Balance work as on date 15/12/2015
Sl. No.
1
Description of work
300 wide RCC drain at the periphery
Earth excavation
PCC (1:3:6)
Reinforcement work
Shuttering work
RCC (For raft & wall)
Water proofing
Polystyrene block fixing
15 mm thk cement plaster
Elastometric membrane
Precast concrete tiles fixing
10
lding
date 15/12/2015
Location/Level
Approx quantity
25 m3
G. L.
7 m3
0.85 M.T.
186 m2
18.75 m3
28 m3
G. L.
7.2 m3
9.6 m3
4.9 m3
7 m3
4.3 m3
G. L.
2.5 m3
0.3 M.T.
7.5 m2
4.8 m3
10.8 m2
36 m3
552 m2
Roof level
552 m2
552 m2
566 m2
780 m2
673 m2
1364 m2
Remarks
2.52 m2
56 m2