 295.740
DATE
BY
PLATE 134 X
ANGLE 75 X
DEPTH
THK
AREA=A
AX
mm
mm
mm
mm
mm
mm
mm
mm
mm4
134
75
4
75
536
866
67
84.6
77.00
20.6
35912.00
73263.6
41272
17839.6
714.67
457000
1402
TOTAL
77.87
56.13
42.16
36.84
AY
3
109176
59112
134
X1 =
X2 =
Y1 =
Y2 =
xx
WIDTH
mm
mm
mm
mm
(from left )
(from right)
(from bottom)
(from Top)
64
1510871
42.16
35835
41014
yy =
Xmax =
Zyy =
mm4
mm
mm3
mm3
mm4
77.87 mm
17485 mm3
1361590.41
31.16 mm
2.67
0.25
0.67
0.7
T/m2
m
T/ m
T/ m
0.625 m
Max B.M = w * L2 / 10
Zxx Top=
bc= M / Z xx =
0.027 T-M
35.83 cm3
76 Kg/cm2
w=
0.7 T/m
L=
0.625 m
Actual deflection = 2.5 wL4 / 384 E
E=
=
0.023 mm
HCC F 01 11 02 R - 0
2.0E+05 N/mm2
1510871 mm4
1650 Kg/cm2
SAFE
9 OF 28
HINDUSTAN CONSTRUCTION CO. LTD. MUMBAI.
Subject :
10.5 M RCC SOLID SLAB IN LAND SPAN
Details :
Design of Formwork & Staging for Superstructure
SH. NO.
EW-II ( RJ - 7 )
REV.
BRIDGE NO : 295.740
DATE
BY
Cross member for Cantilever Deck Slab are placed at 1250 c/c, whereas,Cross member for Girder Soffit slab are placed at 625 c/c,
Loading on Cross Member From Central Solid Slab :
0.85 x 2.6 =
Total Load =
C / C Spacing of Cross Member = ( width )
Load /m run =
say ~
850
2.21
0.36
0.1
mm
T/ m2
T/ m2
T/ m2
2.67
625
1.669
1.70
T/ m2
mm
T/ m
T/ m
GIRDER SOFFIT
0.35
1.25
1.0
1.0
1.25
0.33 T-m
1.14 T
0.75 mm
18.2
157
2.94
4.8
1.25
FROM BEAMMAX
SMC 75 X 40
Zxx =
cm2
cm4
cm
mm
yy =
ryy =
Aw =
41.8
57.5
1.777
720
cm3
cm4
cm
mm2
L / rmin
70.33
D/T=
10.00
151 N/mm2
L=
rmin =
D=
T=
1250
17.77
75
7.5
Max B.M =
Zxx =
= M / Zxx =
0.33 T-m
41.8 cm3
789 Kg/Cm2
<
1.14 T
7.2 cm2
158 Kg/Cm2
<
1510 N/mm2
SAFE
1000 Kg/Cm2
SAFE
HCC F 01 11 02 R - 0
0.75 mm
SAFE
0.35
10 OF 28
HINDUSTAN CONSTRUCTION CO. LTD. MUMBAI.
Subject :
10.5 M RCC SOLID SLAB IN LAND SPAN
Details :
Design of Formwork & Staging for Superstructure
SH. NO.
EW-II ( RJ - 7 )
REV.
BRIDGE NO : 295.740
DATE
BY
As Cross member below the Girder soffit, span at 0.625m c/c , These Cross members are supported on Long Members
which are placed on H-frame at 1.25m C/C
Pont Loads from Cross Member =
2.1 T
0.625 Typ
1.00
1.00
1.00
1.00
0.525 T-M
2.5 T
0.23 mm
1.00
SMC 100X50
Zxx =
A=
xx =
rxx =
24.4 cm2
384 cm4
3.97 cm
yy =
ryy =
76.8 cm3
111 cm4
2.13 cm
tw =
5 mm
Aw =
1000 mm2
L / rmin
58.61
21.33 mm
100 mm
7.7 mm
D/T=
12.99
154 N/mm2
L=
rmin =
D=
T=
HCC F 01 11 02 R - 0
11 OF 28
HINDUSTAN CONSTRUCTION CO. LTD. MUMBAI.
Subject :
10.5 M RCC SOLID SLAB IN LAND SPAN
Details :
Design of Formwork & Staging for Superstructure
SH. NO.
EW-II ( RJ - 7 )
REV.
