Notes To Capital Work-In-progress
Notes To Capital Work-In-progress
31-3-______
(Rs. Lacs)
___________
___________
___________
___________
___________
___________
Rent (Net)
___________
___________
___________
___________
Insurance
___________
___________
- Audit Fees.
___________
___________
- Certification Work
___________
___________
___________
___________
Interest on others
___________
___________
Miscellaneous Expenses
___________
___________
Depreciation
___________
___________
___________
___________
___________
___________
Excise Duty
___________
___________
___________
___________
___________
___________
___________
___________
___________
___________
___________
___________
Total
2.
3.
(b)
(c)
(d)
(e)
Interest on Loans
Years ended
31-3-______
(Rs. Lacs)
(i)
Repairs to Buildings
___________
___________
(ii)
___________
___________
(iii)
___________
(iv)
___________
___________
(v)
Insurance
___________
___________
(vi)
Rent
___________
___________
(vii)
___________
___________
___________
___________
(ix)
___________
___________
Interest
Total
--------------------------___________
___________
---------------------------
4.
5.
(i)
(ii)
(iii)
(iv)
(v)
Depreciation (Rs.
(vi)
Miscellaneous Expense
)
(Rs.
6.
7.
The Company started trial runs and trial production at its _____ Plant
on _______ Commercial production has not been commenced as at the date
of Balance Sheet. The expenditure incurred on the Project during the
period from ________ to ________ has been included in Schedule _______
`Pre-operative and Trial Production expenditure allocated to Fixed
Assets and Capital Work in Progress'. The preoperative and trial
production expenditure has been allocated to Buildings, Plant and
Machinery, Capital Work in Progress in the ratio of direct costs.
8.
9.
10.