Time & Work (Cat Quants Questions) - Area Test 2
Time & Work (Cat Quants Questions) - Area Test 2
1.
A person can do a job in 15 days. His Uncle takes 12 days and his friend finishes it in 60 days.
How long will they take to complete the job if they all work together?
1. Less than 6 days
3. More than 6 days
2.
A punctured tyre can deflate in 12 min. while a pumping machine takes 3 minutes to
completely inflate a tyre. What will be the time taken to inflate the tyre when both the leak
and pump are working together?
1. 5 minutes
3.
3. 10 min
4. None of these
2. 15 days
3. 64 days
4. None of these
2.
3.
4.
2. Rs. 60
3. Rs. 90
4. Rs. 120
5 identical kilns can produce a total of 300 bricks per minute by running at a constant rate.
How many bricks could 10 such kilns produce in 5 minutes?
1. 1000
8.
2. 25 min
Sumit can do a work in 6 days while Deepak can do the same work in 4 days. Both of them
finish the work together and get Rs. 300. What is the share of Sumit?
1. Rs. 30
7.
4. None of these
A can do a work in 10 days and B in 25 days. If they work on it together for 5 days, then the
fraction of the work that is left is:
1.
6.
3. 7 minutes
A man can complete 3/8 of a work in 24 days. At this rate, how much more time is required to
complete the work?
1. 40 days
5.
2. 6 minutes
A tank is filled by a pipe A in 20 min. and pipe B in 30 min. When filled, it can be emptied by
pipe C in 10 minute. If all the three pipes are opened simultaneously, 2/3rd of tank will be
filled in
1. 15 min
4.
2. Exactly 6 days
4. Exactly 10 days
2. 1800
3. 3000
4. 3600
P can do a piece of work in 16 days. P undertook to do it for Rs. 400. With the help of Q, he
finishes the work in 12 days. Ps share is
1. Rs. 80
2. Rs. 125
3. Rs. 100
4. Rs. 120
9.
A can finish a job in 15 days and B can do the same work in 18 days. A worked for 10 days and
left the job. In how many days, B alone can finish the remaining work?
1. 5 days
10.
4. Rs. 1200
3. 4
4. 64
2. 60 minutes
3. 30 minutes
4. 15 minutes
X is thrice as good a workman as Y and therefore is able to finish a job in 60 days less than Y.
What is the time taken to do twice the work when they are working together ?
2. 22.5 days
3. 25 days
4. 30 days
A pipe can fill a tank in 10 min. There is a leak which can empty the tank in 30 min. When both
these are working together, the tank would be filled in
1. 30 min
15.
3. Rs. 1000
A tap can fill a cistern in 10 minutes. Another tap can empty it in 15 minutes. If both the taps
are opened simultaneously, then the cistern will be filled in
1. 45 days
14.
2. Rs. 900
2. 8
1. 40 minutes
13.
4. 8 days
If 8 cows can be give 80 litres of milk in 8 days, then 1 cow will give 1 litre of milk in how many
days at the same rate?
1. 1
12.
3. 5.5 days
A can do a piece of work in 24 days and B can do the same piece of work in 36 days. A and B
together complete the same piece of work and get Rs. 2000 as the combined wages. As share
of the wage will be
1. Rs. 800
11.
2. 6 days
2. 25 min
3. 15 min
4. 40 min
Some students can complete an assignment in 12 days. How many days will be taken by two
times the number of such students for 1/3rd of this assignment ?
1. 6 days
2. 4 days
3. 3 days
4. 2 days
2.4
9.2
3. 3
10. 4
4.1
11.2
5. 4
12. 3
6. 4
13.1
7. 3
14. 3
= 6 days.
2.
Work done in 1 minute =
=
Time taken to inflate the tyre when both the leak and pump are working together = 12/3 = 4 minutes.
3.
One minute work of three pipes =
They will fill the full tank in =
4.
=
= 15 min
5.
As 1 day work =
; Bs 1 day work =
6.
Remaining work =
Sumits wages : Deepaks wages
= Sumits 1 days work : Deepaks 1 days work =
7.
8.
(P+Q)s 1 days work =
9.
, Ps 1 days work =
Qs 1 days work =
= Rs. 125
10.
As 1 days work =
, Bs 1 days work =
11.
=3:2
= Rs.
12.
13.
14.
15.