Client:: Reliance Infrastructure Limited Project

Bore hole BH-LS 274 was drilled between January 1-5, 2013 using rotary drilling methods with 100mm casing to a depth of 10 meters. Samples were taken using standard penetration tests (SPT) at intervals of 1.5 meters. The samples revealed filled up soil from 0-1 meter, soft to stiff grey marine clay from 1-6 meters, and dense clay from 6-10 meters as indicated by increasing SPT blow counts with depth.

Uploaded by

kunalji_jain
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
11 views

Client:: Reliance Infrastructure Limited Project

Bore hole BH-LS 274 was drilled between January 1-5, 2013 using rotary drilling methods with 100mm casing to a depth of 10 meters. Samples were taken using standard penetration tests (SPT) at intervals of 1.5 meters. The samples revealed filled up soil from 0-1 meter, soft to stiff grey marine clay from 1-6 meters, and dense clay from 6-10 meters as indicated by increasing SPT blow counts with depth.

Uploaded by

kunalji_jain
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

CLIENT : RELIANCE INFRASTRUCTURE LIMITED

PROJECT : SOIL INVESTIGATION FOR LS AND SS TOWER LINE IN MIRA BHAYANDER MUNICIPAL AREA
SHEET NO.
BORE HOLE NO.

DATE
METHOD
CASING
DIAMETER

: 1 OF 2
: BH-LS 274

LOCATION
:
REDUCED LEVEL :
GROUND W. T.
: 1.50M
DEPTH DIA. OF
LOG.
(m.) BORE HOLE

SAMPLE
STRATA DESCRIPTION

: 01/01/2013 TO 05/01/2013
: ROTARY DRILLING
: 100 MM UP TO 06.00MTR
: 100 MM AND NX

BLOWS/15cm
SPT
N

DEPTH
(m)

TYPE

1.50/
2.10

SPT1 1 2 2 2

3.00/
3.60

SPT2 2 2 2 2

4.50/
5.10

SPT3 2 3 3 3

6.00/
6.60

SPT4 1

4 4 3

7.50/
8.10

SPT5 2 3 5

9.00/
9.60

SPT6 3 5 5 7

15 15 15 15

CORE
RECOVERY
(%)

RQD
%

Filled up soil
1.00

1.00

2.00

3.00

4.00

5.00

6.00

100
MM

Soft to stiff grey marine Clay

7.00

8.00

9.00

10

10.00
SPT N =STANDARD PENETRATION TEST VALUE

CR = CORE RECOVERY

UDS = UNDISTURBED SOIL SAMPLE

RQD = ROCK QUALITY DESIGNATION

REMARKS : BORE HOLE IS CONTINUED

PARESH CONSTRUCTIONS AND FOUNDATIONS PVT. LTD.

SCALE : 1: 50
JOB NO. : 0464