Cálculo Del Coeficiente De Escurrimiento (Ce) Metodo De Φ Y Ce

This document discusses a method for calculating the runoff coefficient (Ce) using the phi index (Φ) and Ce. It provides examples of applying the method to different rainfall-runoff scenarios. For each scenario it calculates values like rainfall intensity (Φ), actual evaporation (VED), potential evaporation (VII), and the resulting runoff coefficient (Ce) and index of permeability (f). Overall, the document demonstrates a process for evaluating watershed runoff characteristics based on rainfall and evaporation data.

Uploaded by

maime
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
49 views13 pages

Cálculo Del Coeficiente De Escurrimiento (Ce) Metodo De Φ Y Ce

This document discusses a method for calculating the runoff coefficient (Ce) using the phi index (Φ) and Ce. It provides examples of applying the method to different rainfall-runoff scenarios. For each scenario it calculates values like rainfall intensity (Φ), actual evaporation (VED), potential evaporation (VII), and the resulting runoff coefficient (Ce) and index of permeability (f). Overall, the document demonstrates a process for evaluating watershed runoff characteristics based on rainfall and evaporation data.

Uploaded by

maime
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 13

CLCULO DEL COEFICIENTE DE ESCURRIMIENTO (Ce) METODO DE Y Ce

80

12
9.2 9.6

10
8
hp (mm)

6
4
2
0

= 8.29

1.1
1

1.3

mm/h
2

50

40

3.3

3.1

60

50

5.4

5.1

Q (m3/s)

60

7.5

7.1

80

70

VED
30

20
7

10

40

30

10

t(h)

-1

GASTO
3

V ED = [ ( 4 0 )( 0.5 ) + ( 40+6 0 )( 1.0 ) + ( 60+10 0 )( 2 .5 ) + ( 100+7 0 ) ( 1.0 ) + ( 70+5 0 ) ( 2 ) +(5 0)(1.5) ] [1800 = 1 647 000 m 3
hp e = V ED /A [ 1 6 47 000 m 3 ] /[465.191*106 m 2 = 3.54 mm
hp e1

hp e2

hp e3

hp e4

0.0

0.0

0.0

0.0

7.63

F= (hp-

hp e

hp e5
1.57

hp e6
1.97

hp e7

hp e8

hp e9

hp e10

0.0

0.0

0.0

0.0

6
2
3
)*A = (0.0527-0.00354)* (465.191 *10 m = 22 543 155.86 m

V II = hp*A = (0.0527) ( 465.191 *106 m 2 ) = 24 515 565.70 m 3

hpe
3.54

10

Ce

f= (1 -

V ED / V II
Ce i

= (1 647 000 / 24 515 565.70)= 0.067181

= (1-0.067181)*5.27= 4.92 mm/h

5.1

4.8

3.7

4
hp (mm) 3

14

16

Q (m3/s)
3.5
11

2.3

VED

2.2

2
1
0

1.0

0.9

= 3.73
1

mm/h
7

10
GASTO

t(h)
-1

V ED = [ ( 7 ) ( 0.5 ) + ( 7 +10 ) ( 1.0 ) + ( 10+15 ) ( 2 ) + ( 15+13 ) ( 1.0 ) + ( 13+5 ) ( 1.5 ) +(5)(2 .5 ) ] [1800 = 248 400 m 3
hp e = V ED /A [ 248 4 00 m 3 ] /[121.843*106 m 2 = 2.04 mm

3.93

hp e1

hp e2

hp e3

hp e4

hp e5

0.0

0.0

0.0

0.0

0.0

hp e6
1.17

hp e7

hp e8

hp e9

hp e10

0.9

0.0

0.0

0.0

hpe
2.04

F= (hp-

hp e

6
2
3
)*A = (0.0235-0.00204)* (121.843 *10 m = 2 614 750.78 m

V II = hp*A = (0.0235) ( 121.843*10 6 m 2 ) = 2 863 310.5 m 3


Ce =

V ED / V II = (248 400/ 2 863 310.5)= 0.086753

f= (1 -

Ce i

= (1-0.086753)*2.94= 2.68 mm/h

4.5
4
3.5
3
2.5
hp (mm)
2
1.5
1
0.5
0

3.9

30
3.5

2.6

25

2.6

20
20

1.7

1.6
0.5

= 2.62

15

VED

15

0.8

10
10

mm/h
1

30

Q (m3/s)

25

t(h)

10

5
0

GASTO
-1

V ED = [ ( 10 ) ( 0.5 ) + ( 10+15 ) ( 2 ) + ( 15+25 ) (1 ) + ( 25+20 )( 1 ) + ( 20+5 )( 2.5 ) +(5)(1. 5)) ] [1800 = 378 000 m 3
hp e = V ED /A [ 378 0 00 m 3 ] /[181.538 *106 m 2 = 2.08 mm

