Project Schedule

This document outlines the project schedule for the construction of a second phase condensate plant with a capacity of 15 MMSCFD at the Tambun oil field. It details the engineering, procurement, fabrication, testing, and construction activities and timelines. Key activities include: - Engineering and technical approval taking place from September to October 2010 - Procurement of major mechanical equipment like heat exchangers, separators, and pumps from October 2010 to February 2011 - Fabrication of mechanical equipment from October 2010 to December 2010 - Site civil works from October 2010 to January 2011 - Testing of fabricated equipment from December 2010 to January 2011 - Surface preparation and painting from December 2010 to January 2011

Uploaded by

Bowo Edhi Wibowo
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
194 views

Project Schedule

This document outlines the project schedule for the construction of a second phase condensate plant with a capacity of 15 MMSCFD at the Tambun oil field. It details the engineering, procurement, fabrication, testing, and construction activities and timelines. Key activities include: - Engineering and technical approval taking place from September to October 2010 - Procurement of major mechanical equipment like heat exchangers, separators, and pumps from October 2010 to February 2011 - Fabrication of mechanical equipment from October 2010 to December 2010 - Site civil works from October 2010 to January 2011 - Testing of fabricated equipment from December 2010 to January 2011 - Surface preparation and painting from December 2010 to January 2011

Uploaded by

Bowo Edhi Wibowo
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

Contractor By : PT.

SURYATEGUH CEMERLANGPERKASA
Owner By
: PT. PERTAMINA EP REGION JAWA FIELD TAMBUN
Duration

Start

PROJECT SCHEDULE

PEMBANGUNAN CONDENSAT PLANT TAHAP 2 KAPASITAS 15 MMSCFD DI LAPANGAN TAMBUN

ID

Task Name

Finish

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74

ENGINEERING
P.O Released
Drawing and Technical Approval
Drawing and Technical Approved

23 days
1 day
10 days
12 days

Wed 9/1/10
Wed 9/1/10
Thu 9/2/10
Thu 9/16/10

Fri 10/1/10
Wed 9/1/10
Wed 9/15/10
Fri 10/1/10

PROCUREMENT
PROCUREMENT MECHANICAL
HEAT EXCHANGER
Shell and Saddle Plate
Ellipsoidal Head
Nozzle's
Pipe & Fitting
Gasket
Bolt & Nut
Paint
Instrumentation

100 days
100 days
100 days
12 days
10 days
6 days
8 days
8 days
12 days
12 days
100 days

Mon 10/4/10
Mon 10/4/10
Mon 10/4/10
Mon 10/4/10
Mon 10/4/10
Mon 10/4/10
Mon 10/4/10
Mon 10/4/10
Mon 10/4/10
Mon 10/4/10
Mon 10/4/10

Fri 2/18/11
Fri 2/18/11
Fri 2/18/11
Tue 10/19/10
Fri 10/15/10
Mon 10/11/10
Wed 10/13/10
Wed 10/13/10
Tue 10/19/10
Tue 10/19/10
Fri 2/18/11

GAS LIQUID COALESCER


Shell and Saddle Plate
Ellipsoidal Head
Nozzle's
Pipe & Fitting
Gasket
Bolt & Nut
Paint
Instrumentation

90 days
12 days
15 days
9 days
16 days
12 days
12 days
12 days
90 days

Mon 10/4/10
Mon 10/4/10
Mon 10/4/10
Mon 10/4/10
Mon 10/4/10
Mon 10/4/10
Mon 10/4/10
Mon 10/4/10
Mon 10/4/10

Fri 2/4/11
Tue 10/19/10
Fri 10/22/10
Thu 10/14/10
Mon 10/25/10
Tue 10/19/10
Tue 10/19/10
Tue 10/19/10
Fri 2/4/11

LIQUID-LIQUID SEPARATOR
Shell and Saddle Plate
Ellipsoidal Head
Nozzle's
Pipe & Fitting
Gasket
Bolt & Nut
Paint
Instrumentation

