Post-Processing Notes For Ground Penetrating Radar
Post-Processing Notes For Ground Penetrating Radar
The following are progressive notes used as a teaching guide to instruct technical staff in
the used of GPR. This is the second of two parts where the first part describes the use of
the data acquisition system including basic principles of ground penetrating radar.
The post-processing can be divided into five basic steps
I.
Set up the RADAN software and working directory
II.
Initial image clean up and scaling
III.
Vertical then Horizontal filter
IV.
Defining dominant boundaries through the Peak Processing Function
V.
Digitizing and exporting results for compatibility with other systems
I. Set up the RADAN software and working directory
1) If you are really starting from scratch, you must first obtain and install the
RADAN software (https://support.geophysical.com/GSSIsupport/). Follow
directions carefully.
2) Before opening any files, open the software and go to View => Customize and
define a working directory where all input data will reside. Experience from Steve
Arcone (CRREL) suggests that both the source and output files be located in the
same directory per project. Typically, the working folder directory is called
Radandat with the path name you choose.
3) From this step, you are ready to go to File => Open to open up the first DZT file
for processing.
Select => Edit Block to define the start and end scans that bound this data stall.
Once this selection is applied and saved, then go up to the scissors tool on the tool
bar to cut and remove it. Conversely, if the end or begin are to be removed, it is
sometimes easier to save everything in the middle with the icon to the right of the
scissors (two pieces of paper which stand for copy & save). NOTE: Each time
you do this, the system will reprocess to redistribute the scan numbers based on
what was deleted. Given this, always save each step (use X1, X2, etc. in file name
to keep track) and it is advisable to move from left to right of image to keep track
of scan information.
7) When all the above steps are done and the system looks well defined in terms of
all tick marks, all file header values, and the course garbage removal, then the
image can be scale rectified using the command Process => Distance norm.
When you open up this dialog box you will see that scans/m and m/Mark must be
entered. These values must be the same as in the Edit box. There is a small check
box that asks if you are using user marks. Check this box only if the remaining
user marks are exactly at your uniformly spaced distances, then press OK. You
should see new, solid, equi-spaced distance marks with one exactly at the end and
one exactly at the start of the file. Make sure of these results. If not correct then
you may have to do some horizontal stacking to get the spacing approximately
right. Stacking is discussed below.
8) For reasons which will become clear later on, it is probably best to process all 8
data files to this level first before filtering to get familiar with all the data sets.
III. Horizontal and vertical filtering
1) With the file cleaned up as per (II), the image is in good shape for filtering. The
filtering should be done in the following order: a) vertical filtering then b)
horizontal filtering.
2) For this particular sea ice data set, an IIR filter was found to be the best choice
given some initial tests. To select the appropriate bands, it is important to look at
representative samples of the main bottom interface signal (Figure 1). The
difference between the center two peaks is one period which is the time duration
of the RADAR signal at the interface. Samples examined show that the period
(time duration between two consecutive positive, or negative, peaks) at the
bottom of multiyear ice for Line 6 is about 3.3 ns which translates to 1/3.3 ns ~
300 MHz. This should be reviewed carefully for all the data files if a common
filter is to be applied to every one. For the initial data acquisition, a gross filter
threshold was set at 100 MHz for the High Pass (de-wow) and 700 MHz for the
Low Pass (de-Tweet). Initial analysis found a recommended threshold of 200
MHz for the High Pass and 400 MHz for the Low Pass. But as stated above, we
should review the full data set to see if this will hold effectively for both first year
and multiyear sea ice types. This procedure is very fast (seconds) through the
function Process => IIR filter.
3) With the vertical signal cleaned up with the IIR filter, the horizontal spatial
variations, in particular, constant noise bands,can be cleaned up. First use
stacking, also known as Horizontal Compression. located at Process =>
Horizontal ScaleThe stacking should be set to 4. A setting of 4 gives a one meter
averaging window given that we have 100 samples between 25 meter ticks. This
result will yield a very nice 1 m horizontal resolution in the final publishable plot.
4) Next comes horizontal filtering, otherwise known as background removal, This
process gets rid of all constant horizontal clutter, . It is important to first set the
vertical range of the data below the first strong signal at the top so that zero
reference start signal is not removed. The initial analysis with Steve indicates the
start vertical scan should be set around 54 or so down to the bottom 512. Then,
go to IIR filter and choose Horizontal High Pass. Choose 7 scans and see if it
gets rid of the the constant noise bands but preserves the data. If the good data is
destroyed then you need an even wider # of scans. The fewer scans you choose
the more you tend to obliterate everything.
IV. Defining large boundaries through the Peak Processing
1) With the cleaning and filtering done in (II) and (III) the image is in good
condition to be run through the Peak Processor which will remove all signals
except the strongest on. As with the IIR filter, the data scan range should be set to
below the top signal to give a range that goes from just below the surface peak
signal to the bottom of the vertical scan. Again something on the range of 54 to
512.
V. Digitizing and exporting results for compatibility with other systems
1) This is still an ongoing research issue. Geiger is following up with active research
at the University of Delaware.
Point of Contact:
Cathleen Geiger
Geography
University of Delaware
[email protected]
603-646-4851