0% found this document useful (0 votes)
29 views

Bab 1 Perhitungan Perencanaan

This document discusses the planning and design of floor plates and roof plates for a school building. It includes calculations for loadings, bending moments, and reinforcement requirements. Load calculations consider dead loads from self-weight of concrete and finishes, and live loads from occupancy. Bending moments are determined for different plate types and orientations. Reinforcement ratios and bar sizes are then designed to resist the calculated bending moments with consideration for code-specified minimum and maximum reinforcement ratios.

Uploaded by

suherman_mojo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
29 views

Bab 1 Perhitungan Perencanaan

This document discusses the planning and design of floor plates and roof plates for a school building. It includes calculations for loadings, bending moments, and reinforcement requirements. Load calculations consider dead loads from self-weight of concrete and finishes, and live loads from occupancy. Bending moments are determined for different plate types and orientations. Reinforcement ratios and bar sizes are then designed to resist the calculated bending moments with consideration for code-specified minimum and maximum reinforcement ratios.

Uploaded by

suherman_mojo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 16

BAB 1

PERHITUNGAN PERENCANAAN
1.1 Perencanaan Plat Lantai
Direncanakan plat gedung sekolah dengan :
Fc = 25 Mpa dan Fy = 250 Mpa
1.1.A Perhitungan Pembebanan Plat Lantai
a. Beban Hidup (ql)
Berdasarkan PPURG 1987 yaitu :
Beban hidup fungsi sekolah adalah = 250 kg/m
b. Beban mati (qd)
Tebal plat 125 mm
Berat sendiri

= 0,125 x 1 x 2500 kg/m = 312,5 kg/m

Keramik,tebal 2 cm

= 0,02 x 2500 kg/m

= 50 kg/m

Spasi, tebal 2 cm

= 0,02 x 2100 kg/m

= 42 kg/m

Beban plafon + etemit

= 11 + 7 kg/m

= 18 kg/m
qd = 422,5 kg/m

c. Beban ultimate (qu)


Untuk tinjau lebar plat 1 m maka :
qu

= 1,2 qd + 1,6 ql
= 1,2 (422,5) + 1,6 (250)
= 907 kg/m2

1.1.B Perhitungan Momen


Menetukan momen yang bekerja akibat beban terfaktor
a. Plat Tipe 1
Ly = 7 m
Lx = 5 m
Ly/Lx = 1,4 m
Mlx = 0,001 x qu x lx2 x 34

= 0,001 x 907 x 52 x 34 = 770,95 kg.m


Mly = 0,001 x qu x lx2 x18
= 0,001 x 907 x 52 x 18 = 408,15 kg.m
Mtx = -0,001 x qu x lx2 x 73
= -0,001 x 907 x 52 x 73 = 1655,275 kg.m
Mty = -0,001 x qu x lx2 x 57
= -0,001 x 907 x 52 x 57 = 1292,475 kg.m
b. Plat Tipe 2
Ly = 7
Lx = 10
Ly/Lx = 7/10 = 0,7 m
Mlx=Mly = 0,001 x qu x lx2 x 21
= 0,001 x 907 x 102 x 21 = 1904,7 kg.m
Mtx=Mty = -0,001 x qu x lx2 x 52
= -0,001 x 907 x 102 x 52 = 4716,4 kg.m
c. Plat Tipe 3
Ly = 5
Lx = 5
Ly/Lx = 5/5 = 1 m
Mlx=Mly = 0,001 x qu x lx2 x 21
= 0,001 x 907 x 52 x 21 = 476,175 kg.m
Mtx=Mty = -0,001 x qu x lx2 x 52
= -0,001 x 907 x 52 x 52 = 1179,1 kg.m
d. Plat Tipe 4
Ly = 5
Lx = 10
Ly/Lx = 5/10 = 0,5 m
Mlx=Mly = 0,001 x qu x lx2 x 21
= 0,001 x 907 x 102 x 21 = 1904,7 kg.m

Mtx=Mty = -0,001 x qu x lx2 x 52


= -0,001 x 907 x 102 x 52 = 4716,4 kg.m
Jadi momen yang dipakai
Mlx=Mly = 1904,7 kg.m
Mtx=Mty = 4716,4 kg.m
Data : tebal plat

= 12,5 cm = 125 mm

Tebal penutup

= 20 mm

Diameter tulangan = 6 mm
Tinggi efektif
Dx = h p = 125 20 (10) = 100 mm
Dy = h p = 125 20 10 (10) = 90 mm
1.1.C Perhitungan Tulangan

