Group Index Method
Group Index Method
You have follow the corresponding curve for the given traffic and for the one among the three
different curves you can find the total value of the thickness of the pavement. Then there are two
other curves, one to find out the thickness of the sub-base and one to find the thickness of the
base course.
Limitation of Group Index method: Limitation of this method is that this is based only on the
physical properties of the soil and does not consider the strength parameters.
Thank you!