Proforma Estimate: Kurnool District

The document provides a proforma estimate for the construction of a high level bridge at KM 23/6 of the Banaganapalli-Panyam road in Kurnool District. It involves the construction of a bridge with 4 spans of 8.37 meters each, totaling 33.48 running meters. The estimate also includes 45 lakh rupees for pucca approaches. The total estimated cost is Rs. 350 lakh. The estimate was prepared by the Assistant Engineer of the R&B Section of Nandyal North.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
54 views

Proforma Estimate: Kurnool District

The document provides a proforma estimate for the construction of a high level bridge at KM 23/6 of the Banaganapalli-Panyam road in Kurnool District. It involves the construction of a bridge with 4 spans of 8.37 meters each, totaling 33.48 running meters. The estimate also includes 45 lakh rupees for pucca approaches. The total estimated cost is Rs. 350 lakh. The estimate was prepared by the Assistant Engineer of the R&B Section of Nandyal North.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 16

PROFORMA ESTIMATE

Name of work:-- Construction of High Level Bridge at K.M.23/6 of Banaganapalli - Pan


Kurnool District.
S.No.

1
2

Description

Construction of Bridge with 4 vents of 8.37 Mt. span 4 x 8.37 =


33.48 R.M.
Provision for pucca approaches for joining existing B.T. =
Mt.
SUB TOTAL:

Rs.

Provision for VAT @ 5%

Provision for diversion road

Provision towards RSI

Provision towards Soil exploration

Provision towards Price adjustment etc.

8
9

Provision for variation in foundations and rates


Provision towards Unforseen items & rounding off
GRAND TOTAL

Assistant Engineer,
(R&B) Section, Nandyal North

Rs.

300

6 of Banaganapalli - Panyam road in

Rate/per

Amount(Rs. In
lakhs)

6.00 lakhs/ 1
R.M.

200.88

200.00 lakhs/
1 K.M.

60.00
260.88
10.44
20.00
5.00
10.00
30.00
10.00
3.68
350.00

Dy. Executive Engineer,


(R&B) Sub division, Nandyal

0.00

PROFORMA ESTIMATE

Name of work:-- Providing additional vents and repairs to the existing Bridge at K.M.4
Nandyal - Bujanur road in Kurnool District.
S.No.

Description

Additional vents of Bridge with 4 vents of 8 Mt. span 4 x 8 =


32 R.M.

Provision for pucca approaches for joining existing B.T. =


100 Mt.
SUB TOTAL:

Rs.

Provision for VAT @ 5%

Provision for diversion road and repairs to the existing


Bridge

Provision towards RSI

Provision towards Soil exploration

Provision towards Price adjustment etc.

8
9

Provision for variation in foundations and rates


Provision towards Unforseen items & rounding off
GRAND TOTAL

Assistant Engineer,
(R&B) Section, Nandyal North

Rs.

e existing Bridge at K.M.4/6-8 of

Rate/per

Amount(Rs. In
lakhs)

6.00 lakhs/ 1 R.M.

192.00

200.00 lakhs/ 1
K.M.

20.00
212.00
10.60
30.00
5.00
10.00
20.00
8.00
4.40
300.00
0.00

Dy. Executive Engineer,


(R&B) Sub division, Nandyal

PROFORMA ESTIMATE

Name of work:-- Construction of High Level Bridge at K.M.2/2 of Padakandla to meet C


- Mahadevapuram road (via) Obulampalle, Yadawada in Kurnool District.
S.No.

Description

Construction of Bridge with 6 vents of 8.37 Mt. span 6 x8.37


= 50.22 R.M.

Provision for pucca approaches for joining existing B.T. =


100 Mt.
SUB TOTAL:

Rs.

Provision for VAT @ 5%

Provision for diversion road

Provision towards RSI

Provision towards Soil exploration

Provision towards Price adjustment etc.

8
9

Provision for variation in foundations and rates


Provision towards Unforseen items & rounding off
GRAND TOTAL

Assistant Engineer,
(R&B) Section, Allagadda

Rs.

2 of Padakandla to meet Chagalamarri


District.
Rate/per

Amount(Rs. In
lakhs)

4.50 lakhs/ 1 R.M.

225.99

200.00 lakhs/ 1
K.M.

20.00
245.99
12.30
10.00
5.00
10.00
10.00
6.00
0.71
300.00

Dy. Executive Engineer,


(R&B) Sub division, Nandyal

0.00

PROFORMA ESTIMATE

Name of work:-- Reconstruction of High Level Bridge at K.M.2/8-10 (near Anupur village) of M
to S.Kothur road (via) Anupur in Kurnool District.
S.No.

Description

Rate/per

Construction of Bridge with 5 vents of 10 Mt. span 5 x 10 =


50.00 R.M.

6.00 lakhs/ 1
R.M.

Provision for pucca approaches for joining existing B.T. =


150 Mt.
SUB TOTAL:

Rs.

Provision for VAT @ 5%

Provision for diversion road

Provision towards RSI

Provision towards Protective works

Provision towards Sub Soil exploration

Provision towards Price adjustment etc.