Tebal plat
Fc
Fy
Tebal penutup beton
Diameter tulangan

=0,850,05

0,850,05

b=

= 125 mm
= 25 Mpa
= 250 Mpa
= 20 mm
= 10 mm

f ' c28
7

( 2528
7 )

= 0,871

0,85 f ' c
600

fy
600+ fy

0,85 25 0,871
600

250
600+250

max = 0,75 . b
= 0,75 . 0,052 = 0,039
0,25 fc
min =
fy
=

0,25 25
250

= 0,005

a. Penulangan Lapangan Arah X

= 0,052

Rn=

Mn
b d 2
4

1904,7 10
0,8

2
1000 100

m=

fy
0,85 f ' c
250
0,85 25

perlu =

= 11,765

1
2 Rnm
1 1
m
fy

= 2,381 N/mm2

1
2 2,381 11,765
1 1
11,765
250

perlu > min (digunakan perlu = 0,01013)


As= b d
0,01013 1000 100

= 1013 mm2

Jarak antar tulangan


2
d b
4
s=
As
2
10 1000
4

1013

= 77,532 = 75 mm

Cek jarak antar tulangan s < 2h (pelat dua arah)


s < 2h
75 < 2(125)
75 < 250 OK!
Jadi yang digunakan 10 75 mm
b. Penulangan Lapangan Arah Y

Rn=

Mn
b d 2

1904,7 10
0,8

2
1000 90

= 2,939 N/mm2

= 0,01013

m=

fy
0,85 f ' c
250
0,85 25

perlu =

1
2 Rnm
1 1
m
fy

= 11,765

1
2 2,939 11,765
1 1
11,765
250

perlu > min (digunakan perlu =0,01271)


As= b d
0,01271 1000 90 = 1143,9 mm2

Jarak antar tulangan


2
d b
4
s=
As

2
10 1000
4

1143,9

= 68,660 = 75 mm

Cek jarak antar tulangan s < 2h (pelat dua arah)


s < 2h
75 < 2(125)
75 < 250 OK!
Jadi yang digunakan 10 75 mm
c. Penulangan Tumpuan Arah X

Rn=

Mn
2
b d

4716,4 104
0,8

1000 1002

m=

= 5,896 N/mm2

fy
0,85 f ' c
250
0,85 25

perlu =

= 11,765

1
2 Rnm
1 1
m
fy

= 0,01271

1
2 5,896 11,765
1 1
11,765
250

= 0,02829

perlu > min (digunakan perlu =0,02829)


As= b d
0,0 2829 1000 100 = 2829 mm2

Jarak antar tulangan


2
d b
4
s=
As

10 2 1000
4

2829

= 27,762 = 75 mm

Cek jarak antar tulangan s < 2h (pelat dua arah)


s < 2h
75 < 2(125)
75 < 250 OK!
Jadi yang digunakan 10 75 mm
d. Penulangan Lapangan Arah Y

Rn=

Mn
b d 2
4

4716,4 10
0,8

1000 902

m=

fy
0,85 f ' c
250
0,85 25

perlu =

= 11,765

1
2 Rnm
1 1
m
fy

= 7,278 N/mm2

1
2 7,278 11,765
1 1
11,765
250

perlu > min (digunakan perlu =0,03729)


As= b d
0,03729 1000 90

Jarak antar tulangan

= 3356,1 mm2

= 0,03729

2
d b
4
s=
As

2
10 1000
4

3356,1

= 23,402 = 75 mm

Cek jarak antar tulangan s < 2h (pelat dua arah)


s < 2h
75 < 2(125)
75 < 250 OK!
Jadi yang digunakan 10 75 mm
REKAPITULASI TULANGAN

Tulangan lapangan arah x


Tulangan lapangan arah y
Tulangan tumpuan arah x
Tulangan tumpuan arah x

= 10 75 mm
= 10 75 mm
= 10 75 mm
= 10 75 mm

1.2 Perencanaan Plat Atap


Direncanakan plat gedung sekolah dengan :
Fc = 25 Mpa dan Fy = 250 Mpa
1.2.A Perhitungan Pembebanan Plat Atap
d. Beban Hidup (ql)
Berdasarkan PPURG 1987 yaitu :
Beban hidup fungsi sekolah adalah = 250 kg/m
Dibagi 2 menjadi = 125 kg/m
e. Beban mati (qd)
Tebal plat 125 mm
Berat sendiri

= 0,125 x 1 x 2500 kg/m = 312,5 kg/m

Spasi, tebal 2 cm

= 0,02 x 2100 kg/m

= 42 kg/m

Beban plafon + etemit

= 11 + 7 kg/m

= 18 kg/m

Berat air hujan 2 cm

= 0,02 x 1000 kg/m

= 20 kg/m
qd = 392,5 kg/m

f. Beban ultimate (qu)