BRIDGE NO : 295.740
DATE
BY
Max B.M =
Zxx =
0.525 T-M
76.8 cm3
= M / Zxx =
684 Kg/Cm2
<
1540 Kg/Cm2
<
1000 Kg/Cm2
SAFE
Max Shear = V =
Aw =
2.5 T
10 cm2
250 Kg/Cm2
V / Aw =
SAFE
(CLAUSE 6.4.2.a IS : 800 - 1984 )
Actual deflection =
0.23 mm
3.8 T
L / rmin
6.41 cm2
1500 mm
74.26
2.02 cm
950 Kg/Cm2
HCC F 01 11 02 R - 0
( Table 2 of S : 806 )
6.09 T
>
3.8
SAFE
12 OF 28
. NO.
R0
11.05.12
NITESH
REF
HCC F 01 11 02 R - 0
13 OF 28
. NO.
R0
11.05.12
NITESH
REF
HCC F 01 11 02 R - 0
14 OF 28
. NO.
R0
11.05.12
NITESH
REF
HCC F 01 11 02 R - 0
15 OF 28
. NO.
R0
11.05.12
NITESH
REF
HCC F 01 11 02 R - 0
16 OF 28
. NO.
R0
11.05.12
NITESH
REF
HCC F 01 11 02 R - 0
17 OF 28
. NO.
R0
11.05.12
NITESH
REF
HCC F 01 11 02 R - 0
18 OF 28
. NO.
R0
11.05.12
NITESH
REF
HCC F 01 11 02 R - 0
19 OF 28
. NO.
R0
11.05.12
NITESH
REF
yy
mm4
802035
457000
HCC F 01 11 02 R - 0
20 OF 28
. NO.
R0
11.05.12
NITESH
REF
5 c/c,
HCC F 01 11 02 R - 0
21 OF 28
. NO.
R0
11.05.12
NITESH
REF
HCC F 01 11 02 R - 0
22 OF 28
. NO.
R0
11.05.12
NITESH
REF
HCC F 01 11 02 R - 0
Load Calculation :
Thickness of Slab =
Weight of Slab
Live load on Formwork =
Wt of Formwork =
Total Load =
1800
4.68
0.1
0.1
4.88
1.8 x 2.6 =
mm
T/m2
T/m2
T/m2
T/m2
C.L. of support
12mm Skin Plate
Angle Stiffner
1800
C.L. of support
1210
PLAN
Width of plate
Length of plate
Thk of plate=
1210 mm
1800 mm
12 mm
540.000 m3
324.000 m4
Z = 1 / 6 * b * d2 =
=Z *(t /2 ) =
Use 4'x3' runner as a Batten
C/C spacing of Stiffner
Clear Span = ( 1800-100 )
312 mm
1700 mm
1.7629 T-m/m
Max B.M = w * L2 / 8
=M/I=
544 Kg/Cm2
650 Kg/Cm2
w=
L=
27 KN/m/m
1700 mm
E=
=
200000 N/mm2
3240000.00 mm4/m
Allowable deflection = L / 325
<
5.54
Load Calculation :
Thickness of Slab =
Weight of Slab =
Live load on Formwork =
Wt of Formwork =
1.8 x 2.6 =
Total Load =
C / C Spacing of Cross Member =
Load /m run =
5.14 x 0.6 =
say ~
1800
4.68
0.36
0.1
mm
T/ m2
T/ m2
T/ m2
5.14
600
3.084
3.1
T/ m2
mm
T/ m
T/ m
1.8 T/m
Cross Member
1.25
0.325
Max B.M =
Max S.F =
Max Deflection =
0.325
0.465 T-m
2.79 T
5.538462 mm
SMC 100
Zxx =
A=
xx =
rxx =
11.7 cm2
157 cm4
3.66 cm
yy =
ryy =
41.9 cm3
58 cm4
2.23 cm
tw =
4.8 mm
Aw =
720 mm2
1800 mm
L / rmin
81
22.3 mm
100 mm
8 mm
D/T=
12.5
165 N/mm2
L=
rmin =
D=
T=
Max B.M =
Zxx =
0.465 T-M
= M / Zxx =
41.9 cm3
1110 Kg/Cm2
<
1650 Kg/Cm2
<
1000
Max Shear = V =
Aw =
V / Aw =
2.79 T
7.2 cm2
388 Kg/Cm2
Kg/Cm2
0.634 mm
<
5.54
Considered )
SAFE
SAFE
ross Member
MAX RESULT )
SAFE
SAFE
2.a IS : 800 - 1984 )
SAFE