80 days
12 days
24 days
12 days
20 days
12 days
12 days
12 days
80 days

Mon 10/4/10
Mon 10/4/10
Mon 10/4/10
Mon 10/4/10
Mon 10/4/10
Mon 10/4/10
Mon 10/4/10
Mon 10/4/10
Mon 10/4/10

Fri 1/21/11
Tue 10/19/10
Thu 11/4/10
Tue 10/19/10
Fri 10/29/10
Tue 10/19/10
Tue 10/19/10
Tue 10/19/10
Fri 1/21/11

STABILIZER COLUMN
Shell and Saddle Plate
Ellipsoidal Head
Nozzle's
Pipe & Fitting
Gasket
Bolt & Nut
Paint
Instrumentation

85 days
12 days
30 days
12 days
20 days
12 days
12 days
12 days
85 days

Mon 10/4/10
Mon 10/4/10
Mon 10/4/10
Mon 10/4/10
Mon 10/4/10
Mon 10/4/10
Mon 10/4/10
Mon 10/4/10
Mon 10/4/10

Fri 1/28/11
Tue 10/19/10
Fri 11/12/10
Tue 10/19/10
Fri 10/29/10
Tue 10/19/10
Tue 10/19/10
Tue 10/19/10
Fri 1/28/11

REBOILER
Shell and Saddle Plate
Ellipsoidal Head
Nozzle's
Pipe & Fitting
Gasket
Bolt & Nut
Paint
Instrumentation

80 days
12 days
30 days
12 days
20 days
12 days
12 days
12 days
80 days

Mon 10/4/10
Mon 10/4/10
Mon 10/4/10
Mon 10/4/10
Mon 10/4/10
Mon 10/4/10
Mon 10/4/10
Mon 10/4/10
Mon 10/4/10

Fri 1/21/11
Tue 10/19/10
Fri 11/12/10
Tue 10/19/10
Fri 10/29/10
Tue 10/19/10
Tue 10/19/10
Tue 10/19/10
Fri 1/21/11

PROCUREMENT PACKAGE
AIR COOLED CHILLER UNIT
CHILLER WATER PUMP
CHILLED WATER TANK
MAKE-UP WATER PUMP
WILD COND. INTER. PUMP
CIRCULATION PUMP
THERMAL OIL HEATER
CONDENSATE CCOLER
GAS ENGINE GENERATOR SET

94 days
16 wks
16 wks
12 days
17 wks
16 wks
14 wks
13 wks
8 wks
94 days

Mon 10/4/10
Mon 10/4/10
Mon 10/4/10
Mon 10/4/10
Mon 10/4/10
Mon 10/4/10
Mon 10/4/10
Mon 10/4/10
Mon 10/4/10

Thu 2/10/11
Fri 1/21/11
Fri 1/21/11
Tue 10/19/10
Fri 1/28/11
Fri 1/21/11
Fri 1/7/11
Fri 12/31/10
Fri 11/26/10

Mon 10/4/10

Thu 2/10/11

PROCUREMENT CIVIL MATERIAL


Piling Pipe
Sand, Stone, Gravel, and Cement
Steel Concrete
Steel Construction

20 days
20 days
15 days
15 days
12 days

Mon 10/4/10
Mon 10/4/10
Mon 10/4/10
Mon 10/4/10
Mon 10/4/10

Fri 10/29/10
Fri 10/29/10
Fri 10/22/10
Fri 10/22/10
Tue 10/19/10

W-1

Note: Delivery Time 180 Days ARPO


Delivery point: FOT S.P Tambun

W1

W2

W3

W4

W5

W6

W7

W8

W9

W10

W11

W12

W13

W14

W15

W16

W17

W18

W19

W20

W21

W22

W23

W24

W25

W26

W27

Contractor By : PT. SURYATEGUH CEMERLANGPERKASA


Owner By
: PT. PERTAMINA EP REGION JAWA FIELD TAMBUN
ID

Task Name

Duration

Start

PROJECT SCHEDULE

PEMBANGUNAN CONDENSAT PLANT TAHAP 2 KAPASITAS 15 MMSCFD DI LAPANGAN TAMBUN


Finish
W-1

75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148

20 days

Mon 10/4/10

Fri 10/29/10

MATERIAL INSPECTION
INSPECTION MECHANICAL MATERI
HEAT EXCHANGER
GAS LIQUID COALESCER
LIQUID-LIQUID SEPARATOR
STABILIZER COLUMN
REBOILER

