Storage Tank Foundation Settlement Quality Control and Inspection Report Form
Storage Tank Foundation Settlement Quality Control and Inspection Report Form
com
ITP No.:
Inspection Gr.
Report No.
Date
WORK No.
ITEM No.
LOCATION
SIGNATURE
INSPECTION NOTICE NO.:
COMPANYS INSPECTOR:
CONTRACTOR INSPECTOR:
SUBCONTRACTOR INSPECTOR
COMPANY
/
/
A
(mm)
CONTRACTOR
/
/
SUBCONTRACTOR
Reading at each point shall be taken at (1)- EMPTY, (2)-25% Full, (3)- 50% Full and (4)- 100% Full during Hydrostatic Test.
[Explanatory Figure]
Legend ACC:ACCEPT