0% found this document useful (0 votes)
89 views1 page

Anchor Pattern Planning Chart TSM: 8 APPC7001

This document is a restricted map showing anchor patterns and pipelines in an area. It warns that the map may not be to scale when printed and that the data is only current as of the creation date. It states that sharing the information with parties outside of BSJV staff requires formal consent processes, and in some cases additional approval from the Prime Minister's Office energy department may be needed. The map references anchor pattern planning chart TSM AMDP21, AMRJ13/43 Rev. No. 26-FEB-2014 at a scale of 1:10,000.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
89 views1 page

Anchor Pattern Planning Chart TSM: 8 APPC7001

This document is a restricted map showing anchor patterns and pipelines in an area. It warns that the map may not be to scale when printed and that the data is only current as of the creation date. It states that sharing the information with parties outside of BSJV staff requires formal consent processes, and in some cases additional approval from the Prime Minister's Office energy department may be needed. The map references anchor pattern planning chart TSM AMDP21, AMRJ13/43 Rev. No. 26-FEB-2014 at a scale of 1:10,000.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

WARNING: This Adobe Acrobat PDF format file may NOT be to scale when printed/plotted.

Also, the data in the map


is only as current as the creation date shown in the Title Box. Please see TSM to obtain maps/charts containing the latest data.

B S P R E S T R I C T E D

INFORMATION AND DATA THAT MAY BE FREELY SHARE ONLY WITH BSJV STAFF. SHARING WITH ANY OTHER
PARTIES SUCH AS SHELL GROUP OR ASSOCIATED COMPANIES OR ANY THIRD PARTIES REQUIRES FORMAL
CONSENT THROUGH EITHER THE TECHNICAL RELEASE OF INFORMATION PROCESS OR THE DATA RELEASE
APPROVAL PROCESS (TO BE SUBJECT TO A FURTHER ANNOUNCEMENT).
NOTE : IN SOME CASES ADDITIONAL APPROVAL MAY BE REQUIRED FROM THE ENERGY DEPARTMENT PRIME
MINISTER'S OFFICE.

FOR
REFERENCE
SEE

ANCHOR PATTERN PLANNING CHART

TSM

AMRJ01,AMDP21,AMWJ13/43

REV.NO.:

26-FEB-2014

APPC7001

SCALE 1:10,000

SHC 1001

REVISION DATE:

CHART NUMBER

PLOTTING DATE:

26-FEB-2014

501000 E

500000 E

499000 E

498000 E

AMGP06

(PID.1495) 500mm EGDP01 TO

529000 N

529000 N

AMWJ13

N ED
ANDO

HB
AL
LE
D

O
1
J01 T
MRJ0
AMR
TO A
mm
) 300
PP03
.398
(PID

(P
ID
.50
5)
MO
T

0 ) AB
(PID.3

SWA-75

FA
0mm
7) 30
(PID.3

(
A

P01
FAP
P

m
00m
2) 1 100mm
)
D.5
(PI(PID.323

AMDP21

((
(

J0
1

PIPE
SUSPENDED
(1.2M)

AM

PIPE

500000 E

AMDP06

(PID.35 0) 150mm AMDP06 TO AMRP04

UNIDENTIFIED

499000 E

498000 E

(
(
(
(
(
(
(

P0
6

PIPE
SUSPENDED
(2.1M)

AMRP06

SCRAP PIPE

#(PID.46

SCRAP PIPE

PIPE
SUSPENDED
(1.7M)

01
RJ

AMAP06

PIPE
SUSPENDED
(1.3M)

3) ABA
NDON
ED
(PID.4
#
50) AB
A NDO
N ED

501000 E

#
F
R

AM
G

TO

J0
1

SW

AM
DP
06
TO
ANCHOR PILE
!
2.0M (AMPIL-3) AM

SCRAP PIPE

TO

40

AMR P0
6 TO AM
DP21
9) 100m
m
(PID.13

RJ
01

528000 N

.41
6)
MO
T
(PI
D

AM

AMPA6 STAND BY ALPHA

TO

(P
ID
.33
4)
50
0m

0
RP

5x1x1.6

06
DP

mm
50

AM

AM
RP
06

2
.9
ID
(P

AM

)1
92
D.
(PI

O
1T
P2
D
M

m
0m
30
6)
26
.2
ID
(P

HB
AL
LE
D

08

m
m
50
1
)

TO

04

P
AMP

(P
ID
.1
40
)1
50
m

21
DP
M
A

RP
AM

(P

1 TO
R J0 N
528000
m AM
m
0
0
3
02)
ID.1

SCRAP PIPE

) MO
.101
(PID

PIPE
SUSPENDED
(1.7M)

D
ALLE
T HB

1.1M

##

1.4M

50
0m

AMWJ43

AMRJ-1

AMRJ01

38

You might also like