118 days
2 days
2 days
2 days
2 days
2 days
2 days

Wed 9/1/10
Wed 10/20/10
Wed 10/20/10
Wed 10/20/10
Wed 10/20/10
Wed 10/20/10
Wed 10/20/10

Fri 2/11/11
Thu 10/21/10
Thu 10/21/10
Thu 10/21/10
Thu 10/21/10
Thu 10/21/10
Thu 10/21/10

INSPECTION CIVIL MATERIAL


INSPECTION PACKAGE UNIT
AIR COOLED CHILLER UNIT
CHILLED WATER TANK
CHILLER WATER PUMP
MAKE-UP WATER PUMP
WILD COND. INTER. PUMP
CIRCULATION PUMP
THERMAL OIL HEATER
CONDENSATE COOLER
GAS ENGINE GENERATOR SET

2 days
118 days
2 days
12 days
3 days
2 days
2 days
3 days
2 days
1 day

Mon 10/25/10
Wed 9/1/10
Mon 1/24/11
Mon 1/24/11
Wed 10/20/10
Mon 1/31/11
Mon 1/24/11
Mon 1/10/11
Mon 1/3/11
Fri 2/11/11

Tue 10/26/10
Fri 2/11/11
Tue 1/25/11
Tue 2/8/11
Fri 10/22/10
Tue 2/1/11
Tue 1/25/11
Wed 1/12/11
Tue 1/4/11
Fri 2/11/11

2 days

Wed 9/1/10

Thu 9/2/10

SHOP FABRICATION
MECHANICAL
HEAT EXCHANGER
GAS LIQUID COALESCER
LIQUID-LIQUID SEPARATOR
STABILIZER COLUMN
REBOILER

48 days
48 days
38 days
48 days
40 days
42 days
40 days

Fri 10/22/10
Fri 10/22/10
Fri 10/22/10
Fri 10/22/10
Fri 10/22/10
Fri 10/22/10
Fri 10/22/10

Tue 12/28/10
Tue 12/28/10
Tue 12/14/10
Tue 12/28/10
Thu 12/16/10
Mon 12/20/10
Thu 12/16/10

