Triple Constraints Project Constraints Baseline
Triple Constraints Project Constraints Baseline
Project Manager accept changes against Scope, Time and cost constraints
Project Constraints
Scope, Time, Cost, Quality, Risk, Resource and Customer Satisfaction
Baseline
A reference plan for components, such asschedule, scope, and cost, against which performance deviations a
reference plan can be the original or the modified plan.
Cost Baseline
The planned budget for the project over a time period, used as a basis against which to monitor, control, and
performance of the project. The cost performance is measured by comparing the actual cost to the planned
period.
Performance Measurement Baseline
An approved integrated plan for the project specifying some parameters to be included in the performance me
as scope, schedule, and cost. The performance of the project is measured against this baseline. Some techn
parameters can also become part of this baseline.
Quality Baseline
A criterion that specifies the quality objectives for the project and thereby makes the basis for measuring an
quality performance.
Schedule Baseline
A specific version of the project schedule developed from the schedule network analysis and the schedule mod
approved version of the schedule with a start date and an end date, and it is used as a basis against which th
performance is measured.
Scope Baseline
The approved project scope, which includes the approved project scope statement, the WBS based on the appr
statement, and the corresponding WBS dictionary.