Daily Progress Report

This daily report summarizes construction progress for the Myanmar Aquarium Project. It indicates that on August 4th, 72 workers across various trades were on site. Concrete was poured for the second floor slab between grid lines A1 and A5, and brickwork was completed for an IC and WS manhole. Safety protocols were followed and no lost time accidents or near misses occurred during the 383897 hours worked so far. The report was prepared by the site engineer and signed off by the project manager and engineer.

Uploaded by

Nwe Oo
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
179 views

Daily Progress Report

This daily report summarizes construction progress for the Myanmar Aquarium Project. It indicates that on August 4th, 72 workers across various trades were on site. Concrete was poured for the second floor slab between grid lines A1 and A5, and brickwork was completed for an IC and WS manhole. Safety protocols were followed and no lost time accidents or near misses occurred during the 383897 hours worked so far. The report was prepared by the site engineer and signed off by the project manager and engineer.

Uploaded by

Nwe Oo
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Daily Report

Project Name: Myanmar Aquarium Project


Project Code:

4YG 04700

Proj Start Date

2014

Contract Period

31-Dec-2016

Remain Period

Estimate Completion Date

Report Date :

4-Aug-2016

Thursday

1 Year Calendar Day


150

No. of Day
AM

Weather

Calendar Day

Report No.

6~8

8~10

DPR-0366

PM
10 ~12

12~2

Surveyer Geotech Workers

Mason

2~4

Fine
4~6

Rain

Smith

Welder

Work Force
Trades

PM

PE

Today

SSE

Trades

Scaffolde Steel
r
Erector

Today

Site Engr QA/QC

QS

2
Roofing
worker

Painter

D&W
Installer

Admin

Safety

Security Site Store


3

Office
Staff

Driver

29

Carpente
r
10

Ceiling
worker

11
Total
72

6
Machine & Equipments onsite

Description

previous

Today

Remarks

Cum.

Description

Excavator

60 Ton Crane

Dozer

50 Ton Crane

Water Boxer

25 Ton Crane

Boom Lift

Generator

previous

Today

Cum.

Remarks

Description

previous

Today

Cum.

Remarks

Material Delivery On Site


Description
AG (G35 ) Boom Pump

FO-OP-01 REV-00

Unit
M3

Quantity
Today

Total

Description

Unit

Quantity
Today

Total

Description

Unit

Quantity
Today

Total

Remarks

142

Page: 1/2

Daily Report
Project Name: Myanmar Aquarium Project
Project Code:

4YG 04700

Report Date :

4-Aug-2016
QC - Test Sampling

Thursday

Item

No. of Day

Report No.

DPR-0366

Remarks

Test 12 Nos ( Mould No - 324~335 ) For Second Floor Slab at F & B Building
Sample
Taken

HSE

LTI Free Day

UA,UC

Near Miss

FAI

MTC

LTA

383897 hrs

Daily TBT
Conducted By
Safety Officer

Confined Space Safety

Works Carried out Details


Trades Of Work
I

Block - A ; F & B Building

Slab

1.1

2
2.1

Casting Concrete for Second Floor Slab

Location

Remark

Between Grid Line ; A1 & A5

COMPLETE

IC-12 ; Near Grid Line A5

COMPLETE

IC & WS Man Hole


Brickwork

Special Event
Visitors
on site

Site
Instructio
n

Purpose
Project Manager
Name
Signature

Project Engineer
Name
Signature

Sai Thaung Nyunt

Prepare By: Site Engineer


Name

Chu Pwint May

Signature

FO-OP-01 REV-00

FO-OP-01 REV-00

Page: 2/2