SITE CIVIL WORK


Civil Preparation
Pilling
Foundation Framing
Concreting
Building

63 days
10 days
6 days
15 days
12 days
20 days

Wed 10/27/10
Wed 10/27/10
Wed 11/10/10
Thu 11/18/10
Thu 12/9/10
Mon 12/27/10

Fri 1/21/11
Tue 11/9/10
Wed 11/17/10
Wed 12/8/10
Fri 12/24/10
Fri 1/21/11

SHOP FABRICATION TESTING


HEAT EXCHANGER
NDT
Pre - Test and Dim. Check
Hydro test

19 days
9 days
4 days
2 days
3 days

Wed 12/15/10
Wed 12/15/10
Wed 12/15/10
Tue 12/21/10
Thu 12/23/10

Mon 1/10/11
Mon 12/27/10
Mon 12/20/10
Wed 12/22/10
Mon 12/27/10

GAS LIQUID COALESCER


NDT
Pre - Test and Dim. Check
Hydro test

9 days
4 days
2 days
3 days

Wed 12/29/10
Wed 12/29/10
Tue 1/4/11
Thu 1/6/11

Mon 1/10/11
Mon 1/3/11
Wed 1/5/11
Mon 1/10/11

LIQUID-LIQUID SEPARATOR
NDT
Pre - Test and Dim. Check
Hydro test

9 days
4 days
2 days
3 days

Fri 12/17/10
Fri 12/17/10
Thu 12/23/10
Mon 12/27/10

Wed 12/29/10
Wed 12/22/10
Fri 12/24/10
Wed 12/29/10

STABILIZER COLUMN
NDT
Pre - Test and Dim. Check
Hydro test

9 days
4 days
2 days
3 days

Tue 12/21/10
Tue 12/21/10
Mon 12/27/10
Wed 12/29/10

Fri 12/31/10
Fri 12/24/10
Tue 12/28/10
Fri 12/31/10

REBOILER
NDT
Pre - Test and Dim. Check
Hydro test

9 days
4 days
2 days
3 days

Fri 12/17/10
Fri 12/17/10
Thu 12/23/10
Mon 12/27/10

Wed 12/29/10
Wed 12/22/10
Fri 12/24/10
Wed 12/29/10

SITE CIVIL TESTING


Concrete Test
Visual Test
Final Civil Test

10 days
3 days
2 days
5 days

Mon 12/27/10
Mon 12/27/10
Thu 12/30/10
Mon 1/3/11

Fri 1/7/11
Wed 12/29/10
Fri 12/31/10
Fri 1/7/11

SHOP SURFACE PREPERATION


HEAT EXCHANGER
Sand Blasting
Painting

17 days
7 days
3 days
4 days

Tue 12/28/10
Tue 12/28/10
Tue 12/28/10
Fri 12/31/10

Wed 1/19/11
Wed 1/5/11
Thu 12/30/10
Wed 1/5/11

7 days

Tue 1/11/11

Wed 1/19/11

PROCUREMENT FOR SITE MATERIAL

GAS LIQUID COALESCER

Note: Delivery Time 180 Days ARPO


Delivery point: FOT S.P Tambun

W1

W2

W3

W4

W5

W6

W7

W8

W9

W10

W11

W12

W13

W14

W15

W16

W17

W18

W19

W20

W21

W22

W23

W24

W25

W26

W27

Contractor By : PT. SURYATEGUH CEMERLANGPERKASA


Owner By
: PT. PERTAMINA EP REGION JAWA FIELD TAMBUN
ID

Task Name

Duration

Start

PROJECT SCHEDULE

PEMBANGUNAN CONDENSAT PLANT TAHAP 2 KAPASITAS 15 MMSCFD DI LAPANGAN TAMBUN


Finish
W-1

149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219

Sand Blasting
Painting

3 days
4 days

Tue 1/11/11
Fri 1/14/11

Thu 1/13/11
Wed 1/19/11

LIQUID-LIQUID SEPARATOR
Sand Blasting
Painting

7 days
3 days
4 days

Thu 12/30/10
Thu 12/30/10
Tue 1/4/11

Fri 1/7/11
Mon 1/3/11
Fri 1/7/11

STABILIZER COLUMN
Sand Blasting
Painting

7 days
3 days
4 days

Mon 1/3/11
Mon 1/3/11
Thu 1/6/11

Tue 1/11/11
Wed 1/5/11
Tue 1/11/11

REBOILER
Sand Blasting
Painting

7 days
3 days
4 days

Thu 12/30/10
Thu 12/30/10
Tue 1/4/11

Fri 1/7/11
Mon 1/3/11
Fri 1/7/11

SHOP FINISHING WORK

12 days

Thu 1/6/11

Fri 1/21/11

12 days
2 days
2 days
2 days
2 days
2 days

Thu 1/6/11
Thu 1/6/11
Thu 1/20/11
Mon 1/10/11
Wed 1/12/11
Mon 1/10/11

Fri 1/21/11
Fri 1/7/11
Fri 1/21/11
Tue 1/11/11
Thu 1/13/11
Tue 1/11/11

SHOP DELIVERY OF UNIT


HEAT EXCHANGER
GAS LIQUID COALESCER
LIQUID-LIQUID SEPARATOR
STABILIZER COLUMN
REBOILER

11 days
1 day
1 day
1 day
1 day
1 day

Mon 1/10/11
Mon 1/10/11
Mon 1/24/11
Wed 1/12/11
Fri 1/14/11
Wed 1/12/11

Mon 1/24/11
Mon 1/10/11
Mon 1/24/11
Wed 1/12/11
Fri 1/14/11
Wed 1/12/11

PACKAGE DELIVERY UNIT


AIR COOLED CHILLER UNIT
CHILLER WATER PUMP
MAKE-UP WATER PUMP
WILD COND. INTER. PUMP
CIRCULATION PUMP
THERMAL OIL HEATER
GAS ENGINE GENERATOR SET

