Sample Method Statement Astm d1194
Sample Method Statement Astm d1194
PLATELOADTESTING
Reference:
ASTMD119494(Withdrawn2003)
StandardTestMethodforBearingCapacityofSoilforStaticLoad&SpreadFootings
1. Introduction
Objective:
Thistestisintendedtoestimatethebearingcapacityofbymeansofstaticloadtestingby
steelplate.
Limitation:
Thesubsoilstressesdevelopedundertheplatecanonlyreachtwicetheplatediameteror
dimension.
ProjectDetails:
Title
:
Client
:
Location
:
TargetBearing
Capacity
:
TestArea/s
:
TestArea/s
Northing
PLT1
Easting
Remark/s
2. TestInstruments&Setup
a. Counterweight/Reaction
Adequatereactionloadbyreactionsystemorheavyequipment.Thisisprovidedby
theClient.
b. HydraulicJackAssy.andLoadMeasuringDevice
A50Tonhydraulicjackwillapplytherequiredforces(loads).Acalibratedbuiltin
loadmeasuringdevicewillregistertheappliedforces.
c. BearingPlates
Three(3)circularbearingplateswithdiameters12to30inchesareplacedina
pyramidfashionforrigidity.Thelargestplatewillbeatthebottom,incontactwith
thegroundsurface.
xxx.xxmm
Aclearancebetweenthegroundandcounterweightofxxx.xxmillimetersisrequired
toprovideadequateworkingdisplacementwhenthehydraulicjacksrammoves.An
illustrativefigureispresentedabove.
d. SettlementMonitoringGages&ReferenceBeam/s
Two(2)tothree(3)dialgagesareplacedinarray,equallyaroundtheplate.More
specifically,two(2)gagesandthree(3)gagesshallbeplaced180degreesand120
degreesapart,respectively.Figurebelowshowthesetupofgagesinplanview(top
view).Gagesarebecapableofmeasuring1/1000ofaninch(0.001).
Referencebeamswillindependentlysupportthedialgages,supportedasfaras
practicablefromtheloadapplicationandoutsidetheanticipateddeflectionbowlof
theplate.
plate
gage
2Gages
3Gages
e. Miscallaneous
i. Camerafortakingphotographsasdocumentation
ii. Stopwatchformeasuringtimebetweensettlementreadouts
SummaryofCalibratedInstruments:
DateofPurchase
(yyyymmdd)
LastCalibration
(yyyymmdd)
MassorDead
Weight
(kg)
LoadInstrument
(integratedwith
hydraulicjack)
date
date
massorweight
DialGage1
date
date
n.a.
DialGage2
date
date
n.a.
DialGage3
date
date
n.a.
Plate1(Dia.=??)
n.a.
n.a.
massorweight
Plate2(Dia.=??)
n.a.
n.a.
massorweight
Plate3(Dia.=??)
n.a.
n.a.
massorweight
Instrument/
Apparatus
3. LoadIncrements&TimeInterval
Loadincrementsshouldbenomorethan10T/sq.ft.(95kPa)ornomorethan1/10oftarget
bearingcapacity.Applicationofloadshouldnotfluctuate,noimpact,andappliedonthe
deadcenterofthebearingplate.Wheneverpossibleandpratical,compensationloading
shouldbemadeinthejacktomaintaintheloadreadingwhentheplatestartstosettle.
Loadingisterminatedwhenthepeakloadisreached(targetbearingcapacity),orwhen
failureoccurs(10%ofplatediameter),whichevercomesfirst.
ASTMrequiresatleastsix(6)settlementreadingsbetweenloadincrements,asmuchas
possibleatequaltimeintervals.
Intheunloadingpart,three(3)equalloaddecrementsaremade,untilzeroornilloadis
reached.Recordingsarecontinueduntilnofurtherreboundismeasuredoruntilaperiod
notlessthantimeonapplyingtheloads.
Forthisproject,thefollowingareset:
Platediameter
:
Platearea
Loadincrement
:
TargetBear.Capacity :
TimeIntervals
:
Thetablebelowsummarizestheloadstobeapplied.
Step
1
2
3
4
5
6
7
8
9
10
11
12
14
15
16
TimeforReadouts
minutes
0,2,4,6,8,10,15
0,2,4,6,8,10,15
0,2,4,6,8,10,15
0,2,4,6,8,10,15
0,2,4,6,8,10,15
0,2,4,6,8,10,15
0,2,4,6,8,10,15
0,2,4,6,8,10,15
0,2,4,6,8,10,15
0,2,4,6,8,10,15
0,2,4,6,8,10,15
0,2,4,6,8,10,15
0,2,4,6,8,10,15
0,2,4,6,8,10,15
0,2,4,6,8,10,15
Time
minutes
15
15
15
15
15
15
15
15
15
15
15
15
15
15
15
CumulativeTime
minutes
hours
15
0.25
30
0.5
45
0.75
60
1
75
1.25
90
1.5
105
1.75
120
2
135
2.25
150
2.5
165
2.75
180
3
195
3.25
210
3.5
225
3.75
SampleFieldRecordingForm
Date
ListofPersonnel
1.
2.
3.
WeatherConditions
Load
Tons
1.0
2.0
3.0
4.0
5.0
6.0
7.0
TimeofLoad
Application
minutes
0
2
4
6
8
10
15
0
2
4
6
8
10
15
0
2
4
6
8
10
15
0
2
4
6
8
10
15
0
2
4
6
8
10
15
0
2
4
6
8
10
15
0
2
4
6
8
10
15
Gage1
(x0.001in)
Gage2
(x0.001in)
Gage3
(x0.001in)
Remark/s
8.0
9.0
10.0
11.0
12.0
8.0
4.0
0.0
0
2
4
6
8
10
15
0
2
4
6
8
10
15
0
2
4
6
8
10
15
0
2
4
6
8
10
15
0
2
4
6
8
10
15
0
2
4
6
8
10
15
0
2
4
6
8
10
15
0
2
4
6
8
10
15