10

hp e1

hp e2

hp e3

hp e4

hp e5

0.0

0.0

0.0

0.0

0.0

2.66

F= (hp-

hp e

)*A = (0.0172-0.00208)*

hp e6
1.24

hp e7
0.84

hp e8

hp e9

hp e10

0.0

0.0

0.0

hpe
2.08

( 181.538 *106 m 2 = 2 744 854.56 m 3

V II = hp*A = (0.0172) ( 181.538*10 6 m 2 ) = 3 122 453.6 m 3


Ce =

V ED / V II = (378 000/ 3 122 453.6)= 0.121059

f= (1 -

Ce i

= (1-0.121059)*2.15= 1.89 mm/h

40

7
6

5.5

5.8
4.6

5
3.9

4
hp (mm) 3
2
1
0

2.5

2.3

5
t(h)

25

20
1.2

= 4.63
2

VED

25

15
15

10

mm/h
1

35

30
3.5

1.0

40

Q (m3/s)

35

10

10

5
0

-1

GASTO
3

V ED = [ ( 10 ) ( 0.5 ) + ( 10+3 0 ) ( 1 ) + ( 30+40 )( 1 ) + ( 40+35 ) ( 1.5 ) + ( 35 +5 ) (2 ) +(5)(2. 5) ] [1800 = 576 000 m 3


hp e = V ED /A [ 576 0 00 m 3 ] /[279.957*10 6 m 2 = 2.06 mm
hp e1

hp e2

hp e3

hp e4

0.0

0.0

0.0

0.0

4.62

F= (hp-

hp e

)*A = (0.0303-0.00206)*

hp e5
0.88

hp e6
1.18
6

hp e7

hp e8

hp e9

hp e10

0.0

0.0

0.0

0.0

( 279.957 *10 m = 7 905 985.68 m

V II = hp*A = (0.0303) ( 279.957 *106 m 2 ) = 8 482 697.1 m 3


Ce =

V ED / V II = (576 000/ 8 482 697.1)= 0.067903

f= (1 -

Ce i

= (1-0.067903)*3.37= 3.14 mm/h

hpe
2.06

9
8
7
6
5
hp (mm) 4
3
2
1
0

35

8.0 8.3

35
30

6.5

6.2

25

4.6

4.4

25
20
20

2.8

2.7

1.1

= 7.12

mm/h
2

VED

15

0.9
1

Q (m3/s)

15
10
10

10

t(h)

GASTO
-1

V ED = [ ( 15 ) ( 0.5 ) + ( 15+20 ) ( 2 ) + ( 20+35 ) ( 2.5 ) + ( 35+25 ) (1 ) + ( 25+10 )( 1 ) +(10 )(1.5) ] [1800 = 585 000 m 3
hp e = V ED /A [ 585 0 00 m 3 ] /[199.139*106 m 2 = 2.94 mm
hp e1

hp e2

hp e3

hp e4

0.0

0.0

0.0

0.0

6.68

F= (hp-

hp e

)*A = (0.0455-0.00294)*

hp e5
1.32

hp e6
1.62
6

hp e7

hp e8

hp e9

hp e10

0.0

0.0

0.0

0.0

( 199.139 *10 m = 8 475 355.84 m

V II = hp*A = (0.0455) ( 199.139*10 6 m 2 ) = 9 060 824.5 m 3


Ce =

V ED / V II = (585 000/ 9 060 824.5)= 0.064564

hpe
2.94

Ce i

f= (1 -

= (1-0.064564)*4.55= 4.26 mm/h

12.8 13.2

14
12

hp (mm)

6
4
2
0

70

60
60

50

4.9

4.6
= 11.82
1.8

90

Q (m3/s)

70
7.7

7.3

80

10.4

10.0

10

90

2.3

mm/h

VED

40
40

30

30

20
1

10

10

t(h)

-1

V ED = [ ( 30 ) ( 0.5 ) + ( 30+50 ) ( 2 ) + ( 50+80 ) (1.5 ) + ( 80+60 ) ( 1.5 ) + ( 60+20 ) ( 1 ) +(20)(1.5) ] [1800 = 1 314 000 m 3
hp e = V ED /A [ 1 314 000 m 3 ] /[525.605*10 6 m 2 = 2.50 mm
hp e1

hp e2

hp e3

hp e4

0.0

0.0

0.0

0.0

11.75

F= (hp-

hp e

)*A = (0.0750-0.00250)*

hp e5
1.05

hp e6
1.45

hp e7

hp e8

hp e9

hp e10

0.0

0.0

0.0

0.0

( 525.605 *106 m 2 =38 106 362.50 m 3

hpe
2.50

V II = hp*A = (0.0750) ( 525.605*10 6 m 2 ) = 39 420 375.0 m 3


Ce =

V ED / V II = (1 314 000/ 39 420 375.0)= 0.033333

f= (1 -

Ce i

= (1-0.033333)*7.5= 7.25 mm/h

5.1

5
3.5

hp (mm) 3

25
1.9

= 4.25

15

0.8

15

10
7

VED

25

20

mm/h
2

35

30
3.1

0.7

40

Q (m3/s)

35

2.1

40
4.2

5.6

10

t(h)