31 days
2 days
3 days
2 days
2 days
3 days
2 days
2 days

Mon 1/3/11
Mon 1/24/11
Mon 1/24/11
Mon 1/31/11
Mon 1/24/11
Mon 1/10/11
Mon 1/3/11
Fri 2/11/11

Mon 2/14/11
Tue 1/25/11
Wed 1/26/11
Tue 2/1/11
Tue 1/25/11
Wed 1/12/11
Tue 1/4/11
Mon 2/14/11

INSTALLATION
AIR COOLED CHILLER UNIT
CHILLER WATER PUMP
MAKE-UP WATER PUMP
WILD COND. INTER. PUMP
CIRCULATION PUMP
THERMAL OIL HEATER
GAS ENGINE GENERATOR SET

35 days
8 days
3 days
3 days
2 days
4 days
12 days
6 days

Wed 1/5/11
Wed 1/26/11
Thu 1/27/11
Wed 2/2/11
Wed 1/26/11
Thu 1/13/11
Wed 1/5/11
Tue 2/15/11

Tue 2/22/11
Fri 2/4/11
Mon 1/31/11
Fri 2/4/11
Thu 1/27/11
Tue 1/18/11
Thu 1/20/11
Tue 2/22/11

HEAT EXCHANGER
GAS LIQUID COALESCER
LIQUID-LIQUID SEPARATOR
STABILIZER COLUMN
REBOILER

8 days
12 days
10 days
12 days
6 days

Tue 1/11/11
Tue 1/25/11
Thu 1/13/11
Mon 1/17/11
Thu 1/13/11

Thu 1/20/11
Wed 2/9/11
Wed 1/26/11
Tue 2/1/11
Thu 1/20/11

INDIVIDUAL COMMISSIONING
AIR COOLED CHILLER UNIT
CHILLER WATER PUMP
MAKE-UP WATER PUMP
WILD COND. INTER. PUMP
CIRCULATION PUMP
THERMAL OIL HEATER
GAS ENGINE GENERATOR SET

27 days
3 days
4 days
4 days
5 days
6 days
8 days
2 days

Wed 1/19/11
Mon 2/7/11
Tue 2/1/11
Mon 2/7/11
Fri 1/28/11
Wed 1/19/11
Fri 1/21/11
Wed 2/23/11

Thu 2/24/11
Wed 2/9/11
Fri 2/4/11
Thu 2/10/11
Thu 2/3/11
Wed 1/26/11
Tue 2/1/11
Thu 2/24/11

HEAT EXCHANGER
GAS LIQUID COALESCER
LIQUID-LIQUID SEPARATOR
STABILIZER COLUMN
REBOILER

20 days
3 days
8 days
8 days
12 days

Fri 1/21/11
Thu 2/10/11
Thu 1/27/11
Wed 2/2/11
Fri 1/21/11

Thu 2/17/11
Mon 2/14/11
Mon 2/7/11
Fri 2/11/11
Mon 2/7/11

6 days

Fri 2/25/11

Fri 3/4/11

PACKING
HEAT EXCHANGER
GAS LIQUID COALESCER
LIQUID-LIQUID SEPARATOR
STABILIZER COLUMN
REBOILER

COMMISSIONING SYSTEM

Note: Delivery Time 180 Days ARPO


Delivery point: FOT S.P Tambun

W1

W2

W3

W4

W5

W6

W7

W8

W9

W10

W11

W12

W13

W14

W15

W16

W17

W18

W19

W20

W21

W22

W23

W24

W25

W26

W27