Final Invoice 11th Jan 2

This invoice is for demolition works including the demolition of an existing go down, machinery and cranes for the works, fabrication and demolition of silos and costs for the erection team. Additional costs include consultancy for coordination of the demolition works, insurance, and amounts due including a 30% amount paid, 25% amount due, variation costs, and total now due inclusive of VAT.

Uploaded by

Ronnie Kinyanjui
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
30 views

Final Invoice 11th Jan 2

This invoice is for demolition works including the demolition of an existing go down, machinery and cranes for the works, fabrication and demolition of silos and costs for the erection team. Additional costs include consultancy for coordination of the demolition works, insurance, and amounts due including a 30% amount paid, 25% amount due, variation costs, and total now due inclusive of VAT.

Uploaded by

Ronnie Kinyanjui
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1

INVOICE

DEMOLITION WORKS
Find herein invoice for services to be rendered:
QUANTI
TY

PARTICULAR S

Demolition of existing go down

Machinery including cranes for the


works

Fabrication of the support bracket,


demolition of silos and the costs from
erection team

Costs related to consultancy for


coordination and responsibility for the
demolition related exercise
Insurance
DISCOUNT

SUB TOTAL

6
7

AMOUNT PAID 30%


AMOUNT DUE 25%
VARIATION
HARDCORE DUE
TOTAL NOW DUE INCLUSIVE VAT

UNIT
PRICE
Kshs

AMOUNT
Kshs