10

5
0

-1

V ED = [ ( 10 ) ( 0.5 ) + ( 10+20 ) ( 1.5 ) + ( 20+35 ) ( 1 ) + ( 35+25 )( 2.5 ) + ( 25 +5 )( 2 ) +(5)(1) ] [1800 = 576 000 m 3
hp e = V ED /A [ 576 0 00 m 3 ] /[259.374 *106 m 2 = 2.22 mm

hp e1

hp e2

hp e3

hp e4

hp e5

hp e6

hp e7

hp e8

hp e9

hp e10

hpe

4.24

0.0

F= (hp-

0.0

hp e

0.0

0.0

0.86

)*A = (0.0270-0.00222)*

1.36

0.0

0.0

0.0

0.0

2.22

( 259.374 *10 6 m 2 = 6 427 287.72 m 3

V II = hp*A = (0.0270) ( 259.374 m 2 ) = 7 003 098.0 m 3


Ce =

V ED / V II = (576 000/ 7 003 098.0)= 0.082249

f= (1 -

Ce i

= (1-0.082249)*3.0= 2.75 mm/h

3.7

3.5
3

2.5

2.5
hp (mm)

0.5
0

5
t(h)

mm/h

25

20

1.4

= 2.53
2

Q (m3/s)

25

2.3

0.5

35

30

1.5

1.5
1

35

3.4

0.5
8

20

15
10
9

10

VED

15
10

5
0

-1

V ED = [ ( 5 ) ( 0.5 ) + ( 5 +15 ) (1 ) + ( 15+30 )( 1 .5 ) + ( 30 +20 ) ( 1 ) + ( 20+10 ) (2 ) +(10)(2.5) ] [1800 = 405 000 m 3

hp e = V ED /A [ 405 0 00 m 3 ] /[200.411 *106 m 2 = 2.02 mm


hp e1

hp e2

hp e3

hp e4

hp e5

0.0

0.0

0.0

0.0

0.0

2.54

F= (hp-

hp e

hp e6

hp e7

1.16

0.86

hp e8

hp e9

hp e10

0.0

0.0

0.0

hpe
2.02

( 200.411 *106 m 2 = 2 761 663.58 m 3

)*A = (0.0158-0.00202)*

V II = hp*A = (0.0158) ( 200.411 *106 m 2 ) = 3 166 493.8 m 3


Ce =

V ED / V II = (405 000/ 3 166 493.8)= 0.127902

f= (1 -

Ce i

= (1-0.127902)*1.98= 1.73 mm/h

8
7

5.9

25
4.3

hp (mm) 4
3

3.1

20
20

2.8

15
10

mm/h
1

5
t(h)

VED

15
1.4

= 5.92

1.2

1
0

30

Q (m3/s)

25

5.1

30

7.1 7.4

10
7

10

5
0

-1

V ED = [ ( 10 ) ( 0.5 ) + ( 10+15 ) ( 1 ) + ( 15+25 )( 1 ) + (25+20 )( 1.5 ) + (20+5 )( 2 ) +(5)(2.5 )) ] [1800 = 360 000 m 3
hp e = V ED /A [ 360 0 00 m 3 ] /[153.758 *106 m 2 = 2.34 mm
hp e1

hp e2

hp e3

hp e4

0.0

0.0

0.0

0.0

6.08

F= (hp-

hp e

)*A = (0.0383-0.00234)*

hp e5
1.02

hp e6
1.32
6

hp e7

hp e8

hp e9

hp e10

0.0

0.0

0.0

0.0

( 153.758 *10 m = 5 529 137.68 m

V II = hp*A = (0.0383) ( 153.758*10 6 m 2 ) = 5 888 931.4 m 3


Ce =

V ED / V II = (360 000/ 5 888 931.4)= 0.061132

f= (1 -

Ce i

= (1-0.061132)*4.26= 4.00 mm/h

hpe
2.34

8
6.6

7
6

1
0

5.5

2.9

30
25

20

VED

10
7

10

t(h)

5
0

-1

V ED = [ ( 20 ) ( 0.5 ) + ( 20+25 ) ( 1.5 ) + ( 25+35 ) ( 1 ) + ( 35+30 ) ( 2 ) + ( 30+15 ) (1 ) +(15)(2.5 ) ] [1800 = 630 000 m 3
hp e = V ED /A [ 630 0 00 m 3 ] /[256.479*10 6 m 2 = 2.46 mm
hp e1

hp e2

hp e3

hp e4

0.0

0.0

0.0

0.0

5.57

F= (hp-

hp e

)*A = (0.0355-0.00246)*

hp e5
1.03

hp e6
1.43

hp e7

hp e8

hp e9

hp e10

0.0

0.0

0.0

0.0

( 256.479 *106 m 2 = 8 474 066.16 m 3

V II = hp*A = (0.0355) ( 256.479 m 2 ) = 9 105 004.5 m 3


Ce =

20

15

1.1

= 5.60

mm/h

35

25
2.5

1.1

40

Q (m3/s)

30
4.0

hp (mm) 4
3
2

35

4.8

40

7.0

V ED / V II = (630 000/ 9 105 004.5)= 0.069193

hpe
2.46

f= (1 -

Ce i

= (1-0.069193)*3.94= 3.67 mm/h

You might also like