Provision for variation in foundations

10

Provision towards Unforseen items & rounding off


GRAND TOTAL

Assistant Engineer (R&B),


North Section, Nandyal

200.00 lakhs/ 1
K.M.

Rs.

Dy. Executive Engineer


(R&B) Sub division, Nandyal

village) of Maddur
Amount(Rs. In
lakhs)

300.00

30.00
330.00
16.50
5.00
3.00
25.00
5.00
10.00
5.00
0.50
400.00

200.00

PROFORMA ESTIMATE
Name of work:-- Reconstruction of High Level Bridge at K.M.4/4-6 (near S.Kothur village) of
S.Kothur road (via) Anupur in Kurnool District.
S.No.

Description

Construction of Bridge with 8 vents of 8 Mt. span 8 x 8 =


64.00 R.M.

Provision for pucca approaches for joining existing B.T. =


220 Mt.
SUB TOTAL:

Rs.

Provision for VAT @ 5%

Provision for diversion road

Provision towards RSI

Provision towards Protective works

Provision towards Sub Soil exploration

Provision towards Price adjustment etc.

Provision for variation in foundations

10

Provision towards Unforseen items & rounding off


GRAND TOTAL

Assistant Engineer (R&B),


North Section, Nandyal

Rs.

Dy. Executive Engineer


(R&B) Sub division, Nandyal

E
(near S.Kothur village) of Maddur to

Rate/per

Amount(Rs. In
lakhs)

6.00 lakhs/ 1 R.M.

384.00

200.00 lakhs/ 1
K.M.

44.00

ngineer
Nandyal

428.00
21.40
5.00
2.00
30.00
9.00
20.00
4.00
0.60
520.00

-80.00

PROFORMA ESTIMATE

Name of work:-- Construction of High Level Bridge at K.M.5/4-6 of Ongole - Nandyal road to
(via) Boilakuntla in Kurnool District.
S.No.

Description

Construction of Bridge with 6 vents of 10 Mt. span - 6x10 = 60


R.M.

Construction of pucca approaches for joining existing B.T. =


R.M.

250

SUB TOTAL:
4

Provision for VAT @ 5%

Provision for diversion road

Provision towards Road Safety Interventions

Provision towards Soil exploration

Provision towards Quality Control charges

Provision towards Price adjustment etc.

10
11

Provision for variation in foundations and rates


Provision towards Unforseen items & rounding off

GRAND TOTAL :

Assistant Engineer (R&B)


North Section, Nandyal

Rs.

f Ongole - Nandyal road to Mahanandi


Rate/per
6.00 lakhs/ 1 R.M.
200.00 lakhs /1
K.M.

Amount(Rs. In
lakhs)
360.00
50.00
410.00
20.50
25.00
15.00
10.00
5.00
40.00
20.00
4.50

550.00

Dy. Executive Engineer,


(R&B) Sub division, Nandyal

0.00

PROFORMA ESTIMATE

Name of work:-- Construction of High Level Bridge at K.M.23/6 of Banaganapalli - Pan


Kurnool District.
S.No.

1
2

Description

Construction of Bridge with 4 vents of 8.37 Mt. span 4 x 8.37 =


33.48 R.M.
Provision for pucca approaches for joining existing B.T. =
Mt.
SUB TOTAL:

Rs.

Provision for VAT @ 5%

Provision for diversion road

Provision towards RSI

Provision towards Soil exploration

Provision towards Price adjustment etc.

8
9

Provision for variation in foundations and rates


Provision towards Unforseen items & rounding off
GRAND TOTAL

Assistant Engineer,
(R&B) Section, Nandyal North

Rs.

300

3/6 of Banaganapalli - Panyam road in

Rate/per

Amount(Rs. In
lakhs)

6.00 lakhs/ 1
R.M.

200.88

45

200.00 lakhs/
1 K.M.

60.00

2.5

260.88

3.5

10.44
20.00
5.00
10.00
30.00
10.00
3.68
350.00

Dy. Executive Engineer,


(R&B) Sub division, Nandyal

0.00

PROFORMA ESTIMATE

Name of work:-- Construction of High Level Bridge at K.M.1/10 of Maddur approach road in K
District.
S.No.

Description

Construction of Bridge with 8 vents of 16.50 Mt. span 8 x 16.50


= 132.00 R.M.

Provision for pucca approaches for joining existing B.T. =


Mt.
SUB TOTAL:

Rs.

Provision for VAT @ 5%

Provision for diversion road

Provision towards RSI

Provision towards Sub Soil exploration

Provision towards Price adjustment etc.

Provision for variation in foundations

Provision towards Unforseen items & rounding off


GRAND TOTAL

Assistant Engineer,
(R&B) Section, Allagadda

Rs.

Dy. Executive Engineer


(R&B) Sub division, Nandyal

200

addur approach road in Kurnool

Rate/per

Amount(Rs. In
lakhs)

5.00 lakhs/ 1
R.M.

660.00

200.00 lakhs/ 1
K.M.

40.00
700.00
35.00
20.00
5.00
10.00
15.00
14.00
1.00
800.00

-200.00