GENERAL INFORMATION
8211.90
Entry Qualification
02 years
1:2
Terminal Behavior
Course Outline :
The training shall comprise ofa) On the job training
The actual training shall be depended on the facilities available in the
establishments with an idea to expose the trainees to as many activities as
possible. The trainee shall maintain a daily work for a job training, which shall
be periodically authenticated by the supervisor.
b) Project
Each apprentice shall under take a project in any of the areas
depending on his/her interest and facilities available in the establishment. The
duration of the project shall be two Weeks.
List of the members present in trade committee meeting held on 13th January 2007 at
ITI, Aundh, Pune, Maharashtra
SR.NO.
1
2
3
4
5
6
8.
9.
10.
11
12.
13.
14.
15.
16.
17.
SHOPFLOOR TRAINING
Single & double actuator circuits (Pneumatics)
Programming as per application
Wiring of PLC, connecting relay logic with PLC
Replacement of burnt relays, contactors etc.
Checking the configuration of PLC as per Hardware
Crimping/soldering of communication cables
Fault finding of Pneumatic multi actuator circuits, checking the sequence.
Repairing the valves replacement of seals, maintenance of pneumatic
system i.e. valves, cylinders etc.
Simple ladder development using PLC like Siemens, ABB, Allen Bradley,
Fanuc, Mitsubishi, Omron, Messung etc.
Installation of Programming Software
Configuration of Driver
Multiple ladder development using PLC
Siemens, ABB, Allen Bradley, Fanuc, Mitsubishi, Omron, Messung etc.
Multiple ladder development
Use of timers in circuit. TON, TOF, RTO
Application of timer in ladder logic time base, preset value, accumulator
value (online checking)
Multiple ladder development
Use of Counters in circuit
CTU, CTD counting mechanism, sensors/LIMIT Switches used for counting
the production.
Connecting the sensor in PLC circuits
Installation of sensors
Replacement of damaged sensors
Speed control, types of attachment required for conveyer system., Belt
tightening, adjustments of speed as per production, maintenance etc.
Basic parameter setting of drives. (Programming) like Siemens, ABB,
ALLEN Bradley, DELTA DANFOSE, B&R, Mitsubishi etc.
Basic parameter setting of drives. (Programming) like Siemens, ABB,
ALLEN Bradley, DELTA DANFOSE, B&R, Mitsubishi etc.
Advanced parameter setting of drives by using keypad (programming) like
Siemens, ABB, ALLEN BRADLEY , DELTA, DANFOSE, B & R, Mitsubishi
etc.
Setting & checking the parameters by using HMI, ON-OFF CONTROL etc.
Controlling the devices by using HMI
Start & stop, DATA setting etc.
18.
19.
20.
21
22
23.
24.
25
26
Preparation of project.
Related Instructions
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
Sensors & types. Two wire, three wire etc.. Inductive, capacitive, optical etc.
12.
13.
Conveyers & types of conveyers. Conveyer system application, speed control, types
of attachment required for conveyer system.
14.
15.
Single phase & three phase A.C. drives, Difference & application.
16.
Introduction to Human Machine Interface (HMI). Setting & checking the parameters
by using HMI
17.
18.
19.
20.
21.
22.
23.
24.
Basic Robotics
25.
Concept of project
26.
Concept of project