Untuk tinjau lebar plat 1 m maka :
qu

= 1,2 qd + 1,6 ql
= 1,2 (392,5) + 1,6 (125)
= 671 kg/m2

1.2.B Perhitungan Momen


Menetukan momen yang bekerja akibat beban terfaktor
e. Plat Tipe 1
Ly = 7 m
Lx = 5 m
Ly/Lx = 1,4 m
Mlx = 0,001 x qu x lx2 x 34
= 0,001 x 671 x 52 x 34 = 570,35 kg.m
Mly = 0,001 x qu x lx2 x18
= 0,001 x 671 x 52 x 18 = 301,95 kg.m

Mtx = -0,001 x qu x lx2 x 73


= -0,001 x 671 x 52 x 73 = 1224,575 kg.m
Mty = -0,001 x qu x lx2 x 57
= -0,001 x 671 x 52 x 57 = 956,175 kg.m
f. Plat Tipe 2
Ly = 7
Lx = 10
Ly/Lx = 7/10 = 0,7 m
Mlx=Mly = 0,001 x qu x lx2 x 21
= 0,001 x 671 x 102 x 21 = 1409,1 kg.m
Mtx=Mty = -0,001 x qu x lx2 x 52
= -0,001 x 671 x 102 x 52 = 3489,2 kg.m
g. Plat Tipe 3
Ly = 5
Lx = 5
Ly/Lx = 5/5 = 1 m
Mlx=Mly = 0,001 x qu x lx2 x 21
= 0,001 x 671 x 52 x 21 = 352,275 kg.m
Mtx=Mty = -0,001 x qu x lx2 x 52
= -0,001 x 907 x 52 x 52 = 872,3 kg.m
h. Plat Tipe 4
Ly = 5
Lx = 10
Ly/Lx = 5/10 = 0,5 m
Mlx=Mly = 0,001 x qu x lx2 x 21
= 0,001 x 671 x 102 x 21 = 1409,1 kg.m
Mtx=Mty = -0,001 x qu x lx2 x 52
= -0,001 x 671 x 102 x 52 = 3489,2 kg.m

Jadi momen yang dipakai


Mlx=Mly = 1409,1 kg.m
Mtx=Mty = 3489,2 kg.m
Data : tebal plat

= 12,5 cm = 125 mm

Tebal penutup

= 20 mm

Diameter tulangan = 6 mm
Tinggi efektif
Dx = h p = 125 20 (10) = 100 mm
Dy = h p = 125 20 10 (10) = 90 mm
1.2.C Perhitungan Tulangan

Tebal plat
Fc
Fy
Tebal penutup beton
Diameter tulangan

=0,850,05

0,850,05

= 125 mm
= 25 Mpa
= 250 Mpa
= 20 mm
= 10 mm

f ' c28
7

( 2528
7 )

= 0,871

0,85 f ' c
600
b=

fy
600+ fy

0,85 25 0,871
600

250
600+250

max = 0,75 . b
= 0,75 . 0,052 = 0,039
0,25 fc
min =
fy
=

0,25 25
250

= 0,005

a. Penulangan Lapangan Arah X

= 0,052

Rn=

Mn
b d 2
4

1409,1 10
0,8

2
1000 100

m=

fy
0,85 f ' c
250
0,85 25

perlu =

= 11,765

1
2 Rnm
1 1
m
fy

= 1,761 N/mm2

1
2 1,761 11,765
1 1
11,765
250

perlu > min (digunakan perlu = 0,007363)


As= b d
0,007363 1000 100 = 736,3 mm2

Jarak antar tulangan


2
d b
4
s=
As
2
10 1000
4

736,3

= 106,668 = 100 mm

Cek jarak antar tulangan s < 2h (pelat dua arah)


s < 2h
100 < 2(125)
100 < 250 OK!
Jadi yang digunakan 10 100 mm
e. Penulangan Lapangan Arah Y

Rn=

Mn
b d 2

1409,1 10
0,8

1000 902

m=

fy
0,85 f ' c

= 2,175 N/mm2

= 0,007363

250
0,85 25

perlu =

1
2 Rnm
1 1
m
fy

= 11,765

1
2 2,175 11,765
1 1
11,765
250

perlu > min (digunakan perlu =0,009198)


