18
Steel Reinforcement
18
Allignment checking
Buffer time
Concrete placing
14
30
TOTAL
98
Concluding results
a.
b.
c.
d.
SR.NO
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
ITEM OF WORK
SUBSTRUCTURE
R.C.C WORK
SHUTTERING
STEEL
BLOCK WORK
FLY ASH
PLASTERING
PAINTING
SUPERSTRUCTURE
R.C.C
SHUTTERING
STEEL
BLOCK'S
FLY ASH
PLASTERING
PAINTING
MISCELLINEOUS
TOTAL
AMOUNT (Rs)
21336104
6928220
3593984
9252880
640985
N.A
640035
280000
191430834
55874335
52273020
51089116
N.A
N.A
16915308
10118000
5161055
212766937
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
2.
IJER@2016
NO OF DAYS
All Shuttering
ITEM OF WORK
SUBSTRUCTURE
R.C.C WORK
SHUTTERING
STEEL
BLOCK WORK
FLY ASH
PLASTERING
PAINTING
SUPERSTRUCTURE
R.C.C
SHUTTERING
STEEL
BLOCK'S
FLY ASH
PLASTERING
PAINTING
MISCELLINEOUS
TOTAL
AMOUNT
17346624
5313634
3517673
5685030
N.A
1112460
1252461
465365
140379565
27602195
29476823
34354825
20500941
327055
24215831
3871894
30000
157726188
doi : 10.17950/ijer/v5s8/807
Page 673
ACTIVITY
NO OF DAYS
Column shuttering
12
Column steel-reinforcement
12
Buffer
15
12
Levelling
Concrete placing
Removal of formwork
15
Brickwork
30
Plastering
30
Finishing
30
TOTAL
3.
ISSN:2319-6890)(online),2347-5013(print)
1 August 2016
167
Concluding results
a.
b.
c.
d.
Note: Here, according to 167 days per floor total number of days
is 3507 for 21 floors. But, practically on site many activities are
carried simultaneously so the time is reduced by a certain factor
based on experience. Thus, 2592 Days.
VI.
RESUT COMPARISON
On Y- axis: Rs in Cr.
IJER@2016
On Y- axis: Rs in thousand.
Note: The comparison is based on per Sq.ft as the Saleable/floor
area is different in both the cases. Also for comparison of time it
is assumed that the number of workers and working hours on
both the sites is constant.
B. General comparison.
1. Advantages of Mivan formwork over conventional
construction.
a. More seismic resistance- The box type construction
provides more seismic resistance to the structure.
b. Increased durability- The durability of a complete
concrete structure is more than conventional brick bat
masonry.
c. Higher carpet area- Due to shear walls the walls are thin
thus increasing carpet area.
d. Faster completion Unsurpassed construction speed can
be achieved due to light weight of forms.
e. Simplified foundation design due to consistent load
distribution.
2. Limitations of Mivan.
a. Because of small sizes finishing lines are seen on the
concrete surfaces.
b. Concealed services become difficult due to small
thickness of components.
c. It requires uniform planning as well as uniform
elevations to be cost effective.
doi : 10.17950/ijer/v5s8/807
Page 674
IJER@2016
ISSN:2319-6890)(online),2347-5013(print)
1 August 2016
ACKNOWLEDGEMENT
We would like to acknowledge and thank our project guides
Mr. Ram Kadam Sir (H.R), Mr. Atul Joshi, Mr. Sandeep Hirve
(P.M) and Mr. Sameer Pathak from PEGASUS PROPERTIES
PVT.LTD - MEGAPOLIS, Hinjewadi. for sharing and providing
us with all the necessary data and site visits required for
completing the case study without which it would have been
difficult for us to complete the Study.
REFERENCES
i. Emerging Trends in Formwork - Cost Analysis &
Effectiveness of Mivan Formwork over the Conventional Formwork IOSR Journal of Mechanical and Civil Engineering (IOSR-JMCE)
ISSN: 2278-1684, PP: 27-30 www.iosrjournals.org
ii. Second International Conference on Emerging Trends in
Engineering (SICETE)
Dr.J.J.Magdum College of
Engineering, Jaysingpur
iii. "Emerging Trends In Formwork And Scaffolding", CE & CR,
Sep 92.
iv. Comparative analysis on cost and duration of MIVAN
formwork building and Conventional Formwork building International Journal on Recent and Innovation Trends in Computing
and Communication-ISSN: 2321-8169 Volume: 3 Issue: 12
v. Swapnali M. Karke1, M.B. Kumathekar -Comparison of the
use of Traditional and Modern Formwork Systems. Civil Engineering
Systems and Sustainable Innovations ISBN: 97893-83083-78-7
vi. "Emerging Trends In Formwork And Scaffolding", CE & CR,
Sep 92, Pg.46-49.
vii. Formwork & Scaffolding, CE & CR, September 1992, Vol.
05, No. 9, Pg. 4 6-57.
viii. Mivan technology- novateur publications international
journal of innovations in engineering research and technology [ijiert]
issn: 2394-3696 volume 2, issue 3 march2015.
ix. Mivan Technology- International Journal of Engineering and
Technical Research (IJETR) ISSN: 2321-0869, Volume-3, Issue-6, June
2015.
x. Emerging Trends in Formwork - Cost Analysis &
Effectiveness of Mivan Formwork over the Conventional Formwork
IOSR Journal of Mechanical and Civil Engineering (IOSR-JMCE)
ISSN: 2278-1684
doi : 10.17950/ijer/v5s8/807
Page 675