As= b d
0,009198 1000 90 = 827,82 mm2

Jarak antar tulangan


2
d b
4
s=
As

10 2 1000
4

827,82

= 94,876 = 100 mm

Cek jarak antar tulangan s < 2h (pelat dua arah)


s < 2h
100 < 2(125)
100 < 250 OK!
Jadi yang digunakan 10 100 mm
f. Penulangan Tumpuan Arah X

Rn=

Mn
b d 2

3489,2 104
0,8

2
1000 100

m=

= 4,362 N/mm2

fy
0,85 f ' c
250
0,85 25

perlu =

= 11,765

1
2 Rnm
1 1
m
fy

= 0,009198

1
2 4,362 11,765
1 1
11,765
250

= 0,01974

perlu > min (digunakan perlu =0,01974)


As= b d
0,0 1974 1000 100 = 1974 mm2

Jarak antar tulangan


2
d b
4
s=
As

10 2 1000
4

1974

= 39,787 = 50 mm

Cek jarak antar tulangan s < 2h (pelat dua arah)


s < 2h
50 < 2(125)
50 < 250 OK!
Jadi yang digunakan 10 50 mm
g. Penulangan Lapangan Arah Y

Rn=

Mn
b d 2
4

3489,2 10
0,8

1000 902

m=

fy
0,85 f ' c
250
0,85 25

perlu =

= 11,765

1
2 Rnm
1 1
m
fy

= 5,385 N/mm2

1
2 5,385 11,765
1 1
11,765
250

perlu > min (digunakan perlu =0,02531)


As= b d
0,02531 1000 90 = 2277,9 mm2

Jarak antar tulangan

= 0,02531

2
d b
4
s=
As

2
10 1000
4

2277,9

= 34,479 = 50 mm

Cek jarak antar tulangan s < 2h (pelat dua arah)


s < 2h
50 < 2(125)
50 < 250 OK!
Jadi yang digunakan 10 50 mm
REKAPITULASI TULANGAN

Tulangan lapangan arah x


Tulangan lapangan arah y
Tulangan tumpuan arah x
Tulangan tumpuan arah x

= 10 100 mm
= 10 100 mm
= 10 50 mm
= 10 50 mm

1.2 Perencanaan Tangga


Data perencanaan :
Tipe tangga
= tangga tetap
Lebar tangga
= 1,2 m = 120 cm
Panjang bordes = 1,2 m = 120 cm
Elevasi bordes
= 2 m = 200 cm
Perbedaan elevasi bordes = 4 m = 400 cm
Penentuan anak tangga tegak (optrede) ditaksir 20 cm.
Kontrol :
A + 2(O) = 57 65 cm
A + (2x20) = 57 65 cm
(57 65) (2x20) = 17 25 cm
Jadi panjang langkah datar (antrede) = 23 cm. Jika tangga tersebut dibuat
tangga lurus maka panjang ruang yang dibutuhkan untuk tangga yaitu : 23 x
20 = 460 cm, belum terhitung awal naik tangga dan akhir tangga.
Oleh karena itu lebih hemat bila mnggunakan tangga bordes dengan dua
lengan maka :
Banyaknya langkah naik n (A) = x 400/20 = 10
N langkah datar (O)
= 10 1 = 9 buah
Panjang tangga seluruhnya
= 9 x 21 = 207 cm
Panjang bordes = 120 cm, entrance tangga = 120 cm
Maka panjang ruangan untuk tangga menjadi = 447 cm
Miring tangga
z = y /x
= 400 / 447 = 0,895 = 1 koefisien tangga, jadi termasuk tangga curam dan
tangga hemat 75o
Direncanakan :

Anak tangga menggunakan plat baja t = 0,5 cm


Berat baja = 7850 kg/m2
Balok tangga menggunakan baja profil C

1.3 Perencanaan Balok


Data :
Baja BJ 41
Es = 2 x 105 Mpa

Fu = 410 Mpa

Fy = 250 Mpa

Wd = 4,225 kg/m

Wl = 2,50 kg/m
Wu = 1,2 Wd + 1,6 Wl
= 1,2(4225) + 1,6(250) = 9,07 kg/m

Mu = 1/8 Wu L2
= 1/8 x 9,07 x 52 = 2834,375 kgm (tipe 1)

Mu = 1/8 Wu L2
= 1/8 x 907 x 102 = 11337,5 kgm (tipe 2)

1) Diasumsikan balok bertipe kompak


Mn=Mp=Zx.fy < 1,5 My
Zx < 1,5Sx
Dari Mn > Mu
Zx.fy > Mu
1,5.Sx.fy > Mu
Sx >
Sx =

Mu
1,5 fy

2834,375 10 4
0